16-001014-01A (Swmp)

Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Cooroy Retirement Community, Trading Post Road, Cooroy
                      Stormwater Management Plan (SWMP)
                                       Prepared by Calibre Consulting
                                      Prepared for Palm Lake Resorts

                                                    September 2016


                                                       16-001014-01A
                                                               Original
                                                  Water & Environment
Log in to download the original file

16-001014-01A (SWMP).pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 79 pages

Page 2

COMMERCIAL IN CONFIDENCE

All intellectual property rights, including copyright, in Calibre Consulting

designs developed and documents created by Calibre Ground Floor, 545 Queen Street
Consulting (Qid) Pty Ltd remain the property of this BRISBANE QLD 4000

company. Any use made of such design or document

without the prior written approval of Calibre Consulting

(Qld) Pty Ltd will constitute an infringement of the rights of Ph: (07) 3895 3444

the company which reserves all legal rights and remedies © 2016

in respect of any such infringement

The information, including any intellectual property,
contained in this proposal is confidential and proprietary to
the Company. It may only be used by the person to whom
it is provided for the stated purpose for which it is provided
and must not be imparted to any third person without the
prior written approval of the Company. The Company
reserves all legal rights and remedies in relation to any
infringement of its rights in respect of its confidential
information

DOCUMENT CONTROL
16-001014-01
Issue | Date Issue Details Checked Approved

12/08/16 For Council Approval eee CM MS RPEQ 9485

 

Page 3

TABLE OF CONTENTS
1   INTRODUCTION ............................................................................................................... 1
    1.1      Scope of this report ................................................................................................. 2
    1.2      Previous Documentation ......................................................................................... 2
    1.3      Response to Approval Conditions ........................................................................... 3
2   SITE CHARACTERISTICS ................................................................................................ 5
    2.1      Location .................................................................................................................. 5
    2.2      Topography and Site Drainage ............................................................................... 6
    2.3      Site Discharge locations ......................................................................................... 6
3   PEAK FLOW INVESTIGATION ......................................................................................... 7
    3.1      Existing Scenario .................................................................................................... 7
             3.1.1    Catchment Characteristics ........................................................................ 7
             3.1.2    Infiltration Loss & Lag Parameters ............................................................ 8
             3.1.3    Channel Routing ........................................................................................ 8
             3.1.4    Rainfall Data .............................................................................................. 8
             3.1.5    Existing Peaks Flow .................................................................................. 8
             3.1.6    Model Verification Check - Rational Method ............................................. 9
    3.2      Developed Mitigated Scenario ................................................................................ 9
             3.2.1    Catchment Characteristics ........................................................................ 9
             3.2.2    Infiltration Loss & Lag Parameters .......................................................... 10
             3.2.3    Channel Routing ...................................................................................... 10
             3.2.4    Rainfall Data ............................................................................................ 10
             3.2.5    Proposed Mitigation Strategy .................................................................. 10
             3.2.6    Developed Mitigated Peaks Flow Results ............................................... 12
             3.2.7    Extreme Event Sensitivity Check ............................................................. 13
             3.2.8    Internal Drainage Strategy ....................................................................... 14
4   STORMWATER QUALITY .............................................................................................. 15
    4.1      Pollutants of Concern ............................................................................................ 15
    4.2      Water Quality Objectives ...................................................................................... 15
    4.3      Stormwater Quality Management Strategy ........................................................... 15
             4.3.1   Utilised Treatment Systems ..................................................................... 16
             4.3.2   Proposed End-of-Line Systems ............................................................... 16
    4.4      MUSIC Modelling .................................................................................................. 17
             4.4.1   Meteorological Data ................................................................................. 18
             4.4.2   Source Nodes .......................................................................................... 18
             4.4.3   Primary and Secondary Drainage Links .................................................. 18
             4.4.4   Treatment Nodes ..................................................................................... 19
    4.5      MUSIC Modelling Results ..................................................................................... 21
5   WATERWAY STABILITY MANAGEMENT ...................................................................... 21
6   CONCLUSION ................................................................................................................. 22
7   RECOMMENDATIONS ................................................................................................... 22
8   DISCLAIMER ................................................................................................................... 23
9   REFERENCES ................................................................................................................ 23

Page 4

TABLES

Table 1-1: Summary of Responses to Approval Conditions Relating to Stormwater
            Management ........................................................................................................ 3
Table 3-1: Existing Scenario Catchment Details ................................................................... 7
Table 3-2: XP-RAFTS Calibration Parameter Summary ....................................................... 8
Table 3-3: Existing Peak Flow Results .................................................................................. 8
Table 3-4: Existing Peak Flow Comparison at Discharge Location B ................................... 9
Table 3-5: Developed Mitigated Scenario Catchment Details ............................................... 9
Table 3-6: Stormwater Detention Basin Concept Details .................................................... 11
Table 3-7: Northern Basin Stage Storage Discharge Relationship ..................................... 11
Table 3-8: Central Basin Stage Storage Discharge Relationship ........................................ 12
Table 3-9: Developed Mitigated Scenario Peak Flow Comparison ..................................... 12
Table 3-10: Developed Mitigated Scenario Basin Water Surface Levels .............................. 13
Table 3-11: Extreme Storm Event Weir Assessment ............................................................ 13
Table 4-1: Load Reduction Water Quality Objectives .......................................................... 15
Table 4-3: Bioretention Basin Modelled Parameters ........................................................... 19
Table 4-4: Pond Node Configuration ................................................................................... 20
Table 4-5: 20th Percentile Hydraulic Residence Time Results (Simplistic Approach) ......... 20
Table 4-6: MUSIC Modelling Results .................................................................................. 21



FIGURES

Figure 2-1:       Approximate Location of Site (Source: UBD 2006) .............................................. 5



APPENDICES

APPENDIX A               CONCEPT MASTERPLAN LAYOUT
APPENDIX B               RATIONAL METHOD CALCULATION
APPENDIX C               DETENTION BASIN CALCULATIONS
APPENDIX D               XP-RAFTS LAYOUT SUMMARY
APPENDIX E               STORMWATER DESIGN CALCULATIONS
APPENDIX F               MUSIC MODELLING DETAILS
APPENDIX G               CONCEPT DRAWINGS
APPENDIX H               OPERATIONAL WORKS DRAWINGS

Page 5

1         INTRODUCTION
Calibre Consulting (QLD) Pty Ltd has been commissioned by Palm Lake Resort to prepare a Stormwater Management
Plan (SWMP) to support the Operational Works Application for Stage 2 and subsequent stages of the Palm Lakes
Retirement Community. The development is located on 2 & 4 Lamonts Road and 19 & 20 Trading Post Road Cooroy,
within the Noosa Shire Council (NSC) Local Government Area. This Operational Works submission follows the MCU
Development Approval (MCU 15/0111 & REC15/0031) for the site.

This project has an extensive history, involving an interim reduced site layout (excludes property on 20 Trading Post
Road/Lot 4 on RP215922), numerous submissions to and correspondence with Council to achieve approval of the
stormwater management strategy. The following outlines the key submissions and milestones achieved. Further
references to past documentation are provided in Section 1.2.

   MCU Development Approval for Reduced Site Layout - Calibre Consulting previously provided a Concept
    Stormwater Management Report (No. B07056.W-02A dated June 2008) for the MCU application and Concept
    Stormwater Quality Management Plan Report (No. B14158.W-01A dated December 2014) for the Change to an
    Existing Approval application. The stormwater management strategy (involving two Bioretention Basins, a
    Constructed Wetland and Water Quality Control Pond with integrated detention storage) outlined in these reports
    were subsequently approved by Council.

   Operational Works – Bulk Earthworks Decision Notice Approval for Reduced Site Layout - Following various letter
    submissions of stormwater construction management and maintenance details (refer to Section 1.2 below), Council
    issued an Operational Works - Bulk Earthworks Decision Notice Approval (dated 15 October 2015) for the Palm
    Lakes development. In the process of gaining approvals, a framework for the SMCMP Report (incorporating design
    checklists, construction and operation maintenance) was developed with Council and approved. This was
    documented in Letter Report (No. B14158.W.07L dated 8 October 2015).

