Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Attachment E - Updated SWMP and MUSIC Modelling

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

Bio-Retention System
The following table summarises the individual parameters used in the MUSIC model for the proposed
conventional bio-retention system.
Table 11 - Bio-Retention Details

                              Properties                              Basin 1

                              Extended Detention Depth (m)              0.30

                              Minimum Surface Area (m²)                  68

                              Minimum Filter Area (m²)                   68

                              Saturated Hydraulic                       200
                              Conductivity (mm/hr)

                              Minimum Filter Depth (m)                   0.4

                              Maximum TN Content (mg/kg)                400

                              Maximum Orthophosphate                     30
                              Content (mg/kg)

The proposed surface area has been calculated on equal surface area method to ensure most accurate filter
area. The final surface area will be larger than the area outlined above however was reduced during the
modelling to ensure the stormwater quality requirements are met.

6.2.1.7 Treatment Train Effectiveness
The table summarises the effectiveness of the proposed treatment trains modelled in MUSIC.
Table 12 - Treatment Train Effectiveness Result

                                                                          Achieved
                                              Inflows    Outflows                          Targeted
                Source Pollutants                                      Treatment Train
                                               (kg/yr)    (kg/yr)                          Reduction
                                                                          Reduction

         Total Suspended Solids (kg/yr)         1350        269                80.1%             80%

         Total Phosphorus (kg/yr)                2.6       0.679               73.8%             60%

         Total Nitrogen (kg/yr)                 13.7        6.11               55.4%             45%

         Gross Pollutants (kg/yr)               120         4.75               96%               90%



Results show that the proposed treatment train achieves the required water quality objectives.




 BR210522_SBSMP_Rev4.docx                                                                              Page 16 of 25
Log in to download the original file

Attachment E - Updated SWMP and MUSIC Modelling.pdf · 15.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.