8 T REE P RO TECT ION P LAN
With the entire site being considered a Tree Protection Zone, protection measures are to be
put in place across the site. All site attendees are to be made aware of this plan prior to
commencing work.

The information below is guided by the AS4970-2009 Protection of trees on development sites
and is designed to provide direction and information regarding the tree protection
requirements. This advice is subject to change due to site conditions and the Project Arborist
will advise of the best practices required onsite when the necessary site requirements have
been confirmed.

8.1 T HE R OLE O F THE P R OJ ECT A R BOR IST AND TPP
A site tree survey and the site configuration, with an assessment of the trees, has been
undertaken including the trees which require further consideration.

The information within this Tree Protection Plan (TPP) can be used in conjunction with
guidelines laid out in the Australian Standard, AS4970–2009 Protection of Trees on
Development Sites and ongoing advice from the Project Arborist.

8.1.1 P RE -C O N STRUCTIO N

The details of the locations of the trees and required works recorded in the Tree Schedule are
used in this Tree Protection Plan.

A designated onsite foreman/supervisor from the construction company is to liaise with Project
Arborist to ensure that the Tree Protection Plan is adhered to in his absence from the site.

Prior to any works commencing on the site, the Exclusion Zones shall be established as
guided by the Australian Standard, AS 4970–2009. The location of fencing/flagging is to be
agreed with Project Arborist and will follow guidelines set out in 9.3 Tree Protection.

The creation of dedicated and delineated access pathways for the construction equipment and
materials are to be established and mulched 200-300mm in depth to protect the ground from
compaction. On completion of the project, the mulch can be carefully spread by hand and
used within the landscaping.

Additional protection measures, including ground and trunk protection, are to be used where
deemed necessary as the project progresses.

ALL workers on the site are to be made aware of the Tree Protection Plan by the main
contractor prior to commencing works.




22_06_13_AIA_Aspect_RACV Noosa Eco_V1                                             Page 16 of 53

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Arboricultural Impact Assessment.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.