Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
Sewer
179. All sewerage pump stations, reticulation mains and sewer rising mains shall be designated as
Council assets except for the sections of sewer contained within private allotments which will
be private sewers maintained by the body corporate.
Additional Condition 28/10/05
180. Security in the form of a cash bond or trading bank guarantee to the sum of $250,000 must be
submitted, to secure performance of all conditions of this approval, prior to any works
commencing on site. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect of
enforcing performance of this permit.
Additional Conditions 16/09/08
181. The community club house as shown on the Plan of Development Drawing No 6994-53M
Revision M prepared by Conics and dated 12 September 2008 shall be operated as ancillary
recreational facilities to the Group Housing Development and shall be for the use of residents
and their guests only. The facility is not permitted for use by the general public.
182. The area surrounding the community club house shall be landscaped in accordance with
Council’s Policy on Landscaping Guidelines. A properly prepared landscape plan shall be
submitted to Council prior to the issue of Building Works and be to the satisfaction of the CEO.
Such landscaping is to be completed prior to the premises being occupied and maintained at
all times thereafter.
183. No functions or amplified music shall be carried out from the community club house, unless
otherwise approved by the body corporate.
184. Lighting associated with the community club house shall be hooded to ensure that excessive
light spillage does not occur beyond the private open space precinct.
185. Swimming pools shall be fully fenced in accordance with AS1926.1.
186. Prior to the issue of Building Works, the following shall be updated to the reasonable
satisfaction of the CEO:-
i. Construction Environmental Management Plan;
ii. Sediment and Erosion Control Plan; and
iii. Stormwater and Water Quality Management Plan.
All works shall be carried out in accordance with the above plans
187. The Operational Stage Environmental Management Plan shall be updated to the reasonable
satisfaction of the CEO prior to the commencement of the use. All works shall be carried out
in accordance with this plan.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Contaminated land Concurrence Environmental GPO Box 2771
Agency Protection Agency BRISBANE QLD 4001
A copy of any referral agency conditions is attached.
Page 26 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.