                                      \ emfgriffiths
May 1O 2022
2170644esd-l




GH Group
PO Box 54
NOOSA HEADS QLD 4567




Attention          PhilStarkey
Email:             ph i lstarkev@qh properties.com.au

Dear Phil

RE:                NOOSA SPRINGS BOUTIQUE HOTEL - PV SOLAR POWER


Phil, we have reviewed the latest design provided and confirm PV design shown will have space for a
50kVA solar PV power generating system.

The benefits of the system being provided include the following:-


Roof Top Solar Power

The development is to have a 50kVA rooftop PV solar power system. This is concealed in recessed roof
plant areas and on top of car bays as shown. This is so the plant and PV panels are not visible but still
fully exposed to the sun.

This will provide the following benefits:-

a        A 50kVA PV system will save approximately 60,000k9 of CO2 greenhouse emissions per annum
a        The environmental benefit of this is the equivalent of:
         -         planting 360 trees; or
         -         taking 12 petrol cars off the road; or
         -         making B homes completely carbon neutral.

We trust this is sufficient for your requirements. However, should you require any further information please
contact the undersigned.



Yours faithfully


(() Y,kA
Warren Barfett


821 70644esd-l

                                                                                                                r#
                                      GOLD COAST. BRISBANE' SYDNEY
                              EMF Griffiths Consulting Pty Ltd - Consulting Engineers
                                Level2,26 Commercial Rd, NEWSTEAD QLD 4006
                       Tel +61 7 5593 2075 Fax +61 7 5593 2095 Email [email protected]
                                              ABN 50 166 024 880


[OCR of page images]
May 10 2022
2170644esd-I

GH Group
PO Box 54
NOOSA HEADS QLD 4567

Attention: Phil Starkey

Email: [email protected]
Dear Phil
RE: NOOSA SPRINGS BOUTIQUE HOTEL — PV SOLAR POWER

Phil, we have reviewed the latest design provided and confirm PV design shown will have space for a
50kVA solar PV power generating system.

The benefits of the system being provided include the following:-

Roof Top Solar Power

The development is to have a 50kVA rooftop PV solar power system. This is concealed in recessed roof
plant areas and on top of car bays as shown. This is so the plant and PV panels are not visible but still
fully exposed to the sun.

This will provide the following benefits:-

e A 50kVA PV system will save approximately 60,000kg of CO2 greenhouse emissions per annum.
° The environmental benefit of this is the equivalent of:

- planting 360 trees; or

- taking 12 petrol cars off the road; or

- making 8 homes completely carbon neutral.

We trust this is sufficient for your requirements. However, should you require any further information please
contact the undersigned.

Yours faithfully
po. Woda

Warren Barfett

B2170644esd-!

GOLD COAST - BRISBANE - SYDNEY

ENF Griffiths Consulting Pty Ltd —- Consulting Engineers
Level 2, 26 Commercial Rd, NEWSTEAD QLD 4006
Tel +61 7 5593 2075 Fax +61 7 5593 2095 Email [email protected]
ABN 50 166 024 880

Log in to download the original (Attachment 8 - Energy Efficiency Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 8 pages

Page 2

      NOOSA SPRINGS BOUTIQUE HOTEL

                NOOSA QLD




DA – ESD – SUPERIOR DESIGN OUTCOMES REPORT




              GH PROPERTIES

                    Client




               EMF GRIFFITHS

          Sustainability Consultants




                  ‘ISSUE A’




                MAY 10 2022

           PROJECT NO. B2170644


[OCR of page images]
emf

NOOSA SPRINGS BOUTIQUE HOTEL

NOOSA QLD

DA - ESD - SUPERIOR DESIGN OUTCOMES REPORT

GH PROPERTIES

Client

EMF GRIFFITHS

Sustainability Consultants

‘ISSUE A’

MAY 10 2022

PROJECT NO. B2170644

Page 3

    EMF GRIFFITHS - SUSTAINABILIW CONSULTANTS




A         1010512022           ISSUED FOR DA           CV   WB   o.a.   fWc^




    Noosa Springs Boutique Hotel, Noosa Qld
    DA-ESD Superior Design Outcomes Report - lssue A
    B2170644dasdoRevA-wbr - May 10 2022


[OCR of page images]
EMF GRIFFITHS — SUSTAINABILITY CONSULTANTS

 

