Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Pome              ee

                                                                                            GILBERT+SUTHERLANG

{                     2) Proposed development                           by the redevelopment will be treated to a
                                                                        It is proposed that wastewater generated
                      The proposed development the subject of           secondary standard before being irrigated
|                     the MCU application consists of:                  onto an appropriate disposal area which
                      *   asingle on-site residential dwelling,         meets all planning requirements.
f                     e   asteel framed shed complex containing                       O                                              ;
                          bottle wash and filling areas, storage        The calculation of the wastewater loadings
   -                      area, holding tanks and loading areas,        used in this assessment is detailed in Section
   .                  *   areas of hardstand surrounding the            5 of this report. The anticipated wastewater
   .                      above shed for car parks, loading bays        loadings from the development will be
[.                        and site access; and                          equivalent to a 17 EP sewage treatment
                      ¢   office wing including reception,              system. Therefore, this proposal will not
{                         administration and staff amenities.           require an ERA63 licence.
                       Drawing HJ0085.1.5 shows the proposed                 ;
                       redevelopment layout.

 |               =
                 co                                                                                   .
 l               S        .
                 7
 I               mn                                                                               .
   -             Mm
    .            ia]
                 +
                 ‘=
           -     oO

 [  fo                                                                              ,                          2-1
 i.
 bos
 ,        .
 t
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.