Original source · versioned page text
Attachment E - Updated SWMP and MUSIC Modelling
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 22, section 1. The text section number identifies this passage in the reader.
8 Conclusion A concept stormwater management plan has been prepared to manage stormwater quantity and quality for the proposed development. An on-site stormwater detention basin is proposed for the development that allows for both current and future climate change conditions. A stormwater quality treatment train consisting of one conventional bioretention system and a rainwater tank is proposed for the development. It is proposed that the bioretention system will be installed within the detention basin. Runoff from the external catchment will be piped (up to and including 1% AEP design flows) through the Development Area and will bypass both the proposed detention basin and treatment train. BR210522_SBSMP_Rev4.docx Page 20 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.