MCE Stormwater Management Assessment · MCU13/0215
Attached to the e-mail MCU13/0215.01 - Request to Change Existing Approval - Increase from 5 to 7 units.
Our Ref: 15104/rp
Friday, 7 August 2015
Noosa Council
PO Box 141
Tewantin QLD 4565
RE: Stormwater Management Assessment
Proposed Residential Development at 43 Elanda Street, Sunshine Beach
As supporting documentation to the Development Application for the above mentioned
development we have completed an assessment of the stormwater management
requirements for the property and can confirm the following:
The development can implement a stormwater drainage system and convey stormwater to a
lawful point of discharge. The lawful point of discharge will be located at the rear of the
property through adjoining downstream properties with some gravity drainage provided to
Eland Street (if achievable). Stormwater runoff from the site will be managed with a
drainage system that is designed in accordance with the relevant sections of QUDM and
Noosa Council’s Planning Scheme and will ultimately be directed to the stormwater
infrastructure within Duke Street.
In order to maintain pre-development peak flow conditions an on-site detention system will
be implemented. The on-site detention system will capture runoff from the roof catchment
and exposed hardstand areas before mitigating the outflow and discharging stormwater via
the legal point of discharge.
The on-site detention system will ensure that pre-development peak flow rates for the total
site area are maintained for storm events up to and including the 20 year ARI storm event.
Furthermore, the incorporation of the on-site detention system and piped drainage system
will ensure that surface flows onto the adjoining properties along Duke Street will not be
increased as a result of development for storm events up to and including the 100 year ARI
storm event.
A stormwater quality management system will be incorporated on site and will utilise Best
Management Practices. Stormwater runoff from the car park and driveway areas will be
treated by a grease/oil arrestor/gross pollutant trap prior to being discharged into the
aforementioned drainage system.
The on-site detention system and all components of the stormwater quality management
system will be maintained periodically. Details of the associated maintenance schedules will
be provided during detailed design.
The drainage system will be constructed in accordance with a design prepared and certified
by a suitably qualified and experienced registered professional in accordance with an
Operational Works application approval.
D:\JOBS\15-Jobs\15104 - 43 Elanda Street, Sunshine Beach\Civil\Correspondence\Letters\15104 - MCE Stormwater Management
Assessment_150807.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
MORGAN CONSULTING
E NGINEERS P TY LTD
15104/rp
Page 2
Based on the above assessment we can confirm that the stormwater management for this
property will not preclude this development from being approved.
Please contact me if you have any further queries on (07) 3369 8411.
Yours faithfully,
MORGAN CONSULTING ENGINEERS PTY LTD
Henry Morgan
Director RPEQ 11950
Used in these records
MCE Stormwater Management Assessment.pdfRelated documentApplication case desk ↗
MCE Stormwater Management Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 168 KB (small file)
- File type
No other editions are linked here.