Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Attachment 8 - Energy Efficiency Report.pdf

of 9

Page text read automatically using OCR, there may be inaccuracies

EMF GRIFFITHS – SUSTAINABILITY CONSULTANTS


2.3      WATER

    Deliverable                                         Development Strategy
  Rainwater           Rainwater harvested from the roof catchment will be used for irrigation and pool top-up.
  Collection and
  Re-Use
                      All shower roses have a minimum 3-star Water Efficiency Labelling and Standards rating 4.5
                      to 9 litres per minute.

                      All toilet cisterns have a dual flush function and have a minimum 4-star Water Efficiency
  Water               Labelling and Standards rating 4.5 litres per flush full flush and 3 litres per flush half flush, and
  Conservation        are compatible with the size of the toilet bowl to allow for proper functioning of the toilet.

                      All tap ware has a minimum 4-star Water Efficiency Labelling and Standards rating, 6.5 to 7.5
                      litres per minute with tap aerator.
                      Water meters are required on all major water uses in the project.

  Water Meters        Common area water meters [four (4) approx.] will be linked to automated monitoring and
                      provide a leak detection system as standard, with an active alarm process.


  Reduction of        The project will have an efficient plumbing design by minimising piping for the same functional
  Plumbing            requirement and material, and minimising dead legs.
  Materials


2.4      WASTE AND MATERIALS

      Deliverable                                                  Criteria
                      The design will demonstrate innovation in the selection and use of construction materials and
                      products, which minimise the use of materials that deplete natural resources or create toxic
                      pollution in their manufacture. Materials with potential for end of life recycling or that contain or
                      are manufactured with high levels of recycled or waste materials should be encouraged.

                      The following strategies are to be considered for materials selection: -

                      •         Timber products used in the building and construction works are required to be
                                sourced from either or a combination of post-consumer re-used timber; or Forest
                                Stewardship Council (FSC) certified timber.
  Sustainable         •         Total cost of PVC content is to be reduced through replacement with alternative
  Supplier                      materials or ethically manufactured PVC.
                      •         Thermal insulants and refrigerants, where they are used are to avoid the use of ozone-
                                depleting substances in both manufacture and composition.
                      •         All wall, ceiling, carpet and floor finishes, and adhesives and sealants are to be low-
                                VOC emitting (EN 13419).
                      •         The project will, where appropriate, source their manufactured materials from
                                suppliers with ISO14001 certification and EMPs in place.
                      •         The development will use materials sourced locally where practical.
                      •         Reduction of Portland cement in all concrete mixes across the project.
  Waste
                      Waste Management Plan will be provided, outlining benchmarks for recycling and waste
  Management
                      management both during construction and on an ongoing basis.
  Plan




Noosa Springs Boutique Hotel, Noosa Qld                                                                               6
DA-ESD Superior Design Outcomes Report – Issue A
B2170644dasdoRevA-wbr – May 10 2022


[OCR of page images]
EMF GRIFFITHS — SUSTAINABILITY CONSULTANTS

 

2.3 WATER

 

Deliverable

Development Strategy

 

Rainwater
Collection and
Re-Use

Rainwater harvested from the roof catchment will be used for irrigation and pool top-up.

 

Water
Conservation

All shower roses have a minimum 3-star Water Efficiency Labelling and Standards rating 4.5
to 9 litres per minute.

All toilet cisterns have a dual flush function and have a minimum 4-star Water Efficiency
Labelling and Standards rating 4.5 litres per flush full flush and 3 litres per flush half flush, and
are compatible with the size of the toilet bowl to allow for proper functioning of the toilet.

All tap ware has a minimum 4-star Water Efficiency Labelling and Standards rating, 6.5 to 7.5
litres per minute with tap aerator.

 

Water Meters

Water meters are required on all major water uses in the project.

Common area water meters [four (4) approx.] will be linked to automated monitoring and
provide a leak detection system as standard, with an active alarm process.

 

Reduction of
Plumbing
Materials

 

 

The project will have an efficient plumbing design by minimising piping for the same functional
requirement and material, and minimising dead legs.

 

2.4 WASTE AND MATERIALS

 

 

 

 

 

 

Deliverable Criteria
The design will demonstrate innovation in the selection and use of construction materials and
products, which minimise the use of materials that deplete natural resources or create toxic
pollution in their manufacture. Materials with potential for end of life recycling or that contain or
are manufactured with high levels of recycled or waste materials should be encouraged.
The following strategies are to be considered for materials selection: -
. Timber products used in the building and construction works are required to be
sourced from either or a combination of post-consumer re-used timber; or Forest
Stewardship Council (FSC) certified timber.
Sustainable . Total cost of PVC content is to be reduced through replacement with alternative
Supplier materials or ethically manufactured PVC.
. Thermal insulants and refrigerants, where they are used are to avoid the use of ozone-
depleting substances in both manufacture and composition.
. All wall, ceiling, carpet and floor finishes, and adhesives and sealants are to be low-
VOC emitting (EN 13419).
. The project will, where appropriate, source their manufactured materials from
suppliers with 1SO14001 certification and EMPs in place.
. The development will use materials sourced locally where practical.
. Reduction of Portland cement in all concrete mixes across the project.
Man ment Waste Management Plan will be provided, outlining benchmarks for recycling and waste
Plan 9 management both during construction and on an ongoing basis.
Noosa Springs Boutique Hotel, Noosa Qld 6

DA-ESD Superior Design Outcomes Report — Issue A
B2170644dasdoRevA-wbr — May 10 2022

 

 

Log in to download the original (Attachment 8 - Energy Efficiency Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.