152007.1626.2 Change to Existing Approval & Extension of Relevant Period - 50 Gateway Drive Noosaville
q go
Sunshine Coast Request to Change Existing Approval a nd/or
Extension to Relevant Perio SCRC CORRESPONDENCE
NOTES: Which entity issued the approval?
iuuiui iuir^i
B0345145
ALL questions MUST be completed unless the form indicates Sunshine Coast Regional Council
otherwise. Other entity - please specify: IJCCSA 5+11I2t COLiNJC I L.-
This form must be submitted to Council accompanied by the
Is the approval for a mobile and temporary ERA?
applicable fee.
Attach extra pages if there is insufficient space on the form. No
If Council was the Assessment Manager for the existing approval, Yes - complete below
and the approval was issued by the Court, then:-
Insert the name of each local government area in which the
(a) a request to change the development approval and/or mobile and temporary ERA is proposed to
conditions is mode to the Court; and
operate/operating.
(b) a request to extend the relevant period for the approval is
made to Council.
All terms used on the form have the meaning given in the
Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009. 3. Nature of request
Please tick ALL applicable categories
1• Details of the person making the request
To change the development approval
Full name - individual or company V' To change the development conditions
GCP'Te"A`I e-\-be PTY LTD To extend the relevant period before lapsing
Contact name -for company Please attach documentation outlining the details of
and the reasons and justification for the requested
D -4oer-W Ml1QQA`J change or extension.
Postal address
4. Location of the premises
c/- ?1?_03'ECr S-% Q L4,) PT`/ C_-TO
Street address
&i i10 0 P10 Ati'ENC1t
PLE)ANDOUN - OLAo1Ca Postcode 4S72 Unit no. Street no. Street name
Contact phone number Fax number - if applicable CxATEWAy O-IV
Suburb Postcode
Mobile number - if applicable
Lot and plan description
Lot no. Plan type & plan no.
E-mail address - if applicable
aec s ^t a (_
2. Details of the existing approval
Type of approval - please tick ALL applicable categories . ,
Development Permit
Preliminary Approval
Compliance Permit 6 APR 70 Was there one or more concu
Material Change of Use the original approval?
J Reconfiguring a Lot
Operational Works
Ma r oochyd No
Yes - provide details below
Building Works Note - Under s372 of the Sustainable P W n i t -rierson
e
Plumbing or Drainage Works making the request is required to give a cop -of i refit est to all
concurrence agencies.
Compliance Certificate
Environmentally Relevant Activity (ERA) Concurrence Agency Date copy given
Application number Date issued I;N i^Gt-E ^ ,/ o4 /zo(I
/ /
2oc7 *2G L3 112- P2007
/ /
qqv
PD-DA-FM401/1-30/04/2010 Page 1 c 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
6. Pre-request response notice 8. Does the request involve a State resource
prescribed under the Sustainable Planning
Has a pre-request response notice been given by a relevant
Regulation 2009, Schedule 14?
entity (e.g. a concurrence agency) for this request?
No No
Yes Yes - complete Table C below
If yes, please attach a copy of the notice.
Table C - State owned resource
Nature of State owned resource
7. Owner's consent
Is the owner's consent required for this request?
74 No Nature of evidence required
Yes - complete either Table A or Table B below Evidence of allocation of /entitlement to, the resource
Note - If more than one owner of the land all owners' details are Evidence the chief executive has agreed to the request
required.
Attach a copy of the evidence required above.
Table A - owner's consent provided on form
Owner's name/s NOTES: For question 8
Section 370(3) and (4) of the Sustainable Planning Act 2009 requires
I/We, the above-mentioned owner/s of the land, consent to that if an application for the development approval were made at
the making of this request. the time of making this request and evidence under section 264(1) of
Signature/s the Sustainable Planning Act 2009 would be required to support the
application, this request must be accompanied by the written
agreement of the chief executive from whom evidence would be
Date
required under section 264(1).
Section 264 of the Sustainable Planning Act 2009 provides that if a
development involves a State resource, a regulation may require the
Table B - owner's consent attached application to be supported by certain evidence prescribed under
owner's name/s regulation. Schedule 14 of the Sustainable Planning Regulation 2009
prescribes the State resources for which evidence is required to be
given, and the evidence required, to support the application.
The owner's written consent is attached.
