Skip to the record
Accept no substitutions.

Original source · versioned page text

Sustainable design code

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Performance outcomes                                Acceptable outcomes


                                                    AO3.2                                             Performance outcome:
                                                    Development incorporates porous pavements on      The development does not propose to incorporate
                                                    low trafficked areas such as footpaths and car    porous pavements on low trafficked areas. The
                                                    parks.                                            development seeks to divert stormwater to
                                                                                                      landscaped areas where possible. Impervious
                                                    Note: Porous pavements are not considered         areas have been minimised where possible.
                                                    landscaping and do not form part of the minimum   Stormwater from impervious areas will be treated
                                                    landscape requirements.                           prior to being released into the environment. This is
                                                                                                      detailed in the Stormwater Management Plan (refer
                                                                                                      to Appendix F).


PO4
Development limits changes and disturbances to      No acceptable outcome provided                    Complies:
the site topography to preserve existing drainage                                                     There are no existing drainage channels on the site.
channels as much as possible.                                                                         Notwithstanding, the proposal requires some fill to
                                                                                                      accommodate the use. Details of the required
                                                                                                      earthworks is outlined in the Engineering Services
                                                                                                      Assessment. (Refer to Appendix E)
Log in to download the original file

Sustainable design code.pdf · 75 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.