10/05/2022 ISSUED FOR DA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Noosa Springs Boutique Hotel, Noosa Qid i
DA-ESD Superior Design Outcomes Report - Issue A
B2170644dasdoRevA-wbr — May 10 2022

Page 4

EMF GRIFFITHS – SUSTAINABILITY CONSULTANTS



                                                                          INDEX

EXECUTIVE SUMMARY ......................................................................................................................................... 2

SECTION 1.0             INTRODUCTION ......................................................................................................................... 3

SECTION 2.0 SUPERIOR DESIGN OUTCOMES .............................................................................................. 4
2.1    FACADE AMENITY                                                                                                               4
2.2    ENERGY MANAGEMENT                                                                                                            5
2.3    WATER                                                                                                                        6
2.4    WASTE AND MATERIALS                                                                                                          6




Noosa Springs Boutique Hotel, Noosa Qld                                                                                                                       i
DA-ESD Superior Design Outcomes Report – Issue A
B2170644dasdoRevA-wbr – May 10 2022


[OCR of page images]
EMF GRIFFITHS — SUSTAINABILITY CONSULTANTS

 

INDEX
EXECUTIVE SUMMARY..........:scscssssssssssssssssssesesesessesssesescscsesetsesesesescsnsusuesesesescacseseuesesesescacaeutstaesusnseaneneueanseseneatans
SECTION 1.0 INTRODUCTION. ...........scssssssssssssssesesssesessssssssesesnsessssesssescscansussesesesescscaceuesesesesnseacaneseunseaeseseaneneets
SECTION 2.0 SUPERIOR DESIGN OUTCOMEG...........ccscssssssssssssssssssesssssessssssssssesssesesessessseseacesseesnsessseseaneeees
2.1 FACADE AMENITY
2.2 ENERGY MANAGEMENT
2.3 WATER
2.4 WASTE AND MATERIALS

Noosa Springs Boutique Hotel, Noosa Qld
DA-ESD Superior Design Outcomes Report — Issue A
B2170644dasdoRevA-wbr — May 10 2022

Donn

Page 5

EMF GRIFFITHS – SUSTAINABILITY CONSULTANTS


EXECUTIVE SUMMARY

The proposed development, Noosa Springs Hotel Development, comprises of a luxury hotel development that rises
from a Ground Level.

EMF Griffiths are the project’s Sustainability Consultants. This report outlines the project’s commitment to superior
design outcomes with respect to ESD.

The key achievements which can be considered a superior design outcome with respect to ESD are as follows: -

                               A performance integrated facade that incorporates good levels of insulation,
  Facade Amenity               glazing, and private balconies that provide passive shading and shelter from wind
                               and sunlight.
                               The buildings incorporate significant passive design initiatives that result in a
                               reduction in annual cooling demand when compared to a standard
  Energy Management            Deemed-To-Satisfy outcome. The annual thermal energy load is less than the code
  and Lifecycle Impacts        required levels. This results in direct reduction in energy to heat and cool the
                               building with associated improvements in running costs, efficient resource use and
                               less greenhouse gas emissions.

  Water                        Rainwater water is to be harvested for pool top-up and irrigation.


                               As a brief requirement, materials shall be selected which minimise the use of
                               materials that deplete natural resources or create toxic pollution during
  Waste and Materials
                               manufacture. Materials with potential for end of life recycling or that contain or are
                               manufactured with high levels of recycled or waste materials are encouraged.




Noosa Springs Boutique Hotel, Noosa Qld                                                                             2
DA-ESD Superior Design Outcomes Report – Issue A
B2170644dasdoRevA-wbr – May 10 2022


[OCR of page images]
EMF GRIFFITHS — SUSTAINABILITY CONSULTANTS

 

EXECUTIVE SUMMARY

The proposed development, Noosa Springs Hotel Development, comprises of a luxury hotel development that rises
from a Ground Level.

EMF Griffiths are the project's Sustainability Consultants. This report outlines the project's commitment to superior
design outcomes with respect to ESD.

The key achievements which can be considered a superior design outcome with respect to ESD are as follows: -

 

A performance integrated facade that incorporates good levels of insulation,
Facade Amenity glazing, and private balconies that provide passive shading and shelter from wind
and sunlight.