NOTES: For question 7
9. Applicant's declaration I
Under section 371 of the Sustainable Planning Act 2009, if the Signature/s:
person making the request is not the owner of the land to which the
approval relates, the request must be accompanied by the owner's
consent.
However, owner's consent is not required if the approval:
By making this request. I declare that all information in this
• relates to land the was acquisition land to which section
263(2)(d) of the Sustainable Planning Act 2009 applied when request is true and correct.
the application for the approval was made; or
• is for building work or operational work for the supply of
community infrastructure on land designated for the
community infrastructure; or
• the consent of the owner would not be required under section
263(1) of the Sustainable Planning Act 2009 if a development
application were made for the requested change.
Also, owner's consent is not required if the Assessment Manager is
satisfied that:
• the number of owners of the land make it impractical to obtain
owners' consent, and the requested change does not materially
affect the owners' land; or
• having regard to the nature of the proposed change, the owner
has unreasonably withheld consent and the requested change
does not materially affect the owner's land.
Page 2of2
Page 3
62 Buderim Avenue
ALEXANDRA HEADLAND QLD 4572
PROJECT STRATEGY QLD Ptv Ltd Phone: (07) 5444 0727
Fax: (07) 5444 0627
Mobile: 0418 989 897
Email [email protected]
6th A pr il 2011 ABN 37 119 035 906
Town Planning
ENERGEX
GPO Box 1461
Brisbane QLD 001
Attention: Craig Thompson
Dear Craig
RE: GATEWAY RISE PTY LTD
EXTENSION AND CHANGE TO EXISTING APPROVALS
RECONFIGURATION: 2007/1626
Your Ref: HBD459788 135935
We have lodged an application to extend the Development Permit currency period on the
Proposed Industrial Subdivision at Gateway Drive, Noosaville with the Sunshine Coast
Regional Council and forward a copy of the relevant form as required under s372 of the
Sustainable Planning Act.
Should you have any questions regarding this matter please do not hesitate to contact me.
Yours faithfully
Andrew Murray - Director
for PROJECT STRATEGY PTY LTD
EncL Request to Change Existing Approval and/or extension to relevant period
Allotment Layout Plan - Figure lb (stage boundary added)
Energex Page 1 of 1
Page 4
Page 1 of 2
Andrew Murray
From: peter and elizabeth upton [[email protected]]
Sent: Friday, 1 April 2011 12:20 PM
To: Andrew MURRAY
Subject: FW: 2007/1626 Lot reconfiguration - Response to IC Review Request.
From: [email protected]
To: [email protected]
CC: [email protected]; [email protected];
[email protected]
Date: Fri, 1 Apr 2011 11:05:32 +1000
Subject: 2007/1626 Lot reconfiguration - Response to IC Review Request.
Peter Upton,
Gateway rise Pty Ltd.
RE: 200711626 Lot Reconfiguration Approval
Dear Peter,
I refer to your letter to Cr Lew Brennan received 14 March 2011 and our telephone conversation this morning
1 April 2011 and confirm the following:
I have discussed and reviewed your request with my Manager Infrastructure Policy and Coordinator Planning
Applications (North) whereby I have reviewed the basis on how the infrastructure contributions/charge
calculations were undertaken and applied to this approval.
As a result of subsequent amendments made to the Priority Infrastructure Plan currently before the State
Government due to SPA legislation & PIP guideline amendments, I advise that we are agreeable to amending
Infrastructure Contributions (Decision Notice Condition 48) and CMRNICP Infrastructure Charge (IC 705)
applying to this development approval on the following basis:
• No change to the Water Supply & Sewerage calculation method contained in the permit i.e. based on the
lot area 29,103 m2 for the 17 additional industrial lots;
• With regard to the CMRNICP charge, Open Space & Pathways contributions issued that were based on
55% site cover of the 17 additional industrial lots = 16,007 m2 use area per previous PIP & Guideline
documents, we would agreed to change these contributions to be based on an equivalent detached
house lot in accordance with the most recent amended PIP & guideline. This means that for these
networks, the contributions & charges will be based on an equivalent 17 x detached house lots.
The infrastructure contribution conditions and charge notice would result in the following amended amounts
current at CPI December 2010 to be as follows:
• PSP 12 - Public Open Space Contributions = $56,810.
• PSP 16 - Sewerage Headworks Contributions = $30,434.
• PSP 17 - Water Supply Headworks Contributions = $ 0.