   Operational Works – Internal Stormwater and Drainage Works Approval for Stage 1A of the Reduced Site Layout –
    Calibre Consulting provided Stormwater Management Plan Report No. B14158.W-05B dated December 2015 and
    Stormwater Management Construction & Maintenance Plan (SMCMP) Report No. B14158.W-06A dated November
    2015 was issued to Council. Following various requests for information and responses from Calibre Consulting
    regarding stormwater management (refer to Section 1.2 for references for this documentation), Council granted
    approval for Internal Stormwater and Drainage Works in Stage 1A.

   MCU Development Approval for Overall Site Layout – During the above processes for gaining approvals for the
    reduced site layout, a MCU Development Application (MCU 15/0111 & REC15/0031) was submitted for the overall
    site layout (including the property on 20 Trading Post Road/Lot 4 on RP215922). A revised stormwater management
    strategy (involving three major Bioretention Basins, one small Bioretention Pod, a Central Water Quality Control
    Pond with central and northern integrated detention systems) was developed based on the previous approved
    strategy for the reduced site layout. This was documented in the Concept Stormwater Management Plan Report (No.
    B14158.W-03A dated November 2015). Following various requests for information (RFI’s) and responses from
    Calibre Consulting, Council granted MCU & REC approvals in Decision Notice (dated 22 July 2016) with conditions
    of approval.

This report has been provided to support the Operational Works Approval for Stage 2 and subsequent stages of the
overall site layout by demonstrating compliance with the approved Concept SWMP (No. B14158.W-03A dated November
2015) and by addressing Council’s Decision Notice approval conditions. The following documents have also been
provided to Council together with this submission and should be read in conjunction with this report:

   Response to Stormwater Management Approval Conditions Letter (No. 16-001014.01L.ms.cm.docx dated 12
    September 2016) – provides a summary of responses to Council’s Approval Conditions regarding stormwater
    management.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                         ROAD, COOROY                |1

Page 6

   Stormwater Management Construction & Maintenance Plan (SMCMP) Report (No. 16-001014-02A dated September
    2016) – provides design checklists, construction management and operation maintenance procedures for proposed
    stormwater devices.

The design, management and maintenance procedures for stormwater management devices detailed in these
documents, also address previous concerns from Council and are in accordance with past approvals.

This report provides details on peak flow, stormwater quality and water stability management to demonstrate compliance
with the relevant local and state guidelines and Council’s requirements. The site development layout is generally in
accordance with the approved layout and the stormwater management strategies remains consistent with previously
approved documentation.

1.1       SCOPE OF THIS REPORT
The scope of this report includes the following:

   Peak flow (or hydrological) analysis using XP-RAFTS software to determine existing peak flows and developed
    mitigated peak flows from the site, to ensure no adverse impact as a result of the development;
   Stormwater quality analysis using MUSIC software to determine the adequacy of the proposed SQIDs to meet the
    Water Quality Objectives (WQO’s) required under the State Planning Policy (SPP, 2014); and
   Management of Waterway Stability required under SPP (2014).

While a flood investigation has not been undertaken in this report, it is noted that flood information was previously
provided to Council in Letter No. B14158.W.10LA.AMcP.ms.docx dated 21 April 2016. This document demonstrated no
loss of regional floodplain storage and therefore no increase in the severity of flooding or interference with the existing
watercourse. The peak flow investigation and internal drainage strategy detailed in Section 3.2 demonstrates no
worsening in peak flows discharging from the site, also demonstrating that the development will not adversely impact
flood conditions downstream. Since the site strategy is generally in accordance with concept designs previously provided
to Council (i.e. earthworks, drainage and stormwater management solutions) the above outcomes are maintained.

1.2       PREVIOUS DOCUMENTATION
The following documentation has been previously prepared by Calibre Consulting (Qld) for the Cooroy Retirement
Community development:

Reduced Site Layout - MCU Development Application
 Concept Stormwater Management Report (No. B07056.W-02A dated June 2008) – in support of the DA;
 Concept Stormwater Quality Management Plan (SWQMP) Report (No. B14158.W-01A dated December 2014) in
   support of the permissible change application;

Reduced Site Layout – Bulk Earthworks Approval
 Stormwater Management Construction and Maintenance Plan (SMCMP) Report (No. B14158.W-04A dated
   September 2015) – in support of the Operational Works - Bulk Earthworks Application; and
 Framework Letter Report (No. B14158.W.07L dated 8 October 2015) – Addressing Council’s Change to Existing
   Approval Condition Item 72 (dated 2 March 2015).

Reduced Site Layout - Stage 1A Operational Works Application
 Stormwater Management Plan (SWMP) Report (No. B14158.W-05B dated 2015);
 Stormwater Management Construction and Maintenance Plan (SMCMP) Report (No. B14158.W-06A dated
   November 2015);
 Response to Information Request Letter No. B14158.W-11A dated 22 April 2016; and
 Queries Clarification Letter (No. B14158.W.14 RFI.AMcP.lms Response to RFI.docx dated 6 June 2016) –
   Addressing Council Officer Cherie O’Sullivan’s further queries in email dated 27 May 2016.


16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                 COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                          ROAD, COOROY                 |2

Page 7

Overall Site Layout - MCU Development Application
 Concept Stormwater Management Plan Report (No. B14158.W-03A dated November 2015);
 Concept Stormwater Management Construction and Maintenance Plan (Concept SMCMP) Report (No. B14158.W-
   09A dated January 2016)
 Response to Information Request Letter No. B14158.W.10A-Response to RFI.docx dated 5 February 2016.
 Outstanding Information Request Response Letter No. B14158.W.10LA.AMcP.ms.docx dated 21 April 2016.

The above reports have been considered in the latest analysis.



1.3      RESPONSE TO APPROVAL CONDITIONS
A summary of the responses to Council’s Approval Conditions relating to stormwater management are provided in
Table 1-1 below. Some responses have been addressed in other submissions, such as the SMCMP Report
(No. 16-001014-02A dated September 2016).

Table 1-1: Summary of Responses to Approval Conditions Relating to Stormwater Management
 Item    Brief Summary of Item                      Response to Item
 59      Adequate flood immunity maintained         Design of roadworks and drainage network throughout the site ensures
         during local and regional events.          adequate management of local flows. Refer to Roadworks and
                                                    Drainage Plans. Section 3.2.6 in this report indicates basin water
                                                    surface levels provide adequate freeboard to allotment levels.
                                                    Section 1.1 in this report provides details of regional flood levels below
                                                    developed lots.
 60      Site earthworks does not adversely         Section 1.1 in this report provides details of regional flood levels
         impact flood conditions on adjacent or      and site filling well outside of regional flood extents.
         downstream properties                      Furthermore, Section 3.2.6 indicates a reduction of peak flows back to
                                                    or below existing levels discharging from the site, which demonstrates
                                                    no adverse impact to flooding downstream.
 61      Design of stormwater drainage and          Stormwater drainage and basin detailed design drawings have been
         management devices to be certified by      certified by RPEQ. Refer to Drawing No. 16-001014-400 series for
         RPEQ specialising in hydraulics.           details.
 62      Minor Drainage System Capacity – 10%       Stage 2 Operational Works drainage has been designed accordingly.
         AEP storm, Major Drainage System           Refer to Stage 2 Operational Works Design Package for details. Future
         Capacity – 1% AEP storm                    stages will also be designed accordingly. Details are also provided in
                                                    Section 3.2.8 of this report.
 63      No adverse impact to downstream peak       Section 3.2.6 in this report demonstrates that proposed detention
         flows up to and including the 1% AEP       basins are adequate in reducing peak flows to meet this requirement.
         Storm
 64      Demonstrate the Stormwater Quality         Section 4 in this report provides stormwater quality analysis, outlining
         Management Strategy meets Water            the proposed Stormwater Quality Management Strategy, which
         Quality Objectives as per the SPP, 2014.   demonstrates compliance with WQO’s for the site. Discussion of the
                                                    treatment of external catchment runoff and modelling methodology is
                                                    provided in Section 4.
 65.1    Letter from Water By Design or eWater      In the proposed modelling (refer to Section 4 in this report), there has
         where MUSIC modelling deviates from        been no deviation from specifications provided in the MUSIC Modelling
         MUSIC Modelling Guidelines (2010).         Guidelines (2010). Therefore, a letter is not required. As per previous
                                                    correspondence with Council, the pond node has not been modelled in
                                                    MUSIC. This is a conservative assumption considering that the pond
                                                    will capture suspended solids through a process of sedimentation and
                                                    provide some reduction of nutrients.
 65.2    Contingency plan with costs to be          A contingency plan has been provided in Appendix A of the SMCMP
         provided to Council. Stormwater runoff     Report. Stormwater runoff is to receive primary treatment from
         from roads and car parking areas to be     proprietary GPT’s that can remove grease and oil, and tertiary
         pre-treated for grease and oil.            treatment from Bioretention Basins before discharge into the Pond.
                                                    Note that all areas likely to generate significant amounts of grease and



