Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Attachment E - Updated SWMP and MUSIC Modelling

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 16, section 1. The text section number identifies this passage in the reader.

6.2.1.3 Model Selection, Assumption & Removal Effectiveness
In accordance with the Water by Design MUSIC Modelling Guidelines, split catchment methods were used for
the source Nodes utilizing modified % impervious area. Also, rainfall threshold, soil properties & pollutant
concentration input values were sourced from the guideline.
The MUSIC modelling inputs for the rainfall source nodes are shown below.
Table 7 - Music Source Parameters

                  Source Node Parameters – Sub Catchments                      Commercial

                                  Rainfall Threshold (mm/day)                      1

                                   Soil Storage Capacity (mm)                      18

                                 Initial Storage (% of Capacity)                   10

                                           Field Capacity                          80

                               Infiltration Capacity Coefficient - a              243
                  Rainfall -
                   Runoff
                                Infiltration Capacity Exponent - b                0.60

                                          Initial Depth (mm)                       50

                                       Daily Recharge Rate (%)                     0

                                       Daily Base flow Rate (%)                    31

                                  Daily Deep Seepage Rate (%)                      0


Base flow and Storm flow parameters for TSS, TP and TN for roofs, roads and ground levels were sourced from
Water by Design MUSIC Modelling Guidelines. Refer below for a summary of the parameters where used for
the model.
Table 8 – Commercial Source Node MUSIC Input Parameters

                               TSS log10 values           TP log10 values              TN log10 values
                Surface
 Flow Type
                 Type
                               Mean         St. dev.    Mean         St. dev.      Mean         St. dev.

                  Roof         N/A            N/A        N/A           N/A             N/A        N/A
  Baseflow
 parameters
                 Roads         0.780         0.390      -0.600         0.500       0.320         0.300

                Ground         0.780         0.390      -0.600         0.500       0.320         0.300

                  Roof         1.300         0.380      -0.890         0.340       0.370         0.340
 Stormflow
 parameters
                 Roads         2.430         0.380      -0.300         0.340       0.370         0.340

                Ground         2.160         0.380      -0.390         0.340       0.370         0.340




 BR210522_SBSMP_Rev4.docx                                                                                  Page 14 of 25
Log in to download the original file

Attachment E - Updated SWMP and MUSIC Modelling.pdf · 15.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.