Our Ref: P20.52-001

7th December 2021

The Chief Executive Officer
Noosa Shire Council
9 Pelican Street
TEWANTIN QLD 4565
Via email: [email protected]

Attention : Patrick Murphy



Dear Patrick,

RESPONSE TO REQUEST FOR INFORMATION – MCU21/0083 AT 25 & 27 TOOLAR STREET,
TEWANTIN, QLD 4565

On behalf of the applicant, Riverport Properties Pty Ltd, I submit herewith the applicants’ response to
Council’s information request. Pursuant to section 13.2 of the Development Assessment Rules the
applicant is providing all of the information requested.

The following documentation is attached: -

          • Attachment 1 – Concept Stormwater Management Plan
          • Attachment 2 – Civil Engineer Response to RFI
          • Attachment 3 - Traffic Engineer Response to RFI
          • Attachment 4 – Amended Architectural Plans
          • Attachment 5 – Amended Landscape Architect Plans
          • Attachment 6 – Letter of Support from ANUHD
          • Attachment 7 – Letter of justification from Applicant/ Developer

Item 1 Information required

    1. Provide a site specific stormwater management plan for the proposed development. The plan
         must be prepared by a suitably qualified person and include but not be limited to:

             a. Stormwater collection, detention, retention and harvesting;

             b. A system that limits the discharge to predevelopment rates. Please note that any
                  system must assume that any reuse tanks are already full when determining
                  discharge rates;

             c.   Any proposed harvesting and reuse tanks that are to be plumbed for not-potable
                  purposes as described in the Sustainable Building Code;

             d. Connection to Council existing system. Please note that discharge to the kerb and
                  channel must not exceed 25 l/sec at any one location;

             e. Any necessary improvements to Council’s current infrastructure.

Concept Planning and Development Consultants ABN 99 789 542 467                                       1


[OCR of page images]
Our Ref: P20.52-001
7 December 2021

The Chief Executive Officer
Noosa Shire Council

9 Pelican Street
TEWANTIN QLD 4565

Via email: [email protected]

Attention : Patrick Murphy

Dear Patrick,

RESPONSE TO REQUEST FOR INFORMATION - MCU21/0083 AT 25 & 27 TOOLAR STREET,
TEWANTIN, QLD 4565

On behalf of the applicant, Riverport Properties Pty Ltd, | submit herewith the applicants’ response to
Council's information request. Pursuant to section 13.2 of the Development Assessment Rules the
applicant is providing all of the information requested.

The following documentation is attached: -

e Attachment 1 — Concept Stormwater Management Plan
e Attachment 2 — Civil Engineer Response to RFI

e Attachment 3 - Traffic Engineer Response to RFI

e Attachment 4 — Amended Architectural Plans

e Attachment 5 — Amended Landscape Architect Plans

e Attachment 6 — Letter of Support from ANUHD

e Attachment 7 — Letter of justification from Applicant/ Developer

Item 1 Information required

1. Provide a site specific stormwater management plan for the proposed development. The plan
must be prepared by a suitably qualified person and include but not be limited to:

a. Stormwater collection, detention, retention and harvesting;

b. A system that limits the discharge to predevelopment rates. Please note that any
system must assume that any reuse tanks are already full when determining
discharge rates;

c. Any proposed harvesting and reuse tanks that are to be plumbed for not-potable
purposes as described in the Sustainable Building Code;

d. Connection to Council existing system. Please note that discharge to the kerb and
channel must not exceed 25 I/sec at any one location;

e. Any necessary improvements to Council’s current infrastructure.

 

Concept Planning and Development Consultants ABN 99 789 542 467 1

Used in these records

About this file

File size
3.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to RFI - 25-27 Toolar St.pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.