Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GILBERT+SUTHERLAND                     j

                    7) Conclusions                 ;                   treated wastewater within the site, in                     |
                                     .                                 This report concludes that irrigation of
                     A conservative assessment of site                 accordance with the advice contained
                     conditions was undertaken to determine            herein and applicable guidelines is
‘                    its suitability to accept on-site disposal of     achievable.
                     treated wastewater generated by the
                     proposed bottling facility development.           As this is a conceptual design, a further                  |
                                                                       detailed effluent treatment and disposal
                     An approved secondary wastewater                  strategy including MEDLI modelling will                    |
                     treatment system will be used to manage           need to be prepared to support future                     .
                     wastewater generated by the development.          operational works applications for this site,              |
                     An irrigation area of 1,180m? will be
                     required to assimilate the proposed volume                        :
                     of treated wastewater based on the                                                                           ,
                     conservative loadings of 3,367 L/week.                                                                       i
                     The size of the site will ensure this area is                                                                {
                     available and that an increase in area is also
  ,                  possible if required,                                                                                        |

                                                                                                                                  i
                                                                                                                                  {

                                                                                                                                  i

                                                                                                                                  |

                2                                                                                                                 |
                S
                g                                                                                                                 |
                a
                y
                o                                                              |                                                  |
                P                                                                                                                 i
                a                                                                                                                {
                C
                :                                                                                        .                       |
                                                                                                              7-1
                                                                                                                                 j
                                                                                                                                 t
                                                                                                                                 i
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.