 

The buildings incorporate significant passive design initiatives that result in a
reduction in annual cooling demand when compared to a_ standard
Energy Management Deemed-To-Satisfy outcome. The annual thermal energy load is less than the code
and Lifecycle Impacts | required levels. This results in direct reduction in energy to heat and cool the
building with associated improvements in running costs, efficient resource use and
less greenhouse gas emissions.

 

Water Rainwater water is to be harvested for pool top-up and irrigation.

 

As a brief requirement, materials shall be selected which minimise the use of
materials that deplete natural resources or create toxic pollution during
manufacture. Materials with potential for end of life recycling or that contain or are
manufactured with high levels of recycled or waste materials are encouraged.

Waste and Materials

 

 

 

 

Noosa Springs Boutique Hotel, Noosa Qld 2
DA-ESD Superior Design Outcomes Report — Issue A
B2170644dasdoRevA-wbr — May 10 2022

Page 6

EMF GRIFFITHS – SUSTAINABILITY CONSULTANTS


SECTION 1.0       INTRODUCTION

EMF Griffiths has been engaged by GH Properties to report on Superior Design Outcomes (SDO’s) to improve the
sustainability outcomes for the project.

This report will demonstrate how the proposed development protects, manages and enhances natural systems and
promotes the efficient use of materials, water and energy to minimise impacts on the environment. It will illustrate
the project’s specific targeted measures that contribute to a sustainable development.

The development has set real and attainable goals to achieve a superior design outcome. The project focuses on
the following: -

•        A commitment to passive design principles, including energy efficiency and thermal comfort, as well as
         integration of natural ventilation.
•        Project requirements for responsible materials selection and waste reduction.
•        Water use reduction through rainwater harvesting and efficiency measures.
•        Reduce Greenhouse Gas Emissions with reduced energy consumption and an onsite 50kVA solar PV
         power production system.




Noosa Springs Boutique Hotel, Noosa Qld                                                                          3
DA-ESD Superior Design Outcomes Report – Issue A
B2170644dasdoRevA-wbr – May 10 2022


[OCR of page images]
EMF GRIFFITHS — SUSTAINABILITY CONSULTANTS

 

SECTION 1.0 INTRODUCTION

EMF Griffiths has been engaged by GH Properties to report on Superior Design Outcomes (SDO’s) to improve the
sustainability outcomes for the project.

This report will demonstrate how the proposed development protects, manages and enhances natural systems and
promotes the efficient use of materials, water and energy to minimise impacts on the environment. It will illustrate
the project’s specific targeted measures that contribute to a sustainable development.

The development has set real and attainable goals to achieve a superior design outcome. The project focuses on
the following: -

. A commitment to passive design principles, including energy efficiency and thermal comfort, as well as
integration of natural ventilation.

. Project requirements for responsible materials selection and waste reduction.

. Water use reduction through rainwater harvesting and efficiency measures.

. Reduce Greenhouse Gas Emissions with reduced energy consumption and an onsite 50kVA solar PV

power production system.

Noosa Springs Boutique Hotel, Noosa Qld 3
DA-ESD Superior Design Outcomes Report — Issue A
B2170644dasdoRevA-wbr — May 10 2022

Page 7

EMF GRIFFITHS – SUSTAINABILITY CONSULTANTS


SECTION 2.0          SUPERIOR DESIGN OUTCOMES

Significant measures have been undertaken to ensure that this development responsibly impacts upon the local
environment and addresses environmental, social and economic sustainability aspects for the buildings’ occupants,
users and the wider community.

The environmental vision, principles, goals and strategies are described as follows: -


      Vision                                      To Create a Sustainable Urban Community
                 Promoting and                  Providing economic       Protecting ecological        Promoting planning and
  Principles     maintaining a liveable         benefit.                 values and optimising        design excellence.
                 community.                                              resource use.