16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                 COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                          ROAD, COOROY                        |3

Page 8

 Item   Brief Summary of Item                       Response to Item
                                                    oil will be pre-treated by GPT’s. Since the catchment to the Northern
                                                    Bioretention Basin is smaller than 5ha and does not contain significant
                                                    areas of car parking or road, a sediment forebay is proposed.
 66     Stormwater Quality Treatment Devices to     Bioretention Basins and the Pond have been designed accordingly.
        be designed in accordance with Healthy      Details are provided in Section 2.1 and Section 3.1 of the SMCMP
        Waterway and Water By Design                Report.
        guidelines.
 67     Stormwater design and maintenance           The criteria and framework for design, construction and operational
        strategy in accordance with Council’s       maintenance for stormwater devices is in accordance with the
        approved Framework Letter Report (No.       Framework Letter Report approved by Council. Refer to the SMCMP
        B14158.W.07L dated 8 October 2015)          Report for details.
 68     The SMCMP Report to be in accordance        The SMCMP Report has been written in accordance with this approved
        with Council’s approved Framework           document.
        Letter Report (No. B14158.W.07L dated
        8 October 2015)
 69     Owner responsibility for construction,      This condition is stipulated in this report.
        maintenance and repair costs of
        stormwater management devices.
 70     Calculations to demonstrate runoff to       Energy dissipaters (i.e. rock scour protection) have been provided at
        northern swale within the site will not     drainage outlets into the northern site swale. Energy Dissipation
        cause scour.                                Calculations and Manning’s Sections (comparing existing and
                                                    developed conditions of the swale) are provided in Appendix A of the
                                                    SMCMP Report.
 71     Any waters captured to be plumbed and       The capture of all water for external uses was not proposed as part
        used for external or non-potable uses.      of the previously approved MCU submission. The capture of all
                                                    water on site is not required for the site to meet both Stormwater
                                                    Quality and Quantity Objectives to be achieved and is therefore not
                                                    proposed or required.
 72     Developed peak flows from the site          As per response to Condition 63, Section 3.2.6 of this report
        during the 63% AEP storm event to be        demonstrates that proposed detention basins are adequate in reducing
        reduced back to or below existing levels.   peak flows to meet this condition.
 73     Performance bond to be provided to          Monitoring and maintenance costs are detailed in Appendix A of the
        Council equivalent to 150% of the value     SMCMP Report. A performance bond will be provided to Council for the
        of monitoring and maintenance of the        first 5 years of full operation of the pond.
        water bodies.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                 COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                          ROAD, COOROY                     |4

Page 9

2         SITE CHARACTERISTICS
2.1       LOCATION
The 15.83ha development site is located on four existing properties in the NSC local government area. The site is
bounded by Trading Post Road and rural zoned area (Noosa Plan, 2013) to the east, rural zoned area to the north,
Pearson’s Rd to the south and Cooroy Connection Road (Elm Street) to the west. The property description are:

   1/RP215922 - 19 Trading Post Road;
   4/RP215922 - 20 Trading Post Road;
   2/RP165418 - 4 Lamonts Road, Cooroy; and
   1/RP165418 - 2 Lamonts Road, Cooroy.

Figure 2.1 below indicates the approximate location of the site.



                                                                       SITE




        COOROY CONNECTION ROAD




                             Figure 2-1:   Approximate Location of Site (Source: UBD 2006)




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                   COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                            ROAD, COOROY         |5

Page 10

2.2       TOPOGRAPHY AND SITE DRAINAGE
The majority of the site falls from its western boundary (Cooroy Connection Road) to the eastern boundary (Trading Post
Road). There are two existing gullies traversing the site which discharge to two separate existing dams (central and
southern). These two dams then join to a larger “combined” dam downstream on property Lot 4RP215922. The
“combined” dam then discharges to an existing swale along the north-eastern boundary of the Lot before discharging to
the lawful point of discharge (Central Discharge Point B). There are two external catchments discharging to the site from
Cooroy Connection Road via two existing box culverts below the road.

To the north of the site a smaller catchment discharges to the existing northern dam before discharging downstream
(Northern Discharge Point A).

The highest point on the site is near the intersection of Cooroy Connection Road and Pearsons Road at RL 111 m AHD.
The lowest point at the eastern corner of the site at the base of an existing swale is approximately at RL 97 m AHD
adjacent to Central Discharge Point B. The average grade of the central gully is approximately 2% and the southern gully
is approximately 4%, as measured from the western boundary to the eastern boundary.

Refer to Drawing No. B14158.W-SK100 in Appendix G for existing stormwater catchments, existing gullies and dam
locations.

2.3       SITE DISCHARGE LOCATIONS
The site has two main discharge locations as detailed below:

   Northern Discharge Point A – A small portion of the site to the north and external catchment (approximately 2.4ha)
    is directed towards the northern boundary.
   Central Discharge Point B – A large portion of the site and external catchment (approximately 16.2ha) is directed to
    the west via an existing swale located within the site.

Refer to Drawing No. B14158.W-SK100 in Appendix G for discharge locations.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                         ROAD, COOROY                |6

Page 11

3        PEAK FLOW INVESTIGATION
Hydrological analysis using XP-RAFTS was undertaken to demonstrate that the development of the site with mitigation
measures would not result in adverse impact downstream. The methodology undertaken in this analysis is consistent with
the past approvals. The following scenarios were undertaken in this analysis.

   Existing Scenario represents the hydrology for the catchment under existing conditions. Catchment parameters (i.e.
    infiltration loss and lag parameter values) were adopted as per Water Technology’s Cooroy Flood Study (Report No.
    J2835-01_R02v01 dated 26 July 2013) which is the adopted hydrological modelling for the area and was prepared
    specifically for the Sunshine Coast Regional Council. The report and corresponding models were supplied by Noosa
    Shire Council.

    Peak flow results determined in this scenario were compared with developed peak flow results to assess the change
    in peak flows at site discharge locations.

   Developed Mitigated Scenario represents the hydrology for the catchment under proposed development conditions
    with mitigation. This scenario was undertaken to determine the adequacy of the proposed mitigation measures to
    reduce peak flows back to or below existing conditions, therefore demonstrate no adverse impact.

The Existing and Developed Mitigated Scenario were modelled using the computer package XP-RAFTS. XP-RAFTS
analysis enables the hydrological modelling of the site for numerous design storm events and land uses. The subsequent
sections indicates the various assumptions and procedures used in developing each XP-RAFTS model.

3.1      EXISTING SCENARIO
The Existing Scenario was undertaken to determine peak flows discharging from the site under existing conditions.

3.1.1    CATCHMENT CHARACTERISTICS

Existing Catchments were delineated based on existing survey and aerial information. Existing catchments provided are
in accordance with the Concept SWMP Report (No. B14158.W-03A dated November 2015), only the Fraction impervious
value for Catchment D1 (Trading Post Road) has been updated to reflect the latest survey information. Catchments were
also split into various sub-catchments for modelling purposes. Fraction impervious values have been determined using
detailed survey and aerial information. Vectored slope has also been measured from the survey.

A summary of the existing catchment details are provided in Table 3-1 below.

