HAZARDS IDENTIFICATION & RISK CONTROL REVISION SCHEDULE NOTES
1. FALLS, SLIPS, TRIPS 5.. MANUAL TASKS
a) WORKING AT HEIGHTS Components within this design with a mass in excess of 25kg should be lifted by two or more workers or by
DURING CONSTRUCTION mechanical lifting device. Where this is not practical, suppliers or fabricators should be required to limit the Revisions to Working Drawing Set A - 28/11/2023
Wherever possible, components for this building should be prefabricated off-site or at component mass.
ground level to minimise the risk of workers falling more than two metres. However, All material packaging, building and maintenance components should clearly show the total mass of
construction of this building will require workers to be working at heights where a fall in packages and where practical all items should be stored on site in a way which minimises bending before • Amended access to Master robes from bedroom.
excess of two metres is possible and injury is likely to result from such a fall. The builder lifting. Advice should be provided on safe lifting methods in all areas where lifting may occur. • Added double glass swing doors from Bed 2 to Balcony on both Units.
should provide a suitable barrier wherever a person is required to work in a situation where Construction, maintenance and demolition of this building will require the use of portable tools and
falling more than two metres is a possibility. equipment. These should be fully maintained in accordance with manufacturer’s specifications and not used
DURING OPERATION OR MAINTENANCE where faulty or (in the case of electrical equipment) not carrying a current electrical safety tag. All safety Revisions to Working Drawing Set B - 29/11/2023
Cleaning and maintenance of windows, walls, roof or other components of this building will guards or devices should be regularly checked and Personal Protective Equipment should be used in
require persons to be situated where a fall from a height in excess of two metres is possible. accordance with manufacturer’s specification.
Where this type of activity is required, scaffolding, ladders or trestles should be used in • Amended layout to upper level Master ensuite & WIR
accordance with relevant codes of practice, regulations or legislation. 6. HAZARDOUS SUBSTANCES
Cleaning and maintenance of windows, walls, roof or other components of this building will ASBESTOS • Rendered perspectives added to drawing set.
require persons to be situated where a fall from a height in excess of two metres is possible. (for alterations to a building constructed prior to 1990)
Where this type of activity is required, scaffolding, fall barriers or Personal Protective This building was constructed prior to 1990 and therefore may contain asbestos either in cladding material or
Equipment should be used in accordance with relevant codes of practice, regulations or in fire retardant insulation material. The builder should check and, if necessary, take appropriate action before
Revisions to Working Drawing Set B - 01/12/2023
legislation. demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure.
Anchorage points for portable scaffold or fall arrest devices have been included in the design (for alterations to a building constructed prior to 1986)
for use by maintenance workers. Any persons engaged to work on the building after This building was constructed prior to 1986 and therefore is likely to contain asbestos either in cladding
• Added Section 4 to drawing set
completion of construction work should be informed about the anchorage points. material or in fire retardant insulation material. The builder should check and, if necessary, take appropriate • Updates to plan layout (colour added)
action before demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure.
b) SLIPPERY OR UNEVEN SURFACES POWDERED MATERIALS
• Exterior renders added to individual sheets (R01-R05)
FLOOR FINISHES Many materials used in the construction of this building can cause harm if inhaled in powdered form. Persons
Specified finishes have been selected to minimise the risk of floors and paved areas working on or in the building during construction, operational maintenance or demolition should ensure
becoming slippery when wet or when walked on with wet shoes/feet. Any changes to the good ventilation and wear Personal Protective Equipment including protection against inhalation while
specified finish should be made in consultation with the designer or, if this is not practical, using powdered material or when sanding, drilling, cutting or otherwise disturbing or creating powdered
surfaces with an equivalent or better slip resistance should be chosen. material.