                 A community that is            Economic benefit is         Protect, manage and       Develop a modern
                 diverse, safe and              maximised by facilitating   enhance natural           resilient and adaptable
                 healthy, has access to         the release of urban        systems, habitats and     urban form that
                 services, jobs and             land, incorporating         biodiversity, and         promotes connectivity,
                 learning, that fosters         lifecycle costs including   promote the               safety and accessibility
                 active local participation     operational savings,        innovative and            whilst recognising
  Goals
                 and is a pleasant place        long term employment        efficient use and         existing local values and
                 to live, work and visit        opportunities, and          management of             aspirations.
                 while integrating with         creating partnering         materials, water and
                 and enhancing the              opportunities and long-     energy to minimise
                 value of existing              term value.                 impacts on the
                 neighbourhoods.                                            climate.
                 •      High quality of life.   •    Public benefit.        •    Climate impact.      •     Community and
                                                                                                            place.
                 •      High levels of          •    Lifecycle costs.       •    Water.
                        community                                                                     •     Responsive urban
                                                •    Land supply.           •    Energy and
                        participation.                                                                      form.
                                                                                 transport.
                                                •    Partnerships.
                 •      Healthy and safe                                                              •     Quality public
                                                                            •    Materials and
                        communities.            •    Sustainability                                         realm.
  Strategies                                                                     waste.
                                                     champion.
                 •      Respect existing                                                              •     Infrastructure.
                                                                            •    Habitats and
                        communities.            •    Local employment.
                                                                                 biodiversity.        •     Connectivity,
                                                                                                            safety and
                                                                            •    Pollution.
                                                                                                            accessibility.
                                                                                                      •     Engagement and
                                                                                                            partnerships.



2.1       FACADE AMENITY

        Deliverable                                                         Strategy

                             Design has maximised the number of hotel rooms that have operable areas of facade to
                             maximise availability of natural ventilation, whilst complying with the BCA operability restrictions.

                             All hotel rooms will have ceiling fans.
  Ventilation
                             Common corridors to be mechanically ventilated.

                             Natural ventilation will be maximised throughout.




Noosa Springs Boutique Hotel, Noosa Qld                                                                               4
DA-ESD Superior Design Outcomes Report – Issue A
B2170644dasdoRevA-wbr – May 10 2022


[OCR of page images]
EMF GRIFFITHS — SUSTAINABILITY CONSULTANTS

 

SECTION 2.0

SUPERIOR DESIGN OUTCOMES

Significant measures have been undertaken to ensure that this development responsibly impacts upon the local
environment and addresses environmental, social and economic sustainability aspects for the buildings’ occupants,
users and the wider community.

The environmental vision, principles, goals and strategies are described as follows: -

 

 

 

 

 

 

 

 

 

Vision To Create a Sustainable Urban Community
Promoting and Providing economic Protecting ecological Promoting planning and
Principles maintaining a liveable benefit. values and optimising | design excellence.
community. resource use.
A community that is Economic benefit is Protect, manage and Develop a modern
diverse, safe and maximised by facilitating | enhance natural resilient and adaptable
healthy, has access to the release of urban systems, habitats and | urban form that
services, jobs and land, incorporating biodiversity, and promotes connectivity,
learning, that fosters lifecycle costs including promote the safety and accessibility
Goals active local participation | operational savings, innovative and whilst recognising
and is a pleasant place | long term employment efficient use and existing local values and
to live, work and visit opportunities, and management of aspirations.
while integrating with creating partnering materials, water and
and enhancing the opportunities and long- energy to minimise
value of existing term value. impacts on the
neighbourhoods. climate.
. High quality of life. | « Public benefit. . Climate impact. | ¢ Community and
. : lace.
. High levels of . Lifecycle costs. . Water. place
community . Responsive urban
participation. * Land supply. ° tran and form.
e Healthy and safe ° Partnerships. . Materials and . Quality public
. communities. . Sustainability realm.
Strategies . champion waste.
. Respect existing . . Habitats and . Infrastructure.
communities. * Local employment. biodiversity. ¢ Connectivity,
. safety and
° Pollution. accessibility.
. Engagement and
partnerships.

 

21 FACADE AMENITY

 

 

 

 

Common corridors to be mechanically ventilated.

Natural ventilation will be maximised throughout.

Deliverable Strategy
Design has maximised the number of hotel rooms that have operable areas of facade to
maximise availability of natural ventilation, whilst complying with the BCA operability restrictions.
All hotel rooms will have ceiling fans.
Ventilation

 

Noosa Springs Boutique Hotel, Noosa Qld
DA-ESD Superior Design Outcomes Report — Issue A
B2170644dasdoRevA-wbr — May 10 2022

 

 

Page 8

EMF GRIFFITHS – SUSTAINABILITY CONSULTANTS


2.2      ENERGY MANAGEMENT

      Deliverable                                          Development Strategy

  Thermal              All rooms will have a heating and cooling load of maximum 43 MJ/m2 and will achieve a good
  Comfort              level of thermal comfort.