• PSP 20 - Pathway Trunk Network Contributions = $ 0. (Note that Remaining Credit ($16,826.) for
construction 190 linear m of trunk pathway route #24 will apply to future MCUs distibuted to the individual
lots)
• CMRNICP - Infrastructure Charge Notice IC 705 = $52,781.
Resulting in the Total Amended Contributions & Charge applying to this approval = $140,025. current at
CPI December 2010
Please note that this method just transfers the majority of the contributions & charge applying to industrial
development from the lot reconfiguration approval to future MCU applications when lodged & approved for
4/04/2011
Page 5
PROPERTY DESCRIPTION
Lot 14 on SP170295
17 PROPOSED INDUSTRIAL ALLOTMENTS
Total Area of Lots = 29103 sqm
Area of New Road Reserve = 10955 sqm
Area of Site = 42560 sqm
NOTE THIS DEVELOPMENT LAYOUT IS
CONCEPTUAL ONLY. PENDING FULL PLANNING,
ENGINEERING, ENVIRONMENTAL & GEOTECHNICAL
EVALUATION HA SED ON DETAILED FIELD SURVEY.
BUSNUNDS DRIVE
KEY
PROPOSED ALLOTMENTS
PROPOSED ROAD RESERVE
PROPOSED DETENTION BASIN
[ v ISTMG PARK
•.m..yes STAGE BOUNDARY
Yb&i S41A go WB7
rd.ya.. (57; 54M 2221 PROPOSED INDUSTRIAL DEVELOPMENT
PROJECT STRATEGY QLD Pty Ltd E-W 12 Bodsgm:loawrnrw VENTURE DRIVE, NOOSA
A"- st BudnnAurms.AWanab H^tlnq
=LD 4572
FC( Gr.TEVVAY FUSE Pty Ltd FIGURE 1 b
Page 6
62 Buderim Avenue
ALEXANDRA HEADLAND QLD 4572
PROJECT STRATEGY QLD Pty Ltd Phone: (07) 5444 0727
Fax: (07) 5444 0627
Mobile: 0418 989 897
Email: projectstrategv a bignond.c om
6th April 2011 ABN 37 119 035 906
The Chief Executive Officer
Sunshine Coast Regional Council
Locked Bag 72
SUNSHINE COAST MAIL CENTRE QLD 4560
Attention: Trish Sweeney
Dear Trish
RE: GATEWAY RISE PTY LTD
EXTENSION AND CHANGE TO EXISTING APPROVALS
RECONFIGURATION: 2007/1626
OPERATIONAL WORKS: 2008/658
Further to our telephone discussion and the email advice (attached) from Ludvigsen
Oddbjorn , Coordinator Infrastructure Planning for SCRC, on behalf of Gateway Rise Pty
Ltd, I request the following amendments to conditions 4 and 48 of Development Permit No.
2007/1626.
Condition 4 The currency period extended a further four years.
Condition 48 The contribution toward Council Infrastructure be amended
as follows:
PSP12 Public Open Space Contribution $ 56,810
PSP16 Sewerage Headworks Contribution $ 30,434
PSP17 Water Supply Headworks Contribution $ 0
PSP20 Pathway Trunk Network Contribution $ 0
Coastal Major Road Network Infrastructure Charge Notice $ 52,781
These charges are subject to CPI variations from December 2010.
Sunshine Coast Regional Council Page 1 of 2
Page 7
Due to the current economic conditions which have markedly affected sales on projects of
this nature, we request your approval to enable the project to be developed in two stages as
shown on the attached plan - Figure 1B. Stage 1 consisting of Lots 1, 9 to 17 and Stage 2, Lots
2to8.
We also request that the currency period of the associated Operational Works approval No.
2008/658 be extended to reflect that of the Reconfiguration extension.
Payment receipt of $2387.00 is enclosed.
Thank you for your assistance in this matter.
Yours faithfully
Andrew Mur y - Director
for PROJECT STRATEGY PTY LTD
Encl. Request to Change Existing Approval and/or extension to relevant period (2 Forms)
Email from Ludvigsen Oddbjorn - Co-ordination Infrastructure Planning - SCRC
Allotment Layout Plan - Figure I b (stage boundary added)
Sunshine Coast Regional Council Page 2 of 2
Used in these records
152007.1626.2 Change to Existing Approval & Extension of Relevant Period - 50 Gateway Drive NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.