Delegated Report - Code - Planning MCU23 0094, OPW23 0113 & RAL23 0014 [As Published] · MCU23/0094

of 36

Text shows just the words. Original shows the document exactly as it was published.

               5.     All necessary approvals from external service providers (eg Unitywater) and external parties
                      on which the development works are proposed have been obtained and a copy supplied to
                      Council.
               6.     Copies of the approved plans, duly signed by the consultant Registered Professional
                      Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
                      Construction at the “pre start” meeting.
               7.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting.
               8.     A condition report of the drainage system must be completed for agreement at the prestart
                      meeting. The condition report is to include a CCTV inspection of the existing pipe and must
                      include at least 50m upstream and downstream of all works.
               9.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               10.    Prior to requesting a prestart meeting:
                      e.      Receipt of amended plans approval.
                      f.      Receipt of Fauna management plan.
                      g.      Tree protection fencing must be installed under the supervision of the qualified person*.
                              (Refer to Advisory Note)
               11.    Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Erosion and sediment control works;
                      c.      Arboreal works.
                      d.      Fauna management works.
                      e.      Other relevant parties
               12.    A Construction Management Plan must be submitted to Council prior to the pre-start meeting
                      and must specifically address the following:
                      a.      Traffic Management during all aspects of the construct phase including:
                              i.        A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
                                        Control Devices (MUTCD) detailing all temporary signage and traffic control
                                        measures prior to construction.
                              ii.       Maintenance of safe pedestrian access across the frontage of the site both during
                                        daily construction and after daily construction has ceased.
                              iii.      Proposed fencing to the site during the construction phase of the development.
                              iv.       Adequate parking arrangements for construction workers. Note that
                                        Construction Vehicle Parking within the Eumundi Noosa Road Reserve is
                                        unlikely to be supported due to traffic safety and damages to Council and
                                        Department of Transport and Main Roads Property. Any off-site parking
                                        proposal must provide owner’s consent and maintain adequate traffic and
                                        pedestrian safety.
                              v.        No queuing of trucks is permitted on residential streets, especially prior to
                                        7.00am. Further parked trucks must have engines turned off.
                      b.      Maintenance and protection of water quality and existing drainage lines through the
                              construction site through the implementation of appropriate erosion and sediment
                              control measures.

                                                                                                          Page 27 of 36

Document Set ID: 22528171
Version: 11, Version Date: 11/01/2024

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU23 0094, OPW23 0113 & RAL23 0014 [As Published].pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.