The owner is responsible for the selection of surface finishes in the pedestrian trafficable
areas of this building. Surfaces should be selected in accordance with AS HB 197:1999 and
AS/NZ 4586:2004. TREATED TIMBER
The design of this building includes provision for the inclusion of treated timber within the structure. Dust or
c) STEPS, LOOSE OBJECTS AND UNEVEN SURFACES fumes from this material can be harmful. Persons working on or in the building during construction,
Due to design restrictions for this building, steps and/or ramps are included in the building operational maintenance or demolition should ensure good ventilation and wear Personal Protective
which may be a hazard to workers carrying objects or otherwise occupied. Steps should be Equipment including protection against inhalation of harmful material when sanding, drilling, cutting or
clearly marked with both visual and tactile warning during construction, maintenance, using treated timber in any way that may cause harmful material to be released. Do not burn treated timber.
demolition and at all times when the building operates as a workplace. VOLATILE ORGANIC COMPOUNDS
Building owners and occupiers should monitor the pedestrian access ways and in particular Many types of glue, solvents, spray packs, paints, varnishes and some cleaning materials and disinfectants
access to areas where maintenance is routinely carried out to ensure that surfaces have not have dangerous emissions. Areas where these are used should be kept well ventilated while the material is
moved or cracked so that they become uneven and present a trip hazard. Spills, loose being used and for a period after installation. Personal Protective Equipment may also be required. The
material, stray objects or any other matter that may cause a slip or trip hazard should be manufacturer’s recommendations for use must be carefully considered at all times.
cleaned or removed from access ways. SYNTHETIC MINERAL FIBRE
Contractors should be required to maintain a tidy work site during construction, Fibreglass, rockwool, ceramic and other material used for thermal or sound insulation may contain synthetic
maintenance or demolition to reduce the risk of trips and falls in the workplace. Materials for mineral fibre which may be harmful if inhaled or if it comes in contact with the skin, eyes or other sensitive
construction or maintenance should be stored in designated areas away from access ways parts or the body. Personal Protective Equipment including protection against inhalation of harmful material
and work areas. should be used when installing, removing or working near bulk insulation material.
TIMBER FLOORS
2. FALLING OBJECTS This building contains timber floors which have an applied finish. Areas where finishes are applied should be
LOOSE MATERIALS OR SMALL OBJECTS kept well ventilated during sanding and application and for a period after installation. Personal Protective
Construction, maintenance or demolition work on or around this building is likely to involve Equipment may also be required. The manufacturer’s recommendations for use must be carefully considered
persons working above ground level or above floor levels. Where this occurs one or more of at all times.
the following measures should be taken to avoid objects falling from the area where the
work is being carried out onto persons below.
1. Prevent or restrict access to areas below where the work is being carried out. 7. CONFINED SPACES
2. Provide toeboards to scaffolding or work platforms. EXCAVATION
3. Provide protective structure below the work area. Construction of this building and some maintenance on the building will require excavation and installation
4. Ensure that all persons below the work area have Personal Protective of items within excavations. Where practical, installation should be carried out using methods which do not
Equipment. require workers to enter the excavation. Where this is not practical, adequate support for the excavated area
BUILDING COMPONENTS should be provided to prevent collapse. Warning signs and barriers to prevent accidental or unauthorised
During construction, renovation or demolition of this building, parts of the structure access to all excavations should be provided.
including fabricated steelwork, heavy panels and many other components will remain
standing prior to or after supporting parts are in place. Contractors should ensure that
temporary bracing or other required support is in place at all times when collapse which ENCLOSED SPACES
may injure persons in the area is a possibility.
Mechanical lifting of materials and components during construction, maintenance or Enclosed spaces within this building may present a risk to persons entering for construction, maintenance or
demolition presents a risk of falling objects. Contractors should ensure that appropriate any other purpose. The design documentation calls for warning signs and barriers to unauthorised access.
lifting devices are used, that loads are properly secured and that access to areas below the These should be maintained throughout the life of the building. Where workers are required to enter
load is prevented or restricted. enclosed spaces, air testing equipment and Personal Protective Equipment should be provided.
