Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Attachment E - Updated SWMP and MUSIC Modelling

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 41, section 1. The text section number identifies this passage in the reader.

NOOSA PLANNING SCHEME – WATER QUALITY AND DRAINAGE CODE


             PERFORMANCE OUTCOMES                             ACCEPTABLE OUTCOMES                                   COMMENTS

                                                   Integration of Flood
                                                   and Stormwater Management into Open
                                                   Space published by Healthy Waterways Water
                                                   by Design (version current at the time of
                                                   development application)

 PO12                                              AO12.1                                           A stormwater management plan with a
 Development protects in-stream ecology by         Where run-off from or within the site passes     proposed detention system and a treatment
 maintaining pre-development low flow discharge    through or drains to natural                     train has been prepared for the
                                                   channels, waterways or wetlands,                 development.
 regimes and maintaining fish passages.
                                                   development protects in-steam ecology by
                                                   maintaining pre-development low flow
                                                   discharge regimes in accordance with the
                                                   frequent flow management objectives in PSP6
                                                   Engineering Design Standards - Roads,
                                                   drainage and earthworks

                                                   AO12.2
                                                   Instream structures such as roads, bridges,
                                                   culverts, and other stormwater infrastructure
                                                   do not cause barriers to fish passage and
                                                   facilitate the movement of terrestrial and
                                                   aquatic fauna along waterway corridors.

                                                   AO12.3
                                                   Benthic substrate retains a continuous grade
                                                   with the direction of flow consistent with the
                                                   natural bed profile.
 PO13                                              AO13.1                                           A stormwater management plan with a
                                                   The location and form of stormwater discharge    proposed detention system and a treatment
 Development is designed and constructed to
                                                   points do not alter the pre-development          train has been prepared for the
 maintain surface and ground water balances that
                                                   hydrology of receiving surface water or          development.
 sustain the environmental values of water
 dependent ecosystems, including downstream        groundwater.
 aquatic, riparian, wetland and terrestrial
 ecosystems.                                       AO13.2



BUNNINGS NOOSAVILLE                                                                                                                             Page 8
Log in to download the original file

Attachment E - Updated SWMP and MUSIC Modelling.pdf · 15.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.