Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Landscape

of 6

Page text shows just the words. Original shows the document exactly as it was published.

DETAILED LANDSCAPE DOCUMENTATION
65-67 ELANDA STREET, SUNSHINE BEACH Q
LANDSCAPE SPECIFICATION
NOTES
1.0 GENERAL                                                                                                 2.4       Compost and Fertiliser
                                                                                                                  Compost                                                                                                          In mass planted areas: Place after the preparation of the planting bed but before planting and
1.1       Standards                                                                                               General: Provide well rotted vegetative material or animal manure, free from harmful chemicals,
                                                                                                                                                                                                                                   other work.

      § Soils to comply with AS 4419-2003 - Soils for Landscaping and Garden Use.                                 grass and weed growth as per AS 4454.                                                                            In smaller areas (e.g. planter boxes): Place after the preparation of the planting bed, planting
                                                                                                                                                                                                                                   and other work.
      § Compost, soil conditioners and mulches to comply with: to AS 4454.                                        Fertiliser
                                                                                                                                                                                                                                   Extent: To surrounds of plants planted in grass areas, provide mulch to a minimum of 600mm
      §   AS 4970 - Protection of trees on development sites                                                      General: Apply Agriform or similar slow release tablets at the following rates.                                  diameter. Keep organic and inorganic mulch not closer than 50mm from plant stems.
      §   AS 4377 - Pruning of Amenity Trees                                                                      Trees 4 Tablets. Shrubs 3 Tablets. Ground covers 1 Tablet. Add a handful of Dynamic Lifter                       Depths: Spread organic mulch to the nominated depth or a minimum depth of 100mm.
      § NATSPEC reference book: Specifying Trees - a guide to assessment of tree quality 2003 by                  and water in well each 4 weeks during the establishment period. Fertilize turf areas with
                                                                                                                  Dynamic Lifter at the rate of 250 grams per 5 m2.
          Ross Clark                                                                                                                                                                                                         6.0 PLANT SUPPORT
2.0 SITE AND SOIL                                                                                           3.0 PLANTS                                                                                                       6.1     Stakes and Ties
2.1       Preparation                                                                                                                                                                                                              Stakes
                                                                                                                                                                                                                                                                                                                                               CONTEXT MAP
                                                                                                            3.1       General
      Weed eradication                                                                                                                                                                                                             Requirement: Generally, plants of good quality should be self-supporting, however stake plants              REFERENCE SCALE
                                                                                                                  General: Provide plants with the following characteristics:                                                      located in open ground or adjacent to vehicular traffic or as directed to mark their location or
      Herbicide: Eradicate weeds using environmentally acceptable methods, such as a non-residual                                                                                                                                  provide additional protection.Material: Hardwood, straight, free from knots or twists, pointed at
                                                                                                                  § Large healthy root systems, with no evidence of root curl, restriction or damage.
      glyphosate herbicide in any of its registered formulae, at the recommended maximum rate.                                                                                                                                     one end.
                                                                                                                  §   Vigorous, well established, free from disease and pests, of good form consistent with the
      Manual removal of weed undergrowth: Regularly remove, by hand, rubbish and weed growth                          species or variety.                                                                                          Installation: Drive stakes into the ground for at least a fifth of their length, avoiding damage to
      throughout grassed, planted and mulched areas. Remove weed growth from an area 750mm
      diameter around the base of the trees in grassed areas. Continue eradication throughout the                 § Hardened off, not soft or forced, and suitable for planting in the natural climatic conditions
                                                                                                                      prevailing at the site.
                                                                                                                                                                                                                                   the root system. Place stake at a clear distance of 50mm from the edge of the rootball.
                                                                                                                                                                                                                                   Plants 2.5m high: Three 50x50x2400mm stakes per plant.
                                                                                                                                                                                                                                                                                                                                                            DRAWING REGISTER
      course of the works and during the planting establishment period.
      Vegetative spoil                                                                                            Supply: Supply plants that are propagated in a nursery facility that have been accredited by the                 Plants 1.0 - 2.5m high: Two 40x40x1800mm stakes/ plant.                                               Drawing No.                                                     Drawing Title                                                             Issue
                                                                                                                  Nursery Industry Association of Australia                                                                        Plants 1.0m high: One 30x30x1200mm stake per plant.
      Remove vegetative spoil from site. Do not burn.
                                                                                                                  Replacement: Replace damaged or failed plants with plants of the same type and size.                                                                                                                                   20-00902-CS01 COVER SHEET                                                                                                                               D
      Site topsoil                                                                                                                                                                                                                 Ties