                       LED lighting to be used as standard throughout. Light Fittings will be efficient, durable, low
  Energy               maintenance and fit for purpose.
  Efficient
  Lighting             Good levels of illumination is targeted throughout. Lighting design will target maximum average
                       4 watts per m2 across the development.

  Lighting Zoning      Lighting will be zoned and controlled to allow for reduction in lighting energy consumption.

                       Occupancy controls are included to ensure that energy is not wasted by air conditioning and
                       lighting unoccupied spaces.
  Unoccupied
  Spaces               Lobby and common areas hallways will have motion sensing. Car park lighting to have daylight
                       and dual circuits: timed security light circuit and a motion triggered circuit. Similar approach to
                       be used for common areas.

  Fans and
                       All fans and pumps in the building will have high efficiency motors with control to reduce energy
  Pumps
                       consumption.
  Efficiency
                       Regenerative drive converts the excess energy generated by a lift into electricity that can be
                       reused elsewhere in the building. With conventional drives, this energy is converted into heat,
  Energy               which then needs to be removed from the building by air conditioning systems.
  Efficient Lifts
                       Regenerative drive can cut lift energy consumption by 20-35% on average, depending on
                       building height and lift speed. Regenerative drives are included in proposed lift design.




Noosa Springs Boutique Hotel, Noosa Qld                                                                              5
DA-ESD Superior Design Outcomes Report – Issue A
B2170644dasdoRevA-wbr – May 10 2022


[OCR of page images]
EMF GRIFFITHS — SUSTAINABILITY CONSULTANTS

 

2.2 ENERGY MANAGEMENT

 

 

 

Deliverable Development Strategy
Thermal All rooms will have a heating and cooling load of maximum 43 MJ/m? and will achieve a good
Comfort level of thermal comfort.
LED lighting to be used as standard throughout. Light Fittings will be efficient, durable, low
Energy maintenance and fit for purpose.
Efficient
Lighting Good levels of illumination is targeted throughout. Lighting design will target maximum average

4 watts per m? across the development.

 

Lighting Zoning

Lighting will be zoned and controlled to allow for reduction in lighting energy consumption.

 

Occupancy controls are included to ensure that energy is not wasted by air conditioning and
lighting unoccupied spaces.

 

 

Efficient Lifts

 

 

Unoccupied

Spaces Lobby and common areas hallways will have motion sensing. Car park lighting to have daylight
and dual circuits: timed security light circuit and a motion triggered circuit. Similar approach to
be used for common areas.

Fans and . ay: . . . .

Pumps All fans and pumps in the building will have high efficiency motors with control to reduce energy

Efficiency consumption.
Regenerative drive converts the excess energy generated by a lift into electricity that can be
reused elsewhere in the building. With conventional drives, this energy is converted into heat,

Energy which then needs to be removed from the building by air conditioning systems.

Regenerative drive can cut lift energy consumption by 20-35% on average, depending on
building height and lift speed. Regenerative drives are included in proposed lift design.

 

Noosa Springs Boutique Hotel, Noosa Qld 5
DA-ESD Superior Design Outcomes Report — Issue A
B2170644dasdoRevA-wbr — May 10 2022

 

Page 9

EMF GRIFFITHS – SUSTAINABILITY CONSULTANTS


2.3      WATER

    Deliverable                                         Development Strategy
  Rainwater           Rainwater harvested from the roof catchment will be used for irrigation and pool top-up.
  Collection and
  Re-Use
                      All shower roses have a minimum 3-star Water Efficiency Labelling and Standards rating 4.5
                      to 9 litres per minute.

                      All toilet cisterns have a dual flush function and have a minimum 4-star Water Efficiency
  Water               Labelling and Standards rating 4.5 litres per flush full flush and 3 litres per flush half flush, and
  Conservation        are compatible with the size of the toilet bowl to allow for proper functioning of the toilet.

                      All tap ware has a minimum 4-star Water Efficiency Labelling and Standards rating, 6.5 to 7.5
                      litres per minute with tap aerator.
                      Water meters are required on all major water uses in the project.

  Water Meters        Common area water meters [four (4) approx.] will be linked to automated monitoring and
                      provide a leak detection system as standard, with an active alarm process.


