Council archive · source document
Response to RFI - 25-27 Toolar St · MCU21/0083
Our Ref: P20.52-001 7th December 2021 The Chief Executive Officer Noosa Shire Council 9 Pelican Street TEWANTIN QLD 4565 Via email: [email protected] Attention : Patrick Murphy Dear Patrick, RESPONSE TO REQUEST FOR INFORMATION – MCU21/0083 AT 25 & 27 TOOLAR STREET, TEWANTIN, QLD 4565 On behalf of the applicant, Riverport Properties Pty Ltd, I submit herewith the applicants’ response to Council’s information request. Pursuant to section 13.2 of the Development Assessment Rules the applicant is providing all of the information requested. The following documentation is attached: - • Attachment 1 – Concept Stormwater Management Plan • Attachment 2 – Civil Engineer Response to RFI • Attachment 3 - Traffic Engineer Response to RFI • Attachment 4 – Amended Architectural Plans • Attachment 5 – Amended Landscape Architect Plans • Attachment 6 – Letter of Support from ANUHD • Attachment 7 – Letter of justification from Applicant/ Developer Item 1 Information required 1. Provide a site specific stormwater management plan for the proposed development. The plan must be prepared by a suitably qualified person and include but not be limited to: a. Stormwater collection, detention, retention and harvesting; b. A system that limits the discharge to predevelopment rates. Please note that any system must assume that any reuse tanks are already full when determining discharge rates; c. Any proposed harvesting and reuse tanks that are to be plumbed for not-potable purposes as described in the Sustainable Building Code; d. Connection to Council existing system. Please note that discharge to the kerb and channel must not exceed 25 l/sec at any one location; e. Any necessary improvements to Council’s current infrastructure. Concept Planning and Development Consultants ABN 99 789 542 467 1 [OCR of page images] Our Ref: P20.52-001 7 December 2021 The Chief Executive Officer Noosa Shire Council 9 Pelican Street TEWANTIN QLD 4565 Via email: [email protected] Attention : Patrick Murphy Dear Patrick, RESPONSE TO REQUEST FOR INFORMATION - MCU21/0083 AT 25 & 27 TOOLAR STREET, TEWANTIN, QLD 4565 On behalf of the applicant, Riverport Properties Pty Ltd, | submit herewith the applicants’ response to Council's information request. Pursuant to section 13.2 of the Development Assessment Rules the applicant is providing all of the information requested. The following documentation is attached: - e Attachment 1 — Concept Stormwater Management Plan e Attachment 2 — Civil Engineer Response to RFI e Attachment 3 - Traffic Engineer Response to RFI e Attachment 4 — Amended Architectural Plans e Attachment 5 — Amended Landscape Architect Plans e Attachment 6 — Letter of Support from ANUHD e Attachment 7 — Letter of justification from Applicant/ Developer Item 1 Information required 1. Provide a site specific stormwater management plan for the proposed development. The plan must be prepared by a suitably qualified person and include but not be limited to: a. Stormwater collection, detention, retention and harvesting; b. A system that limits the discharge to predevelopment rates. Please note that any system must assume that any reuse tanks are already full when determining discharge rates; c. Any proposed harvesting and reuse tanks that are to be plumbed for not-potable purposes as described in the Sustainable Building Code; d. Connection to Council existing system. Please note that discharge to the kerb and channel must not exceed 25 I/sec at any one location; e. Any necessary improvements to Council’s current infrastructure. Concept Planning and Development Consultants ABN 99 789 542 467 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to RFI - 25-27 Toolar St.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.