Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

|.                  oo                                                         me                               |
 ,

                                                                                             GILBERT+SUTHERLANG,

 |                     Summary
                       This report describes the proposed wastewater loadings, treatment method and disposal
 {    .                strategy for the redeveloped Cooroy Mountain Spring Water bottling facility, Lot 2 $P143409,
                       314 Cooroy Mountain Road, Mt Cooroy, Queensland.
 |                     An Effluent Disposal Report has been previously prepared for the site as part of the MCU
 i -                   Development Application. This current conceptual assessment constitutes a revision of the site
                       effluent treatment and disposal strategy in accordance with AS/NZS 1547:2000 ‘On-site
                       domestic wastewater management’ and the experts agreement dated 2 September 2009, and
I.                     refers to the findings of the previous report where relevant.
 {                     In performing this assessment site physical characteristics and site soil suitability have been
               .       reviewed.
                       An approved secondary wastewater treatment system will be used to manage wastewater
        ,              generated by the development. An irrigation area of 1,180m? will be required to assimilate the
 i                     proposed volume of treated wastewater. We consider there is sufficient land area on the site to
                       accommodate the irrigation area and an increase in area if required.
                       This report concludes that sustainable irrigation of treated wastewater within the site, in
 {                     accordance with the advice contained herein and applicable guidelines, is achievable.
 [                     As this is a conceptual design, a further detailed effluent treatment and disposal! strategy
   ’                   including MEOLI modelling will need to be prepared to support future operational works
 [                     applications for this site.

 {                S
                  C2
                  “rr
 [                c.
                  nm
                  i)
                  >
                  a
 {   .            =
 [                “
 | ~                                                                                                             iii
 |
 l                                                                                       ;
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.