Original source · versioned page text
2017-04-11 P&E Agenda Attachment 1 to Item 2 Proposal by Eco Camp
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Due to the location of the proposed infrastructure, the depth of water that relates to the designated area and the insignificant scale of the infrastructure; There will be no impediment on maritime navigation. There will be no impediment on any other recreational user group of the Lake ie: sailing, yachting and personal water craft use. There will be no impediment to any other commercial user group of the Lake. As Lake Cootharaba is unaffected by significant tidal range, the initial draft design for jetty infrastructure highlights a low scale, low height, fixed timber walkway extending from the foreshore to a floating section. There will be minimal visual impediment resulting from the installation of such infrastructure. The re-classification is required to enable the proponent to submit an application for resource allocation with the eventual intent of installing jetty infrastructure in this location to work in synergy with the Leased area and to fit in with the use of the Lease area, which is zoned for visitor facilities and services / tourism. Currently, and for the last 31 years the lessee operates a commercial tourism operation from the Leased land and utilises the foreshore and waterways for commercial marine activities. The current use and management of these activities can be vastly improved by the provision of infrastructure which will assist in minimising impacts in the FH zone and on the adjacent Leased land. Access to the subject area is well established. The proposed location is one which has strong planning merit within spatial based locality assessment. Located directly adjacent to the Lease area, existing camping grounds and public access national park it serves to improve the current poor accessibility into Lake Cootharaba that presently exists. The proposal does not require any associated infrastructure to be located within the declared Fish Habitat Area. The location is one that is entirely suitable as the required amenities, services, parking, etc. is all insitu, operational and located on land outside of the Habitat Area. At present there are no compliant disability access points to enable safe and equitable access to tour vessels, the jetty will be able to fulfil this gap with the proposed infrastructure. FRC Environmental, one of Australia’s most respected environmental consultants has undertaken extensive research and site field studies of the habitat adjacent to the Lease area as directed by DNPSR. FRC’s report scientifically supports the re-classification of the area, and installation of jetty infrastructure. This report will be presented to DNPSR in the final submission lodged for re-classification.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.