  Reduction of        The project will have an efficient plumbing design by minimising piping for the same functional
  Plumbing            requirement and material, and minimising dead legs.
  Materials


2.4      WASTE AND MATERIALS

      Deliverable                                                  Criteria
                      The design will demonstrate innovation in the selection and use of construction materials and
                      products, which minimise the use of materials that deplete natural resources or create toxic
                      pollution in their manufacture. Materials with potential for end of life recycling or that contain or
                      are manufactured with high levels of recycled or waste materials should be encouraged.

                      The following strategies are to be considered for materials selection: -

                      •         Timber products used in the building and construction works are required to be
                                sourced from either or a combination of post-consumer re-used timber; or Forest
                                Stewardship Council (FSC) certified timber.
  Sustainable         •         Total cost of PVC content is to be reduced through replacement with alternative
  Supplier                      materials or ethically manufactured PVC.
                      •         Thermal insulants and refrigerants, where they are used are to avoid the use of ozone-
                                depleting substances in both manufacture and composition.
                      •         All wall, ceiling, carpet and floor finishes, and adhesives and sealants are to be low-
                                VOC emitting (EN 13419).
                      •         The project will, where appropriate, source their manufactured materials from
                                suppliers with ISO14001 certification and EMPs in place.
                      •         The development will use materials sourced locally where practical.
                      •         Reduction of Portland cement in all concrete mixes across the project.
  Waste
                      Waste Management Plan will be provided, outlining benchmarks for recycling and waste
  Management
                      management both during construction and on an ongoing basis.
  Plan




Noosa Springs Boutique Hotel, Noosa Qld                                                                               6
DA-ESD Superior Design Outcomes Report – Issue A
B2170644dasdoRevA-wbr – May 10 2022


[OCR of page images]
EMF GRIFFITHS — SUSTAINABILITY CONSULTANTS

 

2.3 WATER

 

Deliverable

Development Strategy

 

Rainwater
Collection and
Re-Use

Rainwater harvested from the roof catchment will be used for irrigation and pool top-up.

 

Water
Conservation

All shower roses have a minimum 3-star Water Efficiency Labelling and Standards rating 4.5
to 9 litres per minute.

All toilet cisterns have a dual flush function and have a minimum 4-star Water Efficiency
Labelling and Standards rating 4.5 litres per flush full flush and 3 litres per flush half flush, and
are compatible with the size of the toilet bowl to allow for proper functioning of the toilet.

All tap ware has a minimum 4-star Water Efficiency Labelling and Standards rating, 6.5 to 7.5
litres per minute with tap aerator.

 

Water Meters

Water meters are required on all major water uses in the project.

Common area water meters [four (4) approx.] will be linked to automated monitoring and
provide a leak detection system as standard, with an active alarm process.

 

Reduction of
Plumbing
Materials

 

 

The project will have an efficient plumbing design by minimising piping for the same functional
requirement and material, and minimising dead legs.

 

2.4 WASTE AND MATERIALS

 

 

 

 

 

 

Deliverable Criteria
The design will demonstrate innovation in the selection and use of construction materials and
products, which minimise the use of materials that deplete natural resources or create toxic
pollution in their manufacture. Materials with potential for end of life recycling or that contain or
are manufactured with high levels of recycled or waste materials should be encouraged.
The following strategies are to be considered for materials selection: -
. Timber products used in the building and construction works are required to be
sourced from either or a combination of post-consumer re-used timber; or Forest
Stewardship Council (FSC) certified timber.
Sustainable . Total cost of PVC content is to be reduced through replacement with alternative
Supplier materials or ethically manufactured PVC.
. Thermal insulants and refrigerants, where they are used are to avoid the use of ozone-
depleting substances in both manufacture and composition.
. All wall, ceiling, carpet and floor finishes, and adhesives and sealants are to be low-
VOC emitting (EN 13419).
. The project will, where appropriate, source their manufactured materials from
suppliers with 1SO14001 certification and EMPs in place.
. The development will use materials sourced locally where practical.
. Reduction of Portland cement in all concrete mixes across the project.
Man ment Waste Management Plan will be provided, outlining benchmarks for recycling and waste
Plan 9 management both during construction and on an ongoing basis.
Noosa Springs Boutique Hotel, Noosa Qld 6

DA-ESD Superior Design Outcomes Report — Issue A
B2170644dasdoRevA-wbr — May 10 2022

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.