Original source · versioned page text
2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GILBERT+SUTHERLAND j
7) Conclusions ; treated wastewater within the site, in |
. This report concludes that irrigation of
A conservative assessment of site accordance with the advice contained
conditions was undertaken to determine herein and applicable guidelines is
‘ its suitability to accept on-site disposal of achievable.
treated wastewater generated by the
proposed bottling facility development. As this is a conceptual design, a further |
detailed effluent treatment and disposal
An approved secondary wastewater strategy including MEDLI modelling will |
treatment system will be used to manage need to be prepared to support future .
wastewater generated by the development. operational works applications for this site, |
An irrigation area of 1,180m? will be
required to assimilate the proposed volume :
of treated wastewater based on the ,
conservative loadings of 3,367 L/week. i
The size of the site will ensure this area is {
available and that an increase in area is also
, possible if required, |
i
{
i
|
2 |
S
g |
a
y
o | |
P i
a {
C
: . |
7-1
j
t
iSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.