GENERAL COMMITTEE MEETING                                                 17 SEPTEMBER 2018


         Waste Storage
         16.   Waste storage and disposal facilities must be provided in accordance with
               Planning Scheme Policy 9, Waste Management.
         17.   All refuse and recycling containers must be suitably screened from neighbouring
               properties.
         ENGINEERING
         Site Access and Driveways
         18.   Approval from the Department of Transport and Main Roads for the final design
               and construction of the site access and driveway works must be submitted in
               writing to Council prior to the commencement of the use.
         Car Parking
         19.   A minimum of 7 car parking spaces must be provided and marked on the site as
               part of the first stage of development. The carparking area must be designed by
               a suitably qualified person and must be constructed with:
               a.    a suitably bound surface that minimises the impacts of dust and noise on
                     the proposed development and the adjoining property;
               b.    dimensions, crossfalls and gradients in accordance with Australian
                     Standards AS/NZS2890.1:2004 and AS/NZS2890.6:2009 for the relevant
                     user class.
         Stormwater Drainage
         20.   Stormwater runoff from the development must be disposed of on-site without
               causing scour or damage to the subject site or any adjoining property.
         Earthworks
         21.   All earthworks and associated batters must be contained entirely within the
               subject site unless written permission from the respective landowner(s) is
               provided to Council. All earthworks must be undertaken in accordance with the
               provisions of Australian Standard AS3798: Guidelines on Earthworks for
               Commercial and Residential Developments.
         Damage to Services and Assets
         22.   Any damage caused to existing services and assets as a result of the
               development works must be repaired at no cost to the asset owner at the
               following times:
               a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                     immediately; or
               b.    where otherwise, upon completion of the works associated with the
                     development.
               Any repair work which proposes to alter the alignment or level of existing services
               and assets must first be referred to the relevant service authority for approval.
    B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.




                                                                                     Page 3 of 9
Log in to download the original file

2018-09-17 General Committee Meeting Notes(PDF, 403KB).pdf · 413 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.