Council archive · source document
Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
28. Sufficient parking shall be provided within the residential areas to accommodate the vehicles of
people using the public pathway or walking track through the Public Esplanade.
Fish Habitat Area
29. Public viewing platforms and walking tracks shall not be constructed on or near Weyba Creek or
within the Fish Habitat Area.
30. The applicant shall provide signs to Council specifications and any other management devices
(eg fences) necessary for the protection of the environmental values of the adjacent Esplanade,
particularly the Fish Habitat Area.
Stone Pitched Weir on Lake B
31. No construction shall occur within 10m of Community 3 or Community 4 as identified in the Flora
and Fauna Assessment in the Conservation Parkland.
32. The proposed stone weir for Lake B shall be located wholly within the Private Recreation
Parkland area that encompasses Lake B. It shall not encroach into the Public Recreation
Parkland or Conservation Parkland.
33. The proposed stone pitched weir for Lake B shall be located, designed, constructed and
operated so that the adjacent plant communities that are classified as ‘Endangered’ are not
directly or indirectly affected.
Vegetation Removal, Disposal and Protection in the residential area and Private Recreation
Parkland
34. Vegetation removal, tree felling and lopping shall be undertaken in an environmentally sensitive
manner to avoid damaging surrounding vegetation, trees and habitat.
35. Prior to felling or lopping all trees are to be checked for wildlife (eg. koalas, cockatoos,
possums). If wildlife species are present, the tree shall not be felled or lopped until the wildlife
has left the tree.
36. All cleared vegetation shall be suitably processed or removed from the site by a method
approved by Council.
37. Environmental weed species cleared from the site shall not be mulched. Vegetation material
from environmental weed species shall be removed from the site and disposed of in a Council
approved refuse tip.
38. Burning off is not considered an acceptable means of disposal and is not to take place.
39. During construction, the boundaries of areas of retained and protected vegetation within the
development area shall be clearly marked for the purpose of preventing access into these areas
thereby protecting the vegetation and habitat values.
40. All underground services, drainage, footpaths, bike paths, roads and other site works shall be
located to minimize adverse impacts on retained vegetation, particularly their root systems.
41. Vegetation and individual trees retained in the residential areas and recreation parkland shall be
healthy and vigorous with an expected life span of at least 50 years. A risk assessment by a
qualified arborist shall be undertaken on all individual trees and stands of vegetation to be
retained within the residential areas and recreation parkland. An arborist’s written report shall be
included in the relevant Operational Works applications.
Weed and Pest Species Control
42. Weed control shall be undertaken in general accordance with the Construction Management
Plan, dated August 2003, prepared by Tate Professional Engineers.
Page 8 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.