      Remove Strip topsoil from known areas of construction and stockpile in an appropriate area so         3.2       Plant Containers and Stock Sizes                                                                             General: Provide hessian or equivalent non-abrasive ties fixed securely to the stakes,                20-00902-LP01 LANDSCAPE LAYOUT PLAN                                                                                                                     D
      that drainage and construction is not restricted. Make sure that the soil cannot flow out of the                                                                                                                             preferably one tie at no more than one-third of the main stem, others as necessary to stabilise
                                                                                                                  General: Supply plants in weed free containers of the required size.                                             the plant.                                                                                            20-00902-LP02              GROUND FLOOR PLANTING PLAN                                                                                                   D
      site in a storm situation and infiltrate the storm water system. Erect silt barriers to protect S/W
      system.                                                                                                                                                                                                                                                                                                                            20-00902-LP03              ROOFTOP LANDSCAPE PLAN                                                                                                       D
                                                                                                            4.0 PLANTING                                                                                                     7.0 IRRIGATION
2.2       Subsoil                                                                                                                                                                                                                                                                                                                        20-00902-LP04              TYPICAL LANDSCAPE DETAILS                                                                                                    D
      Cultivation
                                                                                                            4.1       General                                                                                                7.1     General
                                                                                                                  Individual tree stock in grassed areas and planting in beds: Excavate a hole to at least twice the                                                                                                                     20-00902-LP05              PLANTING SCHEDULES                                                                                                           D
      Cultivation depth to existing subgrade: 150mm unless specified otherwise.                                                                                                                                                    Install automatic irrigation to all common areas, and individual tap computers to private
                                                                                                                  diameter of the rootball and at least 1.5 times deeper than the rootball. Break up the base of
      Cultivation depth to garden areas: 300mm unless specified otherwise.                                                                                                                                                         courtyards where applicable. Water to be pump fed from on site rain-water tanks connected to
                                                                                                                  the hole to a further depth of 100mm, and loosen compacted sides of the hole to prevent
                                                                                                                                                                                                                                   down-pipes and storm-water system.
      Cultivation depth to turf and grass areas: 100mm unless specified otherwise.                                confinement of root growth.
      Services and roots: Do not disturb services. Keep clear of tree roots in drip zone. Cultivate by      4.2       Watering                                                                                                                                                                                                                      LANDSCAPING CALCULATIONS
      hand if necessary.
                                                                                                                  Requirement: Thoroughly water the plants before planting, immediately after planting, and as               8.0 COMPLETION
2.3       Topsoil                                                                                                 required to maintain growth rates free of stress.                                                                                                                                                                         SITE AREA                                               GROUND FLOOR LANDSCAPING
      Source                                                                                                      Watering basins for plants in grass: Except in irrigated grassed areas and normally moist areas            8.1    Planting Establishment
      General: Import topsoil unless the topsoil type can be provided from material recovered from
                                                                                                                  and impervious subsurface strata, construct a watering basin around the base of each
                                                                                                                                                                                                                                   Establishment Period
                                                                                                                                                                                                                                                                                                                                             1020m2                                                  487m2                                                          48%
                                                                                                                  individual plant, consisting of a raised ring of soil capable.
      the site.                                                                                                                                                                                                                    Commencement: The planting establishment period commences at the date of practical
      Placing topsoil                                                                                       4.3       Placing                                                                                                      completion inspection. Unless nominated differently continues for a minimum period of 12
      General: Spread the topsoil on the prepared subsoil and grade evenly, making the necessary                  Remove the plant from the container with minimum disturbance to the rootball. Ensure that the                    weeks or until satisfactory handover, whichever is greater.
                                                                                                                                                                                                                                                                                                                                             TOTAL                                           HARD                                                            SOFT
      allowances to permit the following:                                                                         rootball is moist and place it in its final position, in the centre of the hole and plumb, and with              Existing planting and grass
                                                                                                                  the topsoil level of the plant rootball level with the finished surface of the surrounding soil.                                                                                                                        LANDSCAPING                                     LANDSCAPING                                                     LANDSCAPING
      §   Achieve required finished levels and contours after light compaction.                                                                                                                                                    Where existing grass or planting is within the landscape contract area, maintain it as for the
      § Finished surface levels of grassed areas to be flush with adjacent hard surfaces such as            4.4       Fertilising                                                                                                  corresponding classifications of new grass or planting.                                                                                                           197m2                                                          291m2
          kerbs, paths and mowing strips.                                                                         In planting beds and individual plantings, place fertiliser pellets around the plants at the time of             Recurrent works                                                                                            487m2
                                                                                                                  planting.                                                                                                                                                                                                                                                                              40%                                                        60%
      Finished surface levels of mulched areas to be 25mm below adjacent pathways, kerb or the                                                                                                                                     Throughout the planting establishment period, carry out maintenance work including watering,
      like.                                                                                                 54.5 Backfilling                                                                                                       mowing, weeding, rubbish removal, fertilising, pest and disease control, reseeding, returfing,
      Consolidation                                                                                                                                                                                                                staking and tying, replanting, cultivating, pruning, hedge clipping, aerating, reinstatement of
                                                                                                                  Backfill with topsoil mixture. Lightly tamp and water to eliminate air pockets. Ensure that                      mulch, renovating, top dressing, and keeping the site neat and tidy.                                                                              PP