                                   Table 3-1:   Existing Scenario Catchment Details
                                            Downstream           Sub-
         Overall               Sub-                                             Fraction
                                                Sub-          Catchment                      Vectored Slope (%)
        Catchment           catchment                                          Impervious
                                             Catchment         Area (ha)
      Northern            A1               A2                    0.78             0.12              0.7%
                          A2               A_OUTLET              1.62             0.10              2.9%
      Central             B1               B2                    1.38             0.23              1.7%
                          B2               B3                    3.66             0.01              2.5%
                          B3               B4                    2.32             0.03              7.1%
                          B4               D2                    0.55             0.25              4.0%
      South               C1               C2                    0.93             0.32              0.8%
                          C2               C3                    5.14             0.02              2.6%
                          C3               D                     0.64             0.00              6.0%
      Central & South     D1               D2                    0.35             0.44              4.4%
                          D2               D_OUTLET              1.20             0.09              4.0%



16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)               COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                        ROAD, COOROY              |7

Page 12

3.1.2     INFILTRATION LOSS & LAG PARAMETERS

Infiltration Loss and Lag Parameter values were adopted as per Water Technology’s Cooroy Flood Study (Report No.
J2835-01_R02v01 dated 26 July 2013), which covers the Cooroy region and site area. A parameter summary is provide
in Table 3-2 below.

                                 Table 3-2:   XP-RAFTS Calibration Parameter Summary

                     XP-RAFTS Model Parameter                      Value From Cooroy Flood Study

              Storage multiplication co-efficient Bx                                1

              Pervious Initial Rainfall Loss (mm)                                   10

              Pervious Continuing Rainfall Loss (mm/hr)                             2.5



Impervious Initial and Continuing Loss values were conservatively assumed as 0mm.

3.1.3     CHANNEL ROUTING

Channel Routing (XP-RAFTS Link Routing) was modelled as per Water Technology Cooroy Flood Study (2013). The ‘k’
lag values were determined directly based on flowpath length and average channel velocity of 0.9m/s for natural overland
flowpaths and 2.0m/s for runoff conveyed through drainage or road network. A constant ‘x’ coefficient of 0.2 was adopted
as per the Cooroy Flood Study (2013).

3.1.4     RAINFALL DATA

Rainfall data was generated based on rainfall IFD parameters provided by Water Technology’s Cooroy Flood Study
(Report No. J2835-01_R02v01 dated 26 July 2013) for the Cooroy Region.

3.1.5     EXISTING PEAKS FLOW

Modelling was undertaken for the all recurrence interval storm events up to and including the 100-year ARI storm event
with storm durations ranging from 30 to 120 minutes (these were considered the critical durations). Peak flow results for
the Existing Scenario have been provided in Table 3-3 below at the site discharge locations (i.e. Discharge Location A
and B as discussed in Section 2.3).

                                         Table 3-3:    Existing Peak Flow Results
                                        Peak Flow at Discharge         Peak Flow at Discharge
                           AEP
                                        Location A North (m3/s)       Location B Central (m3/s)
                           63%                   0.17                           1.14
                           39%                   0.26                           1.71
                           18%                   0.36                           2.54
                           10%                   0.43                           3.02
                           5%                    0.55                           3.69
                           2%                    0.66                           4.28
                           1%                    0.77                           4.95




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                         ROAD, COOROY                    |8

Page 13

3.1.6     MODEL VERIFICATION CHECK - RATIONAL METHOD

A verification check of the XP-RAFTS model was undertaken by comparing model generated peak flows with Rational
Method calculations. A Rational Method calculation was undertaken for the overall catchment to Discharge Location B.
Refer to Appendix B for Rational Method details. A comparison is provided in Table 3-4 below.

                         Table 3-4:   Existing Peak Flow Comparison at Discharge Location B
                                          Rational Method     XP-RAFTS Peak            Difference
                             AEP
                                          Peak Flow (m3/s)      Flow (m3/s)                (%)
                             63%                1.32               1.14                   -14%
                             39%                1.80               1.71                    -5%
                             18%                2.55               2.54                     0%
                             10%                2.96               3.02                     2%
                             5%                 3.69               3.69                     0%
                             2%                 4.82               4.28                   -11%
                             1%                 5.27               4.95                    -6%


As indicated in the table above, XP-RAFTS peak flows vary from QRM, but are generally lower than the QRM peak flows.
The average variance is 5%. Therefore the model parameters adopted from the council report in Section 3.1.2 are
considered appropriate.

3.2       DEVELOPED MITIGATED SCENARIO
The Developed Mitigated Scenario was undertaken to demonstrate no adverse impact as a result of the proposed
mitigation measures.

3.2.1     CATCHMENT CHARACTERISTICS

Developed catchments were delineated and split based on preliminary earthworks. A Fraction Impervious value of 70%
was adopted for all sub-catchment areas as per the Concept SWMP Report (No. B14158.W-03A dated November 2015).
Catchment details have been updated to reflect minor changes undertaken during detailed design. The vectored slope
remains consistent with the corresponding existing catchment, as no significant changes under developed conditions
were expected. A summary of the developed catchment details are provided in Table 3.5 below.

                             Table 3-5:    Developed Mitigated Scenario Catchment Details
                                            Downstream          Sub-
          Overall            Sub-                                            Fraction
                                                Sub-         Catchment                       Vectored Slope (%)
         Catchment        catchment                                         Impervious
                                             Catchment        Area (ha)
        North           A1                 A2                   0.98            0.70                0.7%
                        A2                 A_OUTLET             1.51            0.70                2.9%
        Central         B1                 B2                   2.13            0.15                1.7%
                        B2                 B3                   2.38            0.70                2.5%
                        B3                 B4                   2.06            0.70                7.1%
                        B4                 D                    1.05            0.38                4.0%
        South           C1                 C2                   1.32            0.22                0.8%
                        C2                 C2                   2.02            0.80                2.6%
                        C3                 D                    2.93            0.70                6.0%
        Central &       D1                 D2                   0.27            0.63                4.4%
        South           D2                 D_OUTLET             1.25            0.70                4.0%
                        D3                 D_OUTLET             0.58            0.70                4.0%



16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)              COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                       ROAD, COOROY                 |9

Page 14

3.2.2     INFILTRATION LOSS & LAG PARAMETERS

The same Infiltration Loss and Lag Parameter values were adopted as per the Existing Scenario (refer to Section 3.1.2),
which are consistent with Water Technology’s Cooroy Flood Study.

3.2.3     CHANNEL ROUTING

Channel Routing (XP-RAFTS Link Routing) was modelled as per Water Technology’s Cooroy Flood Study (2013), by
determining ‘k’ lag values based on flowpath lengths and average channel velocities, with a constant ‘x’ coefficient of 0.2.
Refer to Section 3.1.3 for details.

3.2.4     RAINFALL DATA

Rainfall data was generated as per the Existing Scenario in Section 3.1.4.

3.2.5     PROPOSED MITIGATION STRATEGY

The following detention basins (incorporated with stormwater quality treatment) are proposed as part of the stormwater
mitigation strategy to reduce peak flows back to or below existing levels. This is consistent with the Concept SWMP
Report (No. B14158.W-03A dated November 2015) and other past approved documentation.

   Northern Basin consists of a combined bioretention and detention basin to mitigate peak flows from the northern
    portion of the site (i.e. Sub-Catchments A1 and A2). This basin is consistent with the previously proposed basin in
    the past DA approval and only been slightly updated to account for the new development layout and the use of a Bio-
    Retention system rather than a water quality control pond for treatment.

   Central Basin is a water quality control pond (WQCP) which incorporates both detention storage for peak flow
    mitigation and water quality components. The WQCP will mitigate peak flows from the central and southern portion of
    the site (i.e. Sub-Catchments B1, B2, B3, B4, C1, C2 and C3). This concept is different from the previously approved
    Central Basin as the wetland has been replaced with a WQCP and the basin has been upsized to mitigate runoff
    from the southern portion of the site.

