GENERAL NOTES & INFORMATION                                                                                                                                                                          DRAWING LIST                                                                                  PROJECT NOTES
                                                                                                                                                                      SHEET #                                SHEET NAME                             REV. DATE
                                                        Site Plan Notes                                     Roof Construction
The builder is responsible to check all
                                                        Surface water drainage must be prevented            Colorbond sheet metal to be fixed in accordance
existing services prior to beginning any
                                                        from entering the building with FGL sloping         with manufactures specification.                             00         Title Page                                              18/12
construction.
                                                        away from the building & finished slab levels.      All ridge capping, steps, hips valleys and vent              01         General Notes                                           18/12
                                                        The builder is responsible to check all             flashings to provide waterproofing system.
# Denotes cavity slider to manufactuers                                                                                                                                  02         Site Plan                                               18/12
specification, frames containing cavity sliders         existing services prior to beginning
                                                        construction.                                       Provide reflective foil backed sarking to underside          03         Ground Floor Plan                                       18/12
to be 90mm minimum U.N.O
                                                                                                            of roof sheeting. Colorbond guttering and PVC                04         Ground Floor - Dimensions                               18/12
                                                        Stabilised cut and fill batters to be a             Downpipes to be connected to Stormwater
Builder to verify all dimensions prior to                                                                                                                                04a        Ground Floor GFA                                        18/12
                                                        minimum of 1000mm away from footings                systems in accordance with the local authority.
beginning construction work.                                                                                                                                             05         First Floor Plan                                        18/12
                                                        and are to have 1 in 1 max. gradient.
                                                        Grade finished surface level                        Roof water requirements and calculations are                 06         First Floor - Dimensions                                18/12
Electric HWS to minimum energy efficiency
                                                        from slab and footings.                             provided as a guide. Ensure a qualified plumber/
regulations.                                                                                                                                                             06a        First Floor GFA                                         18/12
                                                                                                            hydraulics consultant reviews the downpipe
                                                        Position of proposed building to                    layouts prior to construction.                               07         Elevations                                              18/12
Toilets: minimum 4-star dual flush, as rated
                                                        be verified by builder on site.                                                                                  08         Elevations                                              18/12
under the Water Efficiency and Labeling
                                                        Location of existing services to be                 qldBUILT has provided downpipe locations as a
Standards scheme (WELS).                                                                                                                                                 09         Sections                                                18/12
                                                        verified by builder prior to construction.          guide only. Layout to be checked for compliance
                                                                                                            by qualified persons prior to ordering and                   10         Sections                                                18/12
Tapware: minimum 3-star WELS rated for
                                                        Wall Construction                                   construction.                                                26         Landscaping & Site Cover                                18/12
kitchen sinks, basins and laundry troughs.
                                                        Wall framing to be constructed in                   All slotted gutters and downpipes to be installed            R01        Exterior Renders                                        18/12
                                                        accordance with engineering specification           to NCC and or AS3500 (relevant parts). Materials
Showerheads: minimum 3-star WELS rated                                                                                                                                  R02         Exterior Renders                                        18/12
                                                        and must not differ from certification              used are to be compatible with all components
showerheads.
                                                        covered by the Form 15. Cladding                    upstream and down stream.                                   R03         Exterior Renders                                        18/12
SD Smoke alarms complying with AS 3786                  systems to be fixed in accordance with                                                                          R04         Exterior Renders                                        18/12
 to be installed and connected to consumer              manufactures specification.
                                                                                                            Termite Risk Management                                     R05         Exterior Renders                                        18/12
 mains power in accordance with NCC part                                                                    Method to be in accordance with the                          T01        WPH&S & Revision Schedule                               18/12
 3.7.2                                                  Wet Areas
                                                        Floors in "Wet Areas" to be impervious in           NCC Part 3.1.3 and other relevant
                                                        accordance with Australian Standards.               manufacturer specification. All new
All electrical appliances and plumbing symbols                                                              work shall be protected from termite
are diagrammatical. Refer to builders                   Finish and fall gradients to floor wastes.
                                                                                                            attack in accordance with AS 3600.1
specification for details all fixtures.                                                                     "Protection of the Building from
                                                        Glazing Construction
                                                        Powdercoated Aluminum Frame                         Subterranean Termites AS2870 Part
Seal wet areas in accordance with N.C.C. Vol. 2.                                                            1 New Building Slabs.
Part 3.8.1. Slope floor surface towards fw              Windows in accordance with AS 4055
(floor wastes)                                          "wind loads for residential" & AS 1288
Provide lighting in accordance with N.C.C. Vol. 2.      "Glass in Buildings selection and                   Dimensions Note:
Part 3.8.4.2 & 3                                        installation"                                       All wall dimensions are taken from
Provide ventilation in accordance with N.C.C.                                                               the outside faces of the stud wall.
Vol. 2. Part 3.8.5                                      Soffit Construction                                 (i.e. selected cladding over omitted for
Mechanical ventilation in accordance with N.C.C         4.5mm F.C Sheeting and Painted                      clarity excluding brick veneer walls).
Vol. 2. and AS1668.2                                    (Raked)