      Compact lightly and uniformly in 150mm loose layers. Avoid differential subsidence and                      topsoil is not placed over the top of the rootball, so that the plant stem remains the same height
                                                                                                                                                                                                                                                                                                                                                                                                                                            89°56'36"




      excess compaction. Produce a finished topsoil surface that has the following characteristics:               above ground as it was in the container.                                                                         Replacements                                                                                                                                     RL 43440         RL 43440
                                                                                                                                                                                                                                                                                                                                                                                                                            DP        DP




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    179°58'36"
                                                                                                                                                                                                                                   Continue to replace failed, damaged or stolen plants. Replacement plants are to match the
                                                                                                                                                                                                                                                                                                                                                                                                                                             RL 43290


      § Finish to design levels.
      § Smooth and free from stones or lumps of soil.                                                       5.0 MULCHING                                                                                                           species and sizes outlined in the approved planting schedule. Plant densities to match the




                                                                                                                                                                                                                                                                                                                                                                       359°59'36"
                                                                                                                                                                                                                                                                                                                                                                                                                                 RL 43470


                                                                                                                                                                                                                                   approved planting plans at the time of handover.




                                                                                                                                                                                                                                                                                                                                                STREET
      § Graded to drain freely, without ponding or concentration of flows to catchment points.              5.1       General                                                                                                      Grassed areas
      § Graded evenly into adjoining ground surfaces.                                                             General: Organic Mulch shall be free from stones, soil, clay, dust, weeds, seeds, roots, sticks,
                                                                                                                                                                                                                                   Commence grass maintenance works at the completion of sowing, hydroseeding and turfing.                                                                                                       RL 43470



      § Ready for planting.                                                                                       rubbish, vermin, insects, pests, fungus, disease and other deleterious material. It shall be free                Maintain healthy weed free growth. Grass coverage must achieve at least 80% at the time of                                                                                   DP



                                                                                                                  from matter toxic to plant growth.
                                                                                                                                                                                                                                                                                                                                                                                                                                             RL 43290



      Topsoil depths                                                                                                                                                                                                               practical completion and 100% at the time of handover.                                                                                                 UP

                                                                                                                                                                                                                                                                                                                                                                                                                                                               UP                     179°58'36"




                                                                                                                                                                                                                                                                                                                                                ELANDA
                                                                                                                  Type: Mulch shall be Natramulch or Hoop Pine Fines                                                                                                                                                                                                                                            DP                            RL 43290                                3.138


      Planting areas generally: As specified otherwise 300mm.
                                                                                                            5.2       Organic Mulch Installation




                                                                                                                                                                                                                                                                                                                                                                       359°59'36"
      Grassed areas generally: As specified otherwise 150mm.                                                                                                                                                                                                                                                                                                                                                                     RL 43290




      Tree pits: As specified otherwise 800mm.                                                                    General: Place mulch to the required depth, clear of plant stems, and rake to an even surface
