Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

vo                                           AeA
                              —           ee
                                                                                        nn                     <invm eo mmcens en —.

              1     APPLICATION DETAILS
               Application No:           2006/268
                Street address:          314 Cooroy Mountain Road, Cooroy Mountain
  os            Real property            Lot 2 SP 143409
                description:                                                          ;
                Planning Scheme:         The Noosa Plan
              2 RELEVANT PERIOD OF APPROVAL                              |                              |         |
              The relevant period for this Development Approval is identified in the Assessment Manager conditions.
              3 ASSESSMENT MANAGER CONDITIONS                                       |              |
             Land Use                                                                                                      |
               1. | Development undertaken in accordance with this approval must generally comply with the approved
                    plans of development. The approved plans are numbered SKO1 and SKO2 dated 2 August 2010and
                    as may be amended by these conditions.
               2.   The development must be undertaken and operated in a manner that causes no detrimental effect
                    upon the amenity of the neighbourhood by reason of the creation of excessive noise, fighting
                    nuisance or other emissions.
               Vehicle and Truck Movements
               3.   All vehicles associated with the use shall travel to the site via the western end of Cooroy Mountain
                    Road.
               4.   -,
               5.
               5A.  Trucks are not to arrive at or leave the premises outside the hours of 7:00 am to 6:00pm Monday to
                    Friday.
               5B.  Prior to the Council completing the staged upgrade works to Cooroy Mountain Road, weekly Trucks
                    shall be limited as follows:
                     (a) 40 water carrying trucks (namely ail semi-trailers, tankers and other trucks carrying water but
                         excluding B-Doubles) per week;
                     (b) 20 ancillary trucks (namely non-articulated trucks and non-water carrying trucks).
               5C.  After the Council has completed the staged upgrade works to Cooroy Mountain Road, weekly
                    Trucks shall be limited as follows:
                     (a) 50 water carrying trucks (namely all semi-trailers, tankers and other trucks carrying water but
                         excluding B-Doubles) per week;
                     (b) 25 ancillary trucks (namely non-articulated trucks and non-water carrying trucks).
                     Note: The road upgrade referred to is the upgrading of the remaining 2.2 kilometres of Cooroy
                     Mountain Road to provide two (2) 3.5 metre wide traffic lanes with a 1.0 metre wide sealed shoulder
                     to a total formation width of 9.0 metres. It is envisaged that the upgrade works to Cooroy Mountain.
                     road will be completed in the financial year 2012/2013.
               5D.   Truck drivers will comply with the requirements of the “Truck Drivers Code of Conduct” dated 2
                     August 2010 which requires, amongst other things but is not limited to:

       NS Bie                                                                                       rors
  2 :     3.    Vo \                              .
 :      Po)      ~~ f       .
   Bis            ff
    : aaa
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.