                                                        Waterproofing & Water Resistant                     Climate Code Requirements
                                                        Materials                                           Energy efficiency assessor to confirm
Minimum Design Standards                                All wet area waterproofing is to                    adequacy of proposed construction.
Construction of this building to be in                  comply with AS3740, waterproofing                   Provide insulation to N.C.C. code requirements
accordance with the following Australian                wet areas in residential buildings.                 or to BERS certification requirements.
governing bodies.
♦ National Construction Code (NCC)
                                                        NCC Vol2 P3.8.1.0
                                                        All waterproofing material systems
                                                                                                                                                                  DRAWING SET REVISION HISTORY
♦ Queensland Development Code                           components to be installed to                                                                                                                         REVISION SCHEDULE
♦ Standard Building Regulation 2006                     manufacturers specification.                                                                                  Number                             Description                     Date              Issued by
♦ Local government planning policies                    Instructions and material capability to                                                                   1            Developed Drawing Set A                        22/11/23                PD

♦ Estate Design Guidelines                              be checked prior to construction.                                                                         2            Amendments to upper floor                      28/11/23                PD

                                                                                                                                                                  3            Amendment to upper floor layout                29/11/23                PD

                                                                                                                                                                  4            Section & plan updates                         01/12/23                PD

                                                                                                                                                                  5            Amendments to FFL's                            18/12                   PD




                                                                                                                PROJECT ADDRESS :                                     PROJECT                                                                                          C COPYRIGHT
                                                     DIRECTOR :                  DESIGN TEAM :                                                                                                                                                                                                                                  DATE :      18/12/23        A3
                                                     Dominic Tyacke              Aaron Waters
                                                                                                                                                                      STATUS:     Developed Drawings - C
                                                     E : [email protected]    E : [email protected]     2 Jan Street                                          CLIENT :
                                                                                                                                                                                                                                                                       The drawing and the design depicted on this sheet
                                                                                                                                                                                                                                                                       remains the property of qldBUILT. Reproduction in part
                                                                                                                                                                                                                                                                       or whole is prohibited unless written permission is
                                                                                                                                                                                                                                                                                                                                PROJECT NUMBER:        SHEET NUMBER:
                                                     M : 0410 332 167
 Q.B.C.C LICENCE NO. : 15035880   QLDBUILT PTY LTD
                                                     W: www.qldbuilt.com.au
                                                                                 Phil Darwen
                                                                                 E : [email protected]
                                                                                                                Noosa Heads                                                          Venter, Greg & Keri                                                               obtained from qldBUILT. Plans are designed for use on
                                                                                                                                                                                                                                                                       the job address specified in the titleblock only.             23-007                01

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Apdx 1 - Proposal Plans.pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.