   Southern Catchment Diversion – Minor flows from the southern portion of the site are to be directed from the
    proposed South Bioretention Basin towards the Central Basin for flow attenuation. This flow diversion will be sized for
    the minor design storm (63% AEP), which is a flow of 1.25m3/s. Runoff that exceeds this capacity will overtop the
    bioretention basin and be conveyed to the eastern corner of the site. The southern bioretention basin has been
    modelled in XP-RAFTS to ensure that the outlet configuration is adequate to convey runoff as proposed.

Details of the proposed detention basins are presented in Table 3-6. For details of the proposed South Bioretention Basin
outlet configuration (sized for diversion of 63% AEP peak flows), refer to Drawing No. B14158.W-SK105 in
Appendix G.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                 COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                          ROAD, COOROY                | 10

Page 15

                                       Table 3-6:      Stormwater Detention Basin Concept Details

             Basin Details                                  Northern Basin2                                   Central Basin3
   Detention Volume to 1% AEP
                                                                 1,030m3                                          4,620m3
   Basin Level
   1% AEP Basin WSL (m AHD)                                      RL 100.5                                        RL 101.03
   Minimum Embankment Level (m
                                                                 RL 100.8                                        RL 101.30
   AHD)
   Normal Operating Level (m
                                                          RL 99.1 (Filter Level)                                  RL 99.2
   AHD)
                                                                                                 1.2m x 1.2m Riser Pit at RL 100.45m
   Primary Outlet Pit                            0.9m x 0.9m pit at RL 100.0m AHD
                                                                                                                AHD
   Primary Front Orifice                          2 x 250mm Dia at RL 99.4m AHD                     2 x 400mm at RL 99.6m AHD
   Primary Side Orifice                                            -                                2 x 400mm at RL 99.6m AHD
   Balance Orifice (between pits)                  1 x 300mm Dia at RL 98m AHD                                    -
   Secondary Outlet Pit                          0.9m x 0.9m pit at RL 100.15m AHD                                -
   Outlet Pipe                                       1 x 375mm at RL 98m AHD                        1 x 825mm at RL 98.3m AHD
   Major Overflow Weir
                                                  4m Wide1 Weir at RL 100.4m AHD                  10m Wide1 Weir at RL 100.9m AHD
   (Major Storm Events)
                                    Note: Further Basin Configuration Details are provided in Appendix C
      1
       Width refers to the base width of the weir; refer Calibre Consulting’s Operational Works Drawings within Appendix H for details
                  2
                  For further configuration details of the Northern Basin, refer to Drawing No. 16-001014-415, 416 and 417.
                  3
                      For further configuration details of the Central Basin, refer to Drawing No. 16-001014-402, 409 and 410.

The storage utilised for Stormwater Quality (i.e. the 300mm of temporary extended ponding depth above the bioretention filter media and the
  400mm above the normal operating level in the pond) has not been included in the detention volume. This is considered a conservative
                                                                 assumption.
The following stage-storage discharge relationship provided in Table 3-7 and Table 3-8 was modelled for each detention
basin.

                                 Table 3-7:      Northern Basin Stage Storage Discharge Relationship
                                       Accumulated              Discharge
            Stage (m AHD)                                                          Basin Control/Structure
                                       Storage (m3)               (m3/s)
                   99.4                      0                     0.00            Primary Front Orifice (2 x 250mm Dia)
                   99.5                     70                     0.02
                   99.6                    144                     0.06
                   99.7                    222                     0.11
                   99.8                    306                     0.14
                   99.9                    394                     0.16
                  100.0                    487                     0.18            Primary Outlet Pit (RL 100.0m AHD)
                  100.1                    585                     0.28
                  100.2                    688                     0.35            Secondary Outlet Pit (RL 100.15m AHD)
                  100.3                    796                     0.45
                  100.4                    910                     0.46            Major Overflow Weir (RL 100.4m AHD)
                  100.5                   1,030                    0.70
                  100.6                   1,156                    1.20
                  100.7                   1,287                    1.95
                  100.8                   1,424                    2.92            Top of Embankment (RL 100.8m AHD)




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                             COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                                      ROAD, COOROY                    | 11

Page 16

                           Table 3-8:    Central Basin Stage Storage Discharge Relationship
                          Accumulated
      Stage (m AHD)                          Discharge (m3/s)     Basin Control/ Structure
                          Storage (m3)
     99.6                      0                   0.00           Primary Front & Side Orifices
     99.7                     237                  0.06
     99.8                     485                  0.17
     99.9                     744                  0.33
     100.0                   1,013                 0.53
     100.1                   1,293                 0.77
     100.2                   1,583                 0.87
     100.3                   1,884                 0.96
     100.4                   2,196                 1.04           Primary Outlet Pit Weir Level (RL100.45mAHD)
     100.5                   2,517                 1.21
     100.6                   2,885                 1.66
     100.7                   3,265                 2.01
     100.8                   3,658                 2.06
     100.9                   4,069                 2.12           Major Overflow Weir (Major & Extreme Events)
     101.0                   4,489                 2.98
     101.1                   4,919                 4.60
     101.2                   5,359                 6.77
     101.3                   5,808                 9.43           Minimum Top of Embankment (RL 101.3m AHD)

3.2.6     DEVELOPED MITIGATED PEAKS FLOW RESULTS

Modelling was undertaken for the all recurrence interval storm events up to and including the 1% AEP storm event with
storm durations ranging from 30 to 120 minutes (these were considered the critical durations). A comparison between
peak flows for the existing and developed mitigated scenarios has been provided at each discharge location in Table 3-9
below.

                           Table 3-9:   Developed Mitigated Scenario Peak Flow Comparison
                                         Existing Peak       Developed Peak         Percentage
                        AEP             Discharge (m3/s)     Discharge (m3/s)       Difference
                                                      Discharge Location A (North)
                        63%                   0.17                0.16                  -5%
                        39%                   0.26                0.23                  -8%
                        18%                   0.36                0.34                  -4%
                        10%                   0.43                0.41                  -4%
                        5%                    0.55                0.46                 -17%
                        2%                    0.66                0.59                 -12%
                        1%                    0.77                0.77                  0%
                        AEP                          Discharge Location B (Central)
                        63%                   1.14                1.13                  -1%
                        39%                   1.71                1.54                 -10%
                        18%                   2.54                2.35                  -7%
                        10%                   3.02                2.76                  -9%
                        5%                    3.69                3.60                  -2%
                        2%                    4.28                4.13                  -4%
                        1%                    4.95                4.65                  -6%

As indicated in the results, peak flows have been reduced below existing levels at both discharge locations. Therefore,
the results demonstrate that the proposed detention basins are adequate to reduce peak flows to ensure no adverse
impact due to the development.


16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                         ROAD, COOROY                  | 12

Page 17

The Water Surface Levels (WSL’s) determined in each basin have been indicated in Table 3-10 below.

                        Table 3-10: Developed Mitigated Scenario Basin Water Surface Levels

                AEP                    Northern Basin                             Central Basin
                                WSL (m AHD)       Depth (m)1             WSL (m AHD)        Depth (m)1
                63%                99.92             0.52                  100.28               0.68
                39%               100.06             0.66                  100.50               0.90
                18%               100.19             0.78                  100.65               1.05
                10%               100.26             0.86                  100.77               1.17
                5%                100.37             0.97                  100.90               1.30
                2%                100.45             1.05                  100.97               1.37
                1%                100.51             1.11                  101.03               1.43
 Depth noted is the height above the stormwater quality temporary ponding level, which is 99.4m AHD and 99.2m AHD for the
                                          Northern and Central Basin respectively.

The results above indicate that 300mm freeboard has been achieved to the top of each basin’s minimum embankment
level. Results also indicate that the major overflow weirs are only overtopped during the major storm events (i.e. during
the 2% and 1% AEP storms). During the 1% AEP storm, discharge across the major overflow weir is limited to a depth of
200mm. The depth velocity (dV) products reaches a maximum of 0.15m2/s for the major overflow weirs, which is lower
than the QUDM requirements.

