Council archive · source document
Attachment 5 - Arboricultural Impact Assessment · MCU22/0118
Consult Arborist 6 T REE AND S ITE A SSESSMENT To gain an accurate understanding of the treescape on the site a detailed tree survey was undertaken by Consult Arborist in February of 2022. Each tree was assessed from a ground level and its attributes and details were recorded along with a retention value score. The tree survey included the road reserve on the eastern side of the site and the koala tree species within the Noosa Council River reserve on the western side. Due to the high number of undesirable Umbrella trees across the site these were not recorded, to avoid distorting the data of the overall site assessed. It is intended to remove all the Umbrella trees as part of the site weed management. 6.1 T R EE S CHE DULE The information gathered relating to the plotted trees has been collated to provide data relating to the size and condition of the subject trees, this information can be found in Appendix 3 – Tree Schedule. This has also been provided as a separate workable Excel Spreadsheet ‘22_05_19_DATA_RACV_Dev 22_V4_RETREM’. Tree retention has been driven by high retention value status, largely due to them being a koala food source and habitat, and to create groups of trees that will be managed accordingly. A few of the larger older trees and trees directly adjacent to dwellings or infrastructure will be managed as individual specimens in their own entity and require additional management to be determined onsite by the Project Arborist. There will be a requirement to undertake canopy management to selected trees to assist with the tree’s suitability for retention within the project design. These works will be specified and overseen by the Project Arborist during the early stage of the site activities. Although an individual retention status has been awarded to each tree, there is still an overriding focus on the overall value to the collective treescape, this is reflected in the proposed methods of tree protection as the entire site is to be respected as a Tree Protection Zone. A Tree Removal and Retention Plan has been produced based on this information to provide an overview of the project treescape and vision. The plan outlines a number of trees where works are within a few meters of the tree, and these would normally be deemed for removal due to the TPZ conflict; these trees have been marked in “Blue - trees subject to development impact and retained/managed where possible” on the plans. It is intended that every effort will be made to retain these trees, with work activities adjusted where possible to accommodate them. Additional management by the Project Arborist and construction contractor will work towards their retention, however, there is the possibility that ultimately their removal will be required. 22_06_13_AIA_Aspect_RACV Noosa Eco_V1 Page 10 of 53
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Arboricultural Impact Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.