Council archive · source document
The Hastings Unit 19 - Planning Report · 51983.3225.13
is sympathetic to the site’s coastal context which is reflective of the palette of materials proposed.
(d) changes the ability of the proposed development to operate as intended; or
No change to the current use is proposed.
(e) removes a component that is integral to the operation of the development; or
The proposal does not remove a component that is integral to the operation of the development.
(f) significantly impacts on traffic flow and the transport network, such as increasing traffic
to the site; or
The proposal will have no change to the traffic flow or transport network.
(g) introduces new impacts or increase the severity of known impacts; or
No new impacts will be introduced.
(h) removes an incentive or offset component that would have balanced a negative impact
of the development; or
The proposal does not remove any incentive or offset component.
(i) impacts on infrastructure provisions.
The proposal will not impact upon the current and future infrastructure provisions.
The proposed change to the existing approval is considered to meet the requirements detailed
under the Planning Act 2016 and the Development Assessment Rules 2017 for a Minor Change and
will not result in a substantially different development. The proposed changes are considered minor
changes under the Act.
RG Strategic Town Planning Report – Minor Change to Development Approval 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
The Hastings Unit 19 - Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.