Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

152007.1626.2 Change to Existing Approval & Extension of Relevant Period - 50 Gateway Drive Noosaville

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                                                                                   Page 1 of 2



 Andrew Murray

  From:       peter and elizabeth upton [[email protected]]
 Sent:        Friday, 1 April 2011 12:20 PM
 To:          Andrew MURRAY
  Subject: FW: 2007/1626 Lot reconfiguration - Response to IC Review Request.




From: [email protected]
To: [email protected]
CC: [email protected]; [email protected];
[email protected]
Date: Fri, 1 Apr 2011 11:05:32 +1000
Subject: 2007/1626 Lot reconfiguration - Response to IC Review Request.

Peter Upton,
Gateway rise Pty Ltd.

RE: 200711626 Lot Reconfiguration Approval

Dear Peter,

I refer to your letter to Cr Lew Brennan received 14 March 2011 and our telephone conversation this morning
1 April 2011 and confirm the following:

I have discussed and reviewed your request with my Manager Infrastructure Policy and Coordinator Planning
Applications (North) whereby I have reviewed the basis on how the infrastructure contributions/charge
calculations were undertaken and applied to this approval.
As a result of subsequent amendments made to the Priority Infrastructure Plan currently before the State
Government due to SPA legislation & PIP guideline amendments, I advise that we are agreeable to amending
Infrastructure Contributions (Decision Notice Condition 48) and CMRNICP Infrastructure Charge (IC 705)
applying to this development approval on the following basis:

 • No change to the Water Supply & Sewerage calculation method contained in the permit i.e. based on the
   lot area 29,103 m2 for the 17 additional industrial lots;
 • With regard to the CMRNICP charge, Open Space & Pathways contributions issued that were based on
   55% site cover of the 17 additional industrial lots = 16,007 m2 use area per previous PIP & Guideline
   documents, we would agreed to change these contributions to be based on an equivalent detached
   house lot in accordance with the most recent amended PIP & guideline. This means that for these
   networks, the contributions & charges will be based on an equivalent 17 x detached house lots.

The infrastructure contribution conditions and charge notice would result in the following amended amounts
current at CPI December 2010 to be as follows:


 •  PSP 12 - Public Open Space Contributions =        $56,810.
 •  PSP 16 - Sewerage Headworks Contributions =         $30,434.
 •  PSP 17 - Water Supply Headworks Contributions = $           0.
 •  PSP 20 - Pathway Trunk Network Contributions = $           0. (Note that Remaining Credit ($16,826.) for
    construction 190 linear m of trunk pathway route #24 will apply to future MCUs distibuted to the individual
    lots)
  • CMRNICP - Infrastructure Charge Notice IC 705 = $52,781.

Resulting in the Total Amended Contributions & Charge applying to this approval = $140,025. current at
CPI December 2010
Please note that this method just transfers the majority of the contributions & charge applying to industrial
development from the lot reconfiguration approval to future MCU applications when lodged & approved for




 4/04/2011

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

152007.1626.2 Change to Existing Approval & Extension of Relevant Period - 50 Gateway Drive Noosaville.pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.