                                                                                                                  flush with the surrounding finished levels. Spread mulch to the specified thickness so that after
      Podium and containterized planters: As specified otherwise, 1000mm for small trees, 600mm
                                                                                                                  settling, it is smooth and evenly graded between design surface levels sloped towards the base                                                                                                                                                                                                                 RL 43290


      for medium to screening shrubs, and 300mm for small shrubs and ground covers.
                                                                                                                  of plant stems in plantation beds.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                              9"
                                                                                                                                                                                                                                                                                                                                                                                                                                                                         29'2
                                                                                                                                                                                                                                                                                                                                                                                                                            DP         DP                      UP




                                                                                                                                                                                                                                                                                                                                                                                                                                                                       197°
                                                                                                                                                                                                                                                                                                                                                                                               UP

                                                                                                                                                                                                                                                                                                                                                                                                                          RL 43290


                                                                                                                                                                                                                                                                                                                                                                                                                     269°56'38"




                                                                                                                                                                                                                                                                                                                                                                      GROUND FLOOR LANDSCAPING


                                                                                                                                                  PROJECT NAME                                                           CLIENT                                                                DRAWING                                            purpose:      COUNCIL APPROVAL                                                            sheet no:       COVER SHEET
                                                                                                                                                                                                                                                                                                                                                                                                                                            drawn:       dwg no:                                     issue:
                                                                       D          SL     03/08/22       RFI RESPONSE                                                                                                                                                                                                                              phase:        DETAILED DESIGN
                                                                                                                                                                                                                                                                                                                                                                                                                                             SL              2000902-CS01                                     D
                                                                       C          SL      21/12/21      RFI RESPONSE                                                                                                                                                                                                                               scale:
                                                                                                                                                                                                                                                                                                                                                                -                                                                           Use figured dimensions in preference to scale. All
                                                                       B          SL      08/10/21      COUNCIL APPROVAL                          65-67 ELANDA ST SUNSHINE BEACH                                         NULUXE PROPERTY GROUP                                                 REFERENCE PLAN                                     project no:
                                                                                                                                                                                                                                                                                                                                                                20-00902                                                                    dimensions to be verified on site prior to construction.
                                                                                                                                                  PROPOSED MULTI-DWELLING DEVELOPMENT                                    -                                                                     COVERSHEET                                                                                                                                   refer any discrepancies to project landscape architect.
                                                                       A          SL     10/09/21       CLIENT REVIEW                                                                                                                                                                                                                              date:        AUG 2022
                                                                                                                                                                                                                                                                                                                                                                                                                                 © Openspace Architecture 2022 abn 91 651 947 240
Log in to download the original file

LANDSCAPE.PDF · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.