Skip to the record
Accept no substitutions.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

e   Any litter is to be placed in the litter bins provided on site.
               e   Notrucks are to access the site prior to 7am on any day of the week.                                        :
               e   Delivery hours for trucks are limited to the time period 7am to 6pm Monday to Saturday.
               e   The use of engine/exhaust brakes along Topaz Street and Cooroy Mountain Road is to be                       :
                   prohibited except in the case of an emergency ie safety requirement.                ~
               @   Maximum speed of Travel on Topaz Street and Cooroy Mountain Road is to be 60 km/h.                          :
               e   Maximum speed of travel on site is 30 km/hr.                                 .

               Drivers who are found to not comply with the above Code of‘Conduct shall be issued a warning, any               .
               subsequent infringements may result in disciplinary action:béing taken.
                                                                 SEP     Es                                                    !
                   PEPE HEE ETE TEETH EEE TEESE EE TEETH TEES EEE tT EEE                                                       ,
                                             Cooroy Mountain, Spring Water        * oo
            Confirmation of Understanding of the Code          "T    a =                  ,
             (print)                             nie      a       -   en
            Of (company)                           aren    fe  si        a
            Have read/had the Drivers Code explained to mend ufderstand-the requirements of the Code. |
            confirm that | will comply.with the requirements of:the Drivers Code:

           Signed:                  ie      EER,            ot
            Date:      ee                PR         ‘os,

            Endorsed by:           Pa   aie
                           (CMSW Representative}.

nf”, Rs ate .   .
MeO        ~ .                                           1 7b
  fow         3
~ {   .          .
BL    oY:
BY     Se    .  : .
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.