Council archive · source document
Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
66.3.2 establishment of the missing floristic and structural elements,
66.3.3 creating opportunities for regeneration from the seed bed, natural recruitment
and the establishment of wildlings,
66.3.4 habitat creation and reinforcement for native fauna and reinforcement of habitat
linkages and corridors,
66.3.5 planting and mulching procedures,
66.3.6 fertilizing procedures,
66.3.7 watering procedures,
66.3.8 protection from wildfire, particularly during the establishment phase,
66.3.9 erosion and sediment control,
66.3.10 on-going maintenance,
66.3.11 environmental safeguards, and
66.3.12 incorporation of the relevant requirements of all the management plans required
by this approval, particularly the Environmental Management Plan.
67 The contract for the Ecological Restoration work shall specify a 4-year maintenance period from
the date restoration works are completed by the contractor, by which time the ecologically
restored areas should be self-sustaining. It shall also be weed-free to the satisfaction of the
Manager, Environmental Services.
68 All the relevant ecological restoration works and actions shall be undertaken by the Developer
and completed prior to dedication of Conservation Parkland to Council.
Landscape Master Plan
69 Prior to approval for a Development Permit for Operational Works, a Landscape Master Plan
shall be prepared, to the reasonable satisfaction of Council, for all the residential and recreation
areas. It shall generally be in accordance with the EDAW Gillespies ‘Landscape Assessment
Report’ (dated 23 August 2003). However, it shall incorporate all amendments to the Plan of
Development and address all relevant Conditions of Approval.
70 The Landscape Master Plan shall:
70.1 specifically exclude areas designated as ‘Conservation Parkland’. (These areas are dealt
with in the Ecological Restoration Plan), and
70.2 incorporate all relevant requirements of, and be consistent with, all other Management
Plans required by this Approval.
71 The Landscape Master Plan shall detail the planting schemes and shall detail, inter alia:
71.1 areas of natural vegetation to be retained;
71.2 site preparation;
71.3 habitat enhancement for native fauna;
71.4 weed removal and control;
71.5 species ‘palettes’ and schedules;
71.6 planting out procedures and horticultural requirements;
71.7 mulching procedures;
71.8 fertilising procedures;
71.9 irrigation and watering procedures;
Page 11 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.