HAZARDS IDENTIFICATION & RISK CONTROL                                                                                                                                                                                          REVISION SCHEDULE NOTES
 1. FALLS, SLIPS, TRIPS                                                                              5.. MANUAL TASKS
 a) WORKING AT HEIGHTS                                                                               Components within this design with a mass in excess of 25kg should be lifted by two or more workers or by
 DURING CONSTRUCTION                                                                                 mechanical lifting device. Where this is not practical, suppliers or fabricators should be required to limit the          Revisions to Working Drawing Set A - 28/11/2023
 Wherever possible, components for this building should be prefabricated off-site or at              component mass.
 ground level to minimise the risk of workers falling more than two metres. However,                 All material packaging, building and maintenance components should clearly show the total mass of
 construction of this building will require workers to be working at heights where a fall in         packages and where practical all items should be stored on site in a way which minimises bending before                   •       Amended access to Master robes from bedroom.
 excess of two metres is possible and injury is likely to result from such a fall. The builder       lifting. Advice should be provided on safe lifting methods in all areas where lifting may occur.                          •       Added double glass swing doors from Bed 2 to Balcony on both Units.
 should provide a suitable barrier wherever a person is required to work in a situation where        Construction, maintenance and demolition of this building will require the use of portable tools and
 falling more than two metres is a possibility.                                                      equipment. These should be fully maintained in accordance with manufacturer’s specifications and not used
 DURING OPERATION OR MAINTENANCE                                                                     where faulty or (in the case of electrical equipment) not carrying a current electrical safety tag. All safety            Revisions to Working Drawing Set B - 29/11/2023
 Cleaning and maintenance of windows, walls, roof or other components of this building will          guards or devices should be regularly checked and Personal Protective Equipment should be used in
 require persons to be situated where a fall from a height in excess of two metres is possible.      accordance with manufacturer’s specification.
 Where this type of activity is required, scaffolding, ladders or trestles should be used in                                                                                                                                   •       Amended layout to upper level Master ensuite & WIR
 accordance with relevant codes of practice, regulations or legislation.                             6. HAZARDOUS SUBSTANCES
 Cleaning and maintenance of windows, walls, roof or other components of this building will          ASBESTOS                                                                                                                  •       Rendered perspectives added to drawing set.
 require persons to be situated where a fall from a height in excess of two metres is possible.      (for alterations to a building constructed prior to 1990)
 Where this type of activity is required, scaffolding, fall barriers or Personal Protective          This building was constructed prior to 1990 and therefore may contain asbestos either in cladding material or
 Equipment should be used in accordance with relevant codes of practice, regulations or              in fire retardant insulation material. The builder should check and, if necessary, take appropriate action before
                                                                                                                                                                                                                               Revisions to Working Drawing Set B - 01/12/2023
 legislation.                                                                                        demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure.
 Anchorage points for portable scaffold or fall arrest devices have been included in the design      (for alterations to a building constructed prior to 1986)
 for use by maintenance workers. Any persons engaged to work on the building after                   This building was constructed prior to 1986 and therefore is likely to contain asbestos either in cladding
                                                                                                                                                                                                                               •       Added Section 4 to drawing set
 completion of construction work should be informed about the anchorage points.                      material or in fire retardant insulation material. The builder should check and, if necessary, take appropriate           •       Updates to plan layout (colour added)
                                                                                                     action before demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure.
 b) SLIPPERY OR UNEVEN SURFACES                                                                      POWDERED MATERIALS
                                                                                                                                                                                                                               •       Exterior renders added to individual sheets (R01-R05)
 FLOOR FINISHES                                                                                      Many materials used in the construction of this building can cause harm if inhaled in powdered form. Persons
 Specified finishes have been selected to minimise the risk of floors and paved areas                working on or in the building during construction, operational maintenance or demolition should ensure
 becoming slippery when wet or when walked on with wet shoes/feet. Any changes to the                good ventilation and wear Personal Protective Equipment including protection against inhalation while
 specified finish should be made in consultation with the designer or, if this is not practical,     using powdered material or when sanding, drilling, cutting or otherwise disturbing or creating powdered
 surfaces with an equivalent or better slip resistance should be chosen.                             material.