3.2.7     EXTREME EVENT SENSITIVITY CHECK

The major overflow/emergency weir for each detention basin has been designed to cater for extreme events, i.e. extreme
storms (i.e. 0.2% AEP storm event) and extreme blockage (100% blockage of basin pits/outlet pipes). To be conservative
the extreme 0.2% AEP storm event has been modelled with 100% blockage of the pits (considering weir flow only). The
0.2% AEP storm for 15 to 4320 minute durations has been modelled in XP-RAFTS with rainfall hyetographs generated
using the IFD parameters for Cooroy specified in Section 3.1.4. Results have been cross-checked with the 0.2% AEP
regional rainfall hyetograph for the 1440 minute storm duration adopted in Water Technology’s Cooroy Flood Study
(2013) model. The highest basin WSL was adopted from all these scenarios. Other than the rainfall parameters and basin
discharge values, all other modelling parameters remain the same as per the Developed Mitigated Scenario.

Table 3-11 below indicates 0.2% AEP basin WSL’s determined in XP-RAFTS.

                                  Table 3-11: Extreme Storm Event Weir Assessment

                                Parameter                         Northern Basin          Central Basin
               Minimum Top of Embankment Level (m AHD)                 100.8                  101.30
                Critical 0.2% AEP Storm Duration (minute)            45 minute              120 minute
                      0.2% AEP Basin WSL (m AHD)                      100.72                  101.22


As indicated in the above table, basin WSL’s indicated above are below top of the embankment levels.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                         ROAD, COOROY               | 13

Page 18

3.2.8     INTERNAL DRAINAGE STRATEGY

An internal stormwater drainage strategy is required to ensure that runoff is managed effectively through the site during
minor and major storm events. The following is proposed:

       Management of Internal Site Runoff -The proposed site stormwater network and road system is proposed to
        convey the major and minor storm events through the site. Typically, road drainage is designed to convey the
        minor storm only as per Council’s requirements. However, drainage has been upsized due to the limited
        overland flow or road capacity. This will decrease the frequency of runoff conveyed over the road, which
        promotes safety. As a minimum the minor drainage design capacity will be the 10% AEP storm event with road
        network or overland flowpaths to convey 1% AEP storm event.

       Management of External Catchment Runoff - As indicated in Drawing No. B14158.W-SK101 provided in
        Appendix G, stormwater drainage through the site will be upsized to convey major storm runoff from the
        external catchments (Sub-Catchment C1 and C2) through the site.

       Drainage Easements – Drainage easements are indicated on Drawing No. B14158.W-SK110 & SK111 provided
        in Appendix G.

       Discharge to Existing Swale on Site – Manning’s calculations were undertaken to compare peak flows and
        velocities through the existing swale located along the boundary of Lot 4 on RP215922. Results indicate that
        flood levels are less in the swale under existing conditions due to the proposed peak flow mitigation measures
        (i.e. detention basins). Refer to Appendix E for details. Furthermore scour protection has been designed based
        on QUDM (2013) at pipe outlets discharging to the swale to prevent scour and erosion. Refer to the SMCMP
        Report (No. 16-001014-02A dated September 2016).

       Basin Scour Protection – Rock scour protection has been designed at each basins inflows and outflows. Energy
        dissipater calculations for each basin are provided in Appendix E. To protect from vegetation damage velocity
        checks within each basin have also been undertaken with details provided in Appendix E.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                 COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                          ROAD, COOROY               | 14

Page 19

4         STORMWATER QUALITY
It is expected that the proposed development will increase the export of pollutants in runoff from the subject site. A
treatment train of a suitable Stormwater Quality Improvement Devices (SQID’s) have been proposed to intercept and
capture the pollutants. The methodology adopted in this analysis is generally consistent with the past approvals.
However, the proposed Water Quality Control Pond has conservatively not been modelled. This section discusses:

    The identification of key stormwater pollutants associated with the proposed development;
    The Water Quality Objectives (WQO’s) identified for the catchment;
    The stormwater quality management strategy to mitigate the increase in pollutant export; and
    The modelling of the proposed measures and comparison to the identified WQOs.

4.1       POLLUTANTS OF CONCERN
Typical key pollutants expected to be generated during the operational (post-construction) phase of the planned
development are listed as follows, with those presented in capitals being the key pollutants to be targeted for treatment:

     LITTER                                                    HEAVY METALS (associated with fine sediments)
     SEDIMENT                                                  Surfactants
     Oxygen demanding substances (possibly present)            Organochlorines & organophosphates
     NUTRIENTS (N & P)                                         Thermal pollution
     Pathogens / Faecal coliforms                              pH altering substances
     Hydrocarbons
Only the key pollutants will be further addressed in this report; however, the treatment train developed will adequately
mitigate the other pollutant loads. As heavy metals will predominately be associated with fine sediment, controls
proposed to reduce total suspended solids will also adequately reduce loads of heavy metals.

4.2       WATER QUALITY OBJECTIVES
Healthy Waterways WSUD Technical Guidelines (2006) outlines stormwater pollutant load reduction objectives required
for all developments within South East Queensland. These objectives have been adopted as the WQOs for conceptual
modelling of the development site and are summarised in Table 4-1 below.

                                  Table 4-1:   Load Reduction Water Quality Objectives
                            Total Suspended         Total Phosphorus                                  Gross Pollutants
        Pollutant                                                           Total Nitrogen (TN)
                              Solids (TSS)                 (TP)                                            (GP)
     Load Reduction
                                   80%                     60%                      45%                      90%
         Target

It should be noted that the above load-based objectives are consistent with those specified in the SEQ Regional Plan
Guideline No. 7, required under the SPP 2014.

4.3       STORMWATER QUALITY MANAGEMENT STRATEGY
A treatment train of suitable SQIDs has been proposed to mitigate the potential increase of stormwater pollutant loads.
Three SQIDs have been provided for the development to treat stormwater runoff before discharging downstream. The
locations of these devices are shown on Drawing No. B14158.W-SK102 in Appendix G.

As presented in Drawing No. B14158.W-SK102 in Appendix G some minor external catchment runoff flows through the
site and will be treated by the SQIDs. Treatment of stormwater runoff from external catchment areas of the railway
corridor and Cooroy Connection Road adjacent to the site is not an obligation of the developer. Not treating these



16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                 COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                          ROAD, COOROY                  | 15

Page 20

external areas would be difficult in practice as they drain through the site and could not practically be diverted around
treatment measures. Therefore, opportunity to treat stormwater runoff from these areas has been taken to benefit the
water quality of downstream systems. The treatment of external catchments is consistent with the strategy previously
approved by Council (Report No. B14158.W-01A dated December 2014). Refer to Section 4.4 for further details of the
modelling methodology.

As per the approval conditions, grease and oil generated from road and car parking areas, shall be generally managed by
proprietary GPT’s before discharge to Bioretention Basins. This requirement will be identified and incorporated if
necessary during detailed design.

4.3.1     UTILISED TREATMENT SYSTEMS

A treatment train of Gross Pollutant Traps (or sediment forebays), Bioretention systems and a Water Quality Control
Pond (WQCP) is proposed for the site’s stormwater quality management strategy. The details of the treatment systems
are provided below.
       Proprietary Gross Pollutant Trap (GPT) Devices (Primary Treatment) – While GPT’s have not been
        modelled in MUSIC, GPT’s are proposed upstream of the Central Bioretention Basin, Northern Bioretention
        Basin and Bio-Pod D2 (these secondary treatment devices receive runoff from a significant catchment, above
        5ha, and/or large car parking areas). As discussed in Section 4.3.2 below, GPT’s will be sufficient for capturing
        oil and grease from car parking areas prior to discharge to the downstream Bioretention System.
       Bioretention Systems (Secondary Treatment) – These systems utilise a sandy loam soil based media to filter
        runoff. Sediment particles and suspended solids are trapped on the surface of the filter media, while
        microorganisms and vegetation planted in the filter removes dissolved nutrients (nitrogen and phosphorus)
        through biological uptake processes. Subsoil drainage provided below the filter media allows the treated runoff to
        discharge from the bioretention basin.
       Water Quality Control Pond (WQCP) (Tertiary Treatment) –The WQCP reduces stormwater pollutants
        associated with fine particulates such as TSS, metals, nutrients and toxicants as well as soluble contaminants.
        The water bodies/ponds will have enhanced nutrient removal by incorporating macrophyte planting areas and
        open water zones. They will ensure that adequate pollutant retention is achieved before discharging offsite to
        adjacent properties. WQCP have a permanent water storage volume.

