1 ) Introd uction staffing and waste generation
; e taking account of current plant
: Cooroy Mountain Springwater Pty Ltd figures. A conceptual ET&DS
{ commissioned Gilbert & Sutherland Pty Ltd should be completed by G&S to
(G&S) to prepare a Conceptual Effluent support the current application, to
{ Treatment and Disposal Strategy for Lot 2 outline EP's to be treated,
$P143409, 314 Cooroy Mountain Road, treatment process, and disposal - ,
¢ Cooroy Queensland (‘the site’). The site areas and locations. This work
occupies a total area of 48.17 hectares and should include suitable sampling
is shown on Drawing HJ0085.1.1. ‘and testing of the current waste
{ stream discharge, appropriate to .
An Effluent Disposal Report was previously the relevant sources.
f prepared for the site by Global Testing Pty
Ltd in 2007'. ¢ A further investigation of actual
i ‘ . EP's being generated by the
. This current assessment constitutes a combination of plant, wash down
revision of the site effluent treatment and and staff wastewater is to be
{ . disposal strategy in accordance with AS/NZS carried out by G&S to support the
. 1547:2000 ‘On-site domestic wastewater current application, and to assess if
[. management’ and the experts agreement additional ERA licensing is required
dated 2 September 2009. for the site.
. The issues raised in the Report of Experts In performing this assessment site physical
[ Meeting September 2, 2009 relevant to this characteristics and soil suitability have been
: conceptual assessment are reproduced reviewed.
[ below.
e An updated effluent treatment and
f . disposal strategy (ET&DS) is
required for the project, to
i demonstrate that adequate
- treatment of wastewater from
t plant and wash down, and from
staff and suitable on site disposal,
L. 1
_&
[ S
cw
eo .
I. ia
te $e
{ + ‘Pinkney, M.S., 2007, Effluent Disposal Report -
= ee Existing residence & proposed extensions to existing .
_ lass Wy 3 factory, 314 Cooroy Mountain Road, Cooroy, Global
| hae Zs Testing , Noosaville, Queensland,
Soe Qos
[i f gt 1-1
‘ . 1
VES 4 / .
| cS, ale fxs
Oe
bow": fi,
| NBsSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.