 The owner is responsible for the selection of surface finishes in the pedestrian trafficable
 areas of this building. Surfaces should be selected in accordance with AS HB 197:1999 and
 AS/NZ 4586:2004.                                                                                    TREATED TIMBER
                                                                                                     The design of this building includes provision for the inclusion of treated timber within the structure. Dust or
 c) STEPS, LOOSE OBJECTS AND UNEVEN SURFACES                                                         fumes from this material can be harmful. Persons working on or in the building during construction,
 Due to design restrictions for this building, steps and/or ramps are included in the building       operational maintenance or demolition should ensure good ventilation and wear Personal Protective
 which may be a hazard to workers carrying objects or otherwise occupied. Steps should be            Equipment including protection against inhalation of harmful material when sanding, drilling, cutting or
 clearly marked with both visual and tactile warning during construction, maintenance,               using treated timber in any way that may cause harmful material to be released. Do not burn treated timber.
 demolition and at all times when the building operates as a workplace.                              VOLATILE ORGANIC COMPOUNDS
 Building owners and occupiers should monitor the pedestrian access ways and in particular           Many types of glue, solvents, spray packs, paints, varnishes and some cleaning materials and disinfectants
 access to areas where maintenance is routinely carried out to ensure that surfaces have not         have dangerous emissions. Areas where these are used should be kept well ventilated while the material is
 moved or cracked so that they become uneven and present a trip hazard. Spills, loose                being used and for a period after installation. Personal Protective Equipment may also be required. The
 material, stray objects or any other matter that may cause a slip or trip hazard should be          manufacturer’s recommendations for use must be carefully considered at all times.
 cleaned or removed from access ways.                                                                SYNTHETIC MINERAL FIBRE
 Contractors should be required to maintain a tidy work site during construction,                    Fibreglass, rockwool, ceramic and other material used for thermal or sound insulation may contain synthetic
 maintenance or demolition to reduce the risk of trips and falls in the workplace. Materials for     mineral fibre which may be harmful if inhaled or if it comes in contact with the skin, eyes or other sensitive
 construction or maintenance should be stored in designated areas away from access ways              parts or the body. Personal Protective Equipment including protection against inhalation of harmful material
 and work areas.                                                                                     should be used when installing, removing or working near bulk insulation material.
                                                                                                     TIMBER FLOORS
 2. FALLING OBJECTS                                                                                  This building contains timber floors which have an applied finish. Areas where finishes are applied should be
 LOOSE MATERIALS OR SMALL OBJECTS                                                                    kept well ventilated during sanding and application and for a period after installation. Personal Protective
 Construction, maintenance or demolition work on or around this building is likely to involve        Equipment may also be required. The manufacturer’s recommendations for use must be carefully considered
 persons working above ground level or above floor levels. Where this occurs one or more of          at all times.
 the following measures should be taken to avoid objects falling from the area where the
 work is being carried out onto persons below.
 1.            Prevent or restrict access to areas below where the work is being carried out.        7. CONFINED SPACES
 2.            Provide toeboards to scaffolding or work platforms.                                   EXCAVATION
 3.            Provide protective structure below the work area.                                     Construction of this building and some maintenance on the building will require excavation and installation
 4.            Ensure that all persons below the work area have Personal Protective                  of items within excavations. Where practical, installation should be carried out using methods which do not
               Equipment.                                                                            require workers to enter the excavation. Where this is not practical, adequate support for the excavated area
 BUILDING COMPONENTS                                                                                 should be provided to prevent collapse. Warning signs and barriers to prevent accidental or unauthorised
 During construction, renovation or demolition of this building, parts of the structure              access to all excavations should be provided.
 including fabricated steelwork, heavy panels and many other components will remain
 standing prior to or after supporting parts are in place. Contractors should ensure that
 temporary bracing or other required support is in place at all times when collapse which            ENCLOSED SPACES
 may injure persons in the area is a possibility.
 Mechanical lifting of materials and components during construction, maintenance or                  Enclosed spaces within this building may present a risk to persons entering for construction, maintenance or
 demolition presents a risk of falling objects. Contractors should ensure that appropriate           any other purpose. The design documentation calls for warning signs and barriers to unauthorised access.
 lifting devices are used, that loads are properly secured and that access to areas below the        These should be maintained throughout the life of the building. Where workers are required to enter
 load is prevented or restricted.                                                                    enclosed spaces, air testing equipment and Personal Protective Equipment should be provided.
                                                                                                     SMALL SPACES




                                                                                                                                                                                                                                                                                                                                                                                                                                                   C:\Users\phil\qldBUILT Dropbox\qldBUILT Design (phil)\2 Jan St\1-PRE CON\3 - Architectural Design\8 - Revit Files\2 Jan Street - revised concept design G.rvt
 3. TRAFFIC MANAGEMENT                                                                               Some small spaces within this building will require access by construction or maintenance workers. The
                                                                                                     design documentation calls for warning signs and barriers to unauthorised access. These should be
 (for building on a major road, narrow road or steeply sloping road)                                 maintained throughout the life of the building. Where workers are required to enter small spaces they should
 Parking of vehicles or loading/unloading of vehicles on this roadway may cause a traffic            be scheduled so that access is for short periods. Manual lifting and other manual activity should be restricted
 hazard. During construction, maintenance or demolition of this building designated                  in small spaces.