SMALL SPACES
C:\Users\phil\qldBUILT Dropbox\qldBUILT Design (phil)\2 Jan St\1-PRE CON\3 - Architectural Design\8 - Revit Files\2 Jan Street - revised concept design G.rvt
3. TRAFFIC MANAGEMENT Some small spaces within this building will require access by construction or maintenance workers. The
design documentation calls for warning signs and barriers to unauthorised access. These should be
(for building on a major road, narrow road or steeply sloping road) maintained throughout the life of the building. Where workers are required to enter small spaces they should
Parking of vehicles or loading/unloading of vehicles on this roadway may cause a traffic be scheduled so that access is for short periods. Manual lifting and other manual activity should be restricted
hazard. During construction, maintenance or demolition of this building designated in small spaces.
parking for workers and loading areas should be provided. Trained traffic management
personnel should be responsible for the supervision of these areas. 8. PUBLIC ACCESS
(for building where on-site loading/unloading is restricted) Public access to construction and demolition sites and to areas under maintenance causes risk to workers
Construction of this building will require loading and unloading of materials on the and public. Warning signs and secure barriers to unauthorised access should be provided. Where electrical
roadway. Deliveries should be well planned to avoid congestion of loading areas and trained installations, excavations, plant or loose materials are present they should be secured when not fully
traffic management personnel should be used to supervise loading/unloading areas. supervised.
(for all buildings)
Busy construction and demolition sites present a risk of collision where deliveries and other 9. OPERATIONAL USE OF BUILDING
traffic are moving within the site. A traffic management plan supervised by trained traffic
management personnel should be adopted for the work site. This building has been designed as a residential building. If it, at a later date, is used or intended to be used as
a workplace, the provisions of the Work Health and Safety Act 2011 or subsequent replacement Act should be
4. SERVICES applied to the new use.
Rupture of services during excavation or other activity creates a variety of risks including
release of hazardous material. Existing services are located on or around this site. Where This building has been designed to requirements of the classification identified on the drawings. The specific
known, these are identified on the plans but the exact location and extent of services may use of the building is not known at the time of the design and a further assessment of the workplace health
vary from that indicated. Services should be located using an appropriate service (such as and safety issues should be undertaken at the time of fit-out for the end-user.
Dial Before You Dig), appropriate excavation practice should be used and, where necessary,
specialist contractors should be used. This building has been designed for the specific use as identified on the drawings. Where a change of use
(in locations with underground power) occurs at a later date a further assessment of the workplace health and safety issues should be undertaken.
Underground power lines are located in or around this site. All underground power lines
must be disconnected or carefully located and adequate warning signs used prior to any 10. OTHER HIGH RISK ACTIVITY
construction, maintenance or demolition commencing. All electrical work should be carried out in accordance with Code of Practice: Managing Electrical Risks at the
(in locations with overhead power lines ) Workplace, AS/NZ 3012 and all licensing requirements.
Overhead power lines are near or on this site. These pose a risk of electrocution if struck or All work using Plant should be carried out in accordance with Code of Practice: Managing Risks of Plant at
approached by lifting devices or other plant and persons working above ground level. Where the Workplace.
there is a danger of this occurring, power lines should be, where practical, disconnected or All work should be carried out in accordance with Code of Practice: Managing Noise and Preventing Hearing
relocated. Where this is not practical adequate warning in the form of bright coloured tape Loss at Work.
or signage should be used or a protective barrier provided. Due to the history of serious incidents it is recommended that particular care be exercised when undertaking
work involving steel construction and concrete placement. All the above applies.
The drawing and the design depicted on this sheet remains the property of qldBUILT. Reproduction in part or whole is prohibited
C COPYRIGHT unless written permission is obtained from qldBUILT. Plans are designed for use on the job address specified in the titleblock only.
DIRECTOR : DESIGN TEAM : PROJECT ADDRESS : PROJECT REVISION SCHEDULE DATE : 18/12/23 A3
Aaron Waters STATUS: Developed Drawings - C Number Description Date Issued by
Dominic Tyacke
E : [email protected] E : [email protected] 2 Jan Street 4 Section & plan
updates
01/12/23 PD
PROJECT NUMBER: SHEET NUMBER:
M : 0410 332 167 CLIENT :
Q.B.C.C LICENCE NO. : 15035880 QLDBUILT PTY LTD
W: www.qldbuilt.com.au
Phil Darwen
E : [email protected]
Noosa Heads Venter, Greg & Keri 5 Amendments to FFL's 18/12 PD
23-007 T01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Apdx 1 - Proposal Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.