4.3.2     PROPOSED END-OF-LINE SYSTEMS

Three end-of-line stormwater quality systems are proposed for the development and are summarised below.

       Northern Basin (Bioretention System) - Catchment A is to be treated by a bioretention system. The system
        has no permanent water. Refer to Drawing No. 16-001014-415 in Appendix G for system details.

       Central Basin (Bioretention System and WQCP) - The Central Basin will treat Catchment B and C of the
        development. The central basin is proposed to be an open water feature. The basin comprises of a bioretention
        system and WQCP. The open water body will be topped up with treated stormwater from the Southern Basin
        during rainfall events. It is proposed that the macropyhtes are to cover a minimum of 20% of the water surface.
        Due to larger catchment a proprietary Gross Pollutant Trap (GPT) will be included upstream of the Bioretention
        Basin. Refer to Drawing No. 16-001014-405 in Appendix G for system details.

        At Council’s request the WQCP has not been modelled in MUSIC, i.e. the treatment resulting from the WQCP
        has not been modelled or included in the results contributing to the overall reduction in pollutant loads. This is
        conservative, considering that the WQCP will provide treatment by reducing suspended solids through
        sedimentation and is designed to capture some nutrients.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                 COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                          ROAD, COOROY                    | 16

Page 21

        Southern Basin (Bioretention System) – Catchment C is to be treated by a bioretention system. 63% AEP
         peak flows will be directed from this basin into the Central WQCP for additional treatment and detention. The
         system has no permanent water. Refer to Drawing No. 16-001014-400 in Appendix G for system details.

        Bioretention Pod D2 – A small Bioretention system is proposed to treat the car parking area.

Note that runoff from Catchment D3 is conveyed to Site Discharge Location B and therefore has been included in the
overall MUSIC model. An estimated breakdown of road, roof and ground area based on Table 3.3 of WBD’s MUSIC
Modelling Guidelines (2010) has been conservatively assumed for this catchment. A Bioretention Pod sized at 0.9% of
the catchment is proposed for this catchment area when it is developed. Further details are provided in Section 4.4.5.

As per Condition 65.2, Council specify that runoff from all road and car parking areas is to be pre-treated for grease and
oil prior to discharging to the downstream Bioretention Devices. According to WBD Bioretention Technical Design
Guidelines (2014), Bioretention Devices are suitable for treating runoff from roof, ground and road areas. Table 14 of the
guidelines outlines pre-treatment measures typically proposed upstream of Bioretention Devices based on catchment
size (i.e. for catchments between 2ha and 5ha vegetated swales, coarse sediment forebays, inlet pond or GPT’s are
recommended). The condition to pre-treat all runoff from road and car parking area specifically for oil and grease prior to
discharge into Bioretention Devices is considered to be conservative given the nature of the Bioretention treatment
device. There are also many examples of urban, commercial and industrial developments that propose Bioretention
Devices without pre-treatment of oil and grease.

It is also noted that the Bioretention Device will not be a Council asset. Hence it will be the responsibility of the developer
to manage and replant the basin in the very unlikely event that extreme oil spillages damage the Bioretention Devices
vegetation.

Apart from the Northern Bioretention Basin, GPT’s are proposed upstream of all Bioretention Devices and subsequently
the proposed pond. GPT’s have the capability of trapping floating oil and grease pollutants and are considered to be an
appropriate pre-treatment to Bioretention Devices, albeit conservative where the catchment is small. Since Catchment A
(Northern Bioretention Basin) is only 2.45ha with no significant areas of car parking a sediment forebay has been sized.

The HumeGard GPT’s proposed upstream of the proposed Bioretention Devices have the capability of trapping floating
oil and grease pollutants. As demonstrated on Page 2 of the HumeGard GPT Technical Manual provided in Appendix C,
the application of a floating boom provides separation at the surface of the waters between the sediment storage
chamber and the outlet chamber. This effectively captures pollutants such as oils and greases that float to the surface.
Based on laboratory and field testing, Table 1 on Page 3 of the Technical Manual indicates 90% removal efficiency of
Hydrocarbons during emergency spill events.

4.4       MUSIC MODELLING
Water quality modelling of the proposed development has been undertaken using the Model for Urban Stormwater
Improvement Conceptualisation (MUSIC) Version 6 developed by the Cooperative Research Centre for Catchment
Hydrology (CRCCH). MUSIC enables the user to conceptualise the transfer of pollutants through a stormwater drainage
system and provides an aid in quantifying the effectiveness of the proposed stormwater quality management strategy.
MUSIC only provides quantitative modelling for Total Suspended Solids (TSS), Total Phosphorous (TP), Total Nitrogen
(TN), and Gross Pollutants (GP).

The MUSIC model was setup generally in accordance with Water by Design MUSIC Modelling Guidelines (2010). The
subsequent sections discuss the model configurations adopted for the analysis.

Two models have been undertaken to determine whether site will meet objectives, the “Developed Site Only” model and
the “Developed Site with External - Mitigated” model. The methodology for demonstrating that WQOs for the site have
been met is summarised below.

   The Load Retention Target (in kg/yr) for the site was determined using the “Developed Site Only” model, estimating
    the pollutants generated from the developed site only.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                   COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                            ROAD, COOROY                 | 17

Page 22

   The Load Retention Achieved (in kg/yr) was determined using the “Developed Site with External - Mitigated” model,
    estimating the amount of pollutants removed from site and External Catchment B1 and C1 as a result of the
    stormwater quality improvement devices.

Catchment B1 and C1 as shown on Drawing No. B14158.W-SK102 are external and are not part of the site area. While
External Catchment B1 and C1 have been included in the stormwater quality analysis (as runoff from these areas enter
the site and into proposed stormwater quality treatment devices), these areas are not considered a “part of the
development” or identified as ‘site area’. As such, determining the amount pollutant reduction required to meet objectives
for the site (i.e. Load Retention Target) does include the pollutants generated from the external catchment areas. The
Load Retention Achieved has been determined by the total pollutants removed by the proposed SQID’s prior to discharge
from the site.

4.4.1     METEOROLOGICAL DATA

Six-minute pluviographic data was sourced from the Bureau of Meteorology (BOM) for Cooroy Composite (Station No.
40059). In accordance with Table 3.1 from MUSIC Modelling Guidelines (2010), the 10-year period from 1st January
1973 to 31st December 1983 has been adopted for the rainfall duration. The mean annual rainfall for this period is
1,600mm. The mean annual evapotranspiration for the modelled period is 1,629mm.

4.4.2     SOURCE NODES

Source nodes are sub-catchments that are defined for MUSIC modelling purposes. The site was divided into
sub-catchments as shown in Drawing No. B14158.W-SK102 in Appendix G.

The split catchment approach has been used to set up all source nodes in MUSIC. The MUSIC Modelling Guidelines
(2010) have been used to configure three types of surfaces, Roof, Road and Ground, to be modelled for each sub-
catchment. All sub-catchments within the model extent were assigned either Urban Residential or Commercial
Residential dependent on land use. Refer to Appendix F for MUSIC node configurations for the site. Split sub-catchment
node areas were calculated based on Concept Master Plan presented in Appendix A.

Rainfall runoff parameters for all nodes were assigned as residential land-use, in accordance with Table 3.7 of the
MUSIC Modelling Guidelines (2010). Pollutant export properties for source nodes have been configured according to the
industrial land use category in accordance with Table 3.8 of the MUSIC Modelling Guidelines (2010).

Stochastic generation estimation and serial autocorrelation set to zero has also been adopted.

