Original source · versioned page text
2018-09-17 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 17 SEPTEMBER 2018
Waste Storage
16. Waste storage and disposal facilities must be provided in accordance with
Planning Scheme Policy 9, Waste Management.
17. All refuse and recycling containers must be suitably screened from neighbouring
properties.
ENGINEERING
Site Access and Driveways
18. Approval from the Department of Transport and Main Roads for the final design
and construction of the site access and driveway works must be submitted in
writing to Council prior to the commencement of the use.
Car Parking
19. A minimum of 7 car parking spaces must be provided and marked on the site as
part of the first stage of development. The carparking area must be designed by
a suitably qualified person and must be constructed with:
a. a suitably bound surface that minimises the impacts of dust and noise on
the proposed development and the adjoining property;
b. dimensions, crossfalls and gradients in accordance with Australian
Standards AS/NZS2890.1:2004 and AS/NZS2890.6:2009 for the relevant
user class.
Stormwater Drainage
20. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
Earthworks
21. All earthworks and associated batters must be contained entirely within the
subject site unless written permission from the respective landowner(s) is
provided to Council. All earthworks must be undertaken in accordance with the
provisions of Australian Standard AS3798: Guidelines on Earthworks for
Commercial and Residential Developments.
Damage to Services and Assets
22. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 3 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.