Original source · versioned page text
MCU14/0028 IDAS Forms 1 & 5
5. Are there any current approvals (e.g. a preliminary approval) associated with this application? (Non- mandatory requirement) BA No C Yes—provide details below List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy) 6. ls owner’s consent required for this application? (Refer to notes at the end of this form for more information.) [[] No (4 Yes—complete either Table F, Table G or Table H as applicable Table F Name of owner/s of the land ANNA HENBRURY MicHhe. HENSURY We, the above-mentioned owner/s of the land, consent to the making of this application. Lia Signature of owner/s of the land OU en UU hr G \l —N Date Mn _ MAY 20)4 Table G Name of owner/s of the land | The owner’s written consent is attached or will be provided separately to the assessment manager. Table H Name of owner/s of the land OC By making this application, |, the applicant, declare that the owner has given written consent to the making of the application. 7. Identify if any of the following.apply to the premises (Tick applicable box/es.) Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete Table | On strategic port land under the Transport Infrastructure Act 1994—complete Table J LC] In a tidal water area—complete Table K C On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.) C On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion) Name of water body, watercourse or aquifer 6MILE CREE, LEFT BRANCH Table J Lot on plan description for strategic port land Port authority for the lot IDAS form 1 Vg
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.