 parking for workers and loading areas should be provided. Trained traffic management
 personnel should be responsible for the supervision of these areas.                                 8. PUBLIC ACCESS
 (for building where on-site loading/unloading is restricted)                                        Public access to construction and demolition sites and to areas under maintenance causes risk to workers
 Construction of this building will require loading and unloading of materials on the                and public. Warning signs and secure barriers to unauthorised access should be provided. Where electrical
 roadway. Deliveries should be well planned to avoid congestion of loading areas and trained         installations, excavations, plant or loose materials are present they should be secured when not fully
 traffic management personnel should be used to supervise loading/unloading areas.                   supervised.
 (for all buildings)
 Busy construction and demolition sites present a risk of collision where deliveries and other       9. OPERATIONAL USE OF BUILDING
 traffic are moving within the site. A traffic management plan supervised by trained traffic
 management personnel should be adopted for the work site.                                           This building has been designed as a residential building. If it, at a later date, is used or intended to be used as
                                                                                                     a workplace, the provisions of the Work Health and Safety Act 2011 or subsequent replacement Act should be
 4. SERVICES                                                                                         applied to the new use.
 Rupture of services during excavation or other activity creates a variety of risks including
 release of hazardous material. Existing services are located on or around this site. Where          This building has been designed to requirements of the classification identified on the drawings. The specific
 known, these are identified on the plans but the exact location and extent of services may          use of the building is not known at the time of the design and a further assessment of the workplace health
 vary from that indicated. Services should be located using an appropriate service (such as          and safety issues should be undertaken at the time of fit-out for the end-user.
 Dial Before You Dig), appropriate excavation practice should be used and, where necessary,
 specialist contractors should be used.                                                              This building has been designed for the specific use as identified on the drawings. Where a change of use
 (in locations with underground power)                                                               occurs at a later date a further assessment of the workplace health and safety issues should be undertaken.
 Underground power lines are located in or around this site. All underground power lines
 must be disconnected or carefully located and adequate warning signs used prior to any              10. OTHER HIGH RISK ACTIVITY
 construction, maintenance or demolition commencing.                                                 All electrical work should be carried out in accordance with Code of Practice: Managing Electrical Risks at the
 (in locations with overhead power lines )                                                           Workplace, AS/NZ 3012 and all licensing requirements.
 Overhead power lines are near or on this site. These pose a risk of electrocution if struck or      All work using Plant should be carried out in accordance with Code of Practice: Managing Risks of Plant at
 approached by lifting devices or other plant and persons working above ground level. Where          the Workplace.
 there is a danger of this occurring, power lines should be, where practical, disconnected or        All work should be carried out in accordance with Code of Practice: Managing Noise and Preventing Hearing
 relocated. Where this is not practical adequate warning in the form of bright coloured tape         Loss at Work.
 or signage should be used or a protective barrier provided.                                         Due to the history of serious incidents it is recommended that particular care be exercised when undertaking
                                                                                                     work involving steel construction and concrete placement. All the above applies.
                                                                                                                                                                                                                                                                                                            The drawing and the design depicted on this sheet remains the property of qldBUILT. Reproduction in part or whole is prohibited
                                                                                                                                                                                                                                                                                          C COPYRIGHT       unless written permission is obtained from qldBUILT. Plans are designed for use on the job address specified in the titleblock only.

                                                                                DIRECTOR :                    DESIGN TEAM :                                PROJECT ADDRESS :                                                PROJECT                                                                                    REVISION SCHEDULE                                     DATE :                     18/12/23                   A3
                                                                                                              Aaron Waters                                                                                                  STATUS:    Developed Drawings - C                                           Number             Description            Date        Issued by
                                                                                Dominic Tyacke
                                                                                E : [email protected]      E : [email protected]                   2 Jan Street                                                                                                                                 4            Section & plan
                                                                                                                                                                                                                                                                                                                     updates
                                                                                                                                                                                                                                                                                                                                              01/12/23      PD
                                                                                                                                                                                                                                                                                                                                                                                  PROJECT NUMBER:                       SHEET NUMBER:
                                                                                M : 0410 332 167                                                                                                                            CLIENT :

Q.B.C.C LICENCE NO. : 15035880                 QLDBUILT PTY LTD
                                                                                W: www.qldbuilt.com.au
                                                                                                              Phil Darwen
                                                                                                              E : [email protected]
                                                                                                                                                           Noosa Heads                                                                 Venter, Greg & Keri                                              5            Amendments to FFL's 18/12              PD
                                                                                                                                                                                                                                                                                                                                                                                      23-007                                    T01

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Apdx 1 - Proposal Plans.pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.