4.4.3     PRIMARY AND SECONDARY DRAINAGE LINKS

A combination of primary and secondary drainage links have been used in MUSIC to model minor flow diversions
adopted in the site’s internal drainage strategy. Primary and secondary drainage links have been applied in two areas of
the site as indicated below:

   Minor runoff from Southern Basin directed to Central WQCP – 63% AEP peak flows from the Southern Bioretention
    Basin (will be directed to the Central WQCP to increase turnaround time (Hydraulic Residence Time) of the Pond and
    for peak flow attenuation. This has been modelled in MUSIC by using primary drainage link to direct runoff below the
    63% AEP storm event (<1.25m3/s) to the “Central WQCP” (not modelled in MUSIC) and a secondary drainage link to
    direct runoff high-flows downstream of the Pond.

   Minor runoff (63% AEP peak flow) from Catchment B1 and B2 to Central Bioretention Basin – peak flows in the 63%
    AEP storm event will be directed towards the GPT and Central Bioretention Basin for stormwater quality treatment
    before discharging to the proposed WQCP (not modelled in MUSIC). High flows bypassing the Central Bioretention
    Basin will be directed into the WQCP. This has been modelled in MUSIC by using primary drainage link to direct



16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                         ROAD, COOROY               | 18

Page 23

    runoff below the 63% AEP storm event (<0.29m3/s) to the Central Bioretention Basin and a secondary drainage link
    to direct high-flows to the towards the proposed WQCP (not modelled in MUSIC).

A layout of the primary and secondary drainage links modelled is indicated on the MUSIC configuration layout provided in
Appendix F. Drawing No. B14158.W-SK102 also provides further details of the site’s internal drainage strategy.

No routing was adopted for drainage links within MUSIC model in accordance with Section 4.17 of the MUSIC Modelling
Guidelines (2010). This assumes flows and associated pollutants from all parts of the catchment arrive at the treatment
nodes at the same time. This is conservative as it means that MUSIC may overestimate the overflow volumes.

4.4.4     TREATMENT NODES

4.4.4.1 BIORETENTION TREATMENT NODE

Bioretention treatment nodes were used to model the proposed bioretention filter in the northern and southern basin and
bio-pod. Default K and C* values were adopted for these treatment nodes. These treatment nodes were set up generally
in accordance with the MUSIC Modelling Guidelines (2010) and Interim MUSIC Bioretention Treatment Node (2013).
Refer to Table 4-2 for the bioretention treatment node configuration. All other parameters have been adopted from
MUSIC Modelling Guidelines (2010).

                                 Table 4-2:       Bioretention Basin Modelled Parameters

            Parameter               Northern Basin        Central Basin    Southern Basin        Pod D2        Pod D3
                     2
 Filter Media Area (m )                   525                  200              305               25            50
 Surface Area (m2)                        525                  220              340               25            50
 Extended Detention Depth (m)             0.3                  0.3              0.3               0.2           0.2
 Filter Depth (m)                         0.4                  0.4              0.4               0.4           0.4
                                                                                                 Sandy         Sandy
 Filter Media Type                    Sandy Loam          Sandy Loam        Sandy Loam
                                                                                                 Loam          Loam
 Saturated Hydraulic
 Conductivity of Filter Media             200                  200              200               200           200
 (mm/hr)
 TN Content of Filter Media
                                          400                  400              400               400           400
 (mg/kg)
 Orthophosphate Content of
                                           30                  30                30                30            30
 Filter Media (mg/kg)
 Overflow Weir Width Modelled
                                              4                 5                6                2.4           2.4
 (m)1
                            1The width of the major overflow weir was conservatively modelled.

            Refer to Drawing No. B14158.W-SK102 and SK113 in Appendix G for further treatment train details.

4.4.4.2 POND NODE

A separate MUSIC model was configured, including the WCQP to determine Hydraulic Residence Time (HRT), which is
an important feature of the pond required for avoiding outbreaks of algae (as discussed below). Table 4-3 indicates the
pond node configuration adopted in MUSIC. Further details of the WQCP are indicated on the Drawing No. 16-001014-
402 in Appendix G.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                    COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                             ROAD, COOROY            | 19

Page 24

                                          Table 4-3:   Pond Node Configuration

                                        Pond Parameter                  Central Basin
                                Surface Area (m²)                            1,940
                                Extended Detention Depth (m)                  0.40
                                Permanent Pool Volume (m³)                   1,845
                                Notional Detention Time (hrs)                 48.4
                                Equivalent Pipe Diameter (mm)                  55


Hydraulic Residence Time/Turnover Period

An important factor in determining pond sustainability is the turnover period, or Hydraulic Residence Time (HRT). Ponds
with high residence times are considered to be at risk of algal bloom and poor water quality.

Water By Design’s Urban Lakes Discussion Paper-Managing the Risk of Cyanobacterial Blooms dated Febuary 2012
recommends 10 to 15 days Hydraulic Residence Time for a lake. Other Queensland publication recommend 20 days
maximum hydraulic retention time. As such, we have recommended a Performance Indicator of a maximum Hydraulic
Residence Time of 15 days for the Central Basin / WQCP.

Using a simplistic approach as detailed in WSUD Engineering Principles – Stormwater (2005), the 20th percentile
Hydraulic Residence Time of 14 days was determined over a 30-year period (1973-2003) based on available data. Refer
to Table 4-4 below.

                  Table 4-4:    20th Percentile Hydraulic Residence Time Results (Simplistic Approach)
                Parameter                                                   30-Year Period (1973-2003)
                Impervious Area (ha)*                                                   8.8
                Lake Volume (m3)                                                       1,845
                Pond Area (m2)                                                         1,940
                All Year Rainfall (mm)                                                  678
                Catchment Inflow (m3)                                                 59,956
                Yearly Evaporation (mm)                                                1,629
                Net Evaporation (m3)                                                     1,844
                Net Inflow (ML)                                                           58
                Net Yearly Inflow / Lake Volume Ratio                                     31
                Probabilistic Residence Time (No. of days)                                12
         *The catchment impervious area to the central pond is consistent with MUSIC modelling areas and Fi values.

A continuous modelling approach was also undertaken using daily output from MUSIC modelling over the same 30-year
period. Using the more detailed approach, the 20th percentile HRT was determined to be 9 days, which also achieves the
required objective.

Therefore based on both the simplistic and continuous modelling approaches the Hydraulic Residence Time for the pond
will be below 15 days. This demonstrates that the required performance objective will be met.

If the water quality of the pond is found to be poor, recirculation of flows through the WQCP could be provided to increase
the turnover of water within the pond.

4.4.4.3 PROPRIERTY GROSS POLLUTANT TRAP (GPT)

A propriety (GPT) is proposed upstream of large catchments (above 5ha) or significant areas of car parking areas before
discharging to the proposed Bioretention Basins. While GPT’s are proposed upstream of the Central Basin, Southern


16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                 COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                          ROAD, COOROY               | 20

Page 25

Basin and Bio-Pod D2 they have not been modelled. This will make the results more conservative, as GPT’s will capture
gross pollutants and some sediments.

4.5         MUSIC MODELLING RESULTS
Results for the proposed stormwater quality management strategy (without modelling the WQCP) is presented in
Table 4-5 below.

                                          Table 4-5:    MUSIC Modelling Results
                                                     TSS              TP              TN         Gross Pollutants
                  Description
                                                    (kg/yr)         (kg/yr)         (kg/yr)          (kg/yr)
    Developed Site Only (Without
                                                    29,700            65             425                4,270
    Mitigation)
    WQOs (Percentage Reduction)                      80%             60%             45%                90%
    Load Retention Target                           23,760            39             191                3,843
    Developed Site plus External Catchment
                                                    36,500            77             480                4,630
    (Without Mitigation)
    Developed Site plus External Catchment
                                                    12,700            33             289                 488
    (With Mitigation)
    Load Retention Achieved                         23,800            44             191                4,142
    Load Retention Achieved as % of
                                                       80%           68%             45%                97%
    Developed Site Load
    Objective Achieved?                                YES           YES             YES                YES


Two models have been provided to Council, the “Developed Site Only” model and the “Developed Site with External -
Mitigated” model. The methodology for demonstrating that WQOs for the site have been met is summarised below.

     The Load Retention Target (in kg/yr) for the site was determined using the “Developed Site Only” model, estimating
      the pollutants generated from the developed site only.

     The Load Retention Achieved (in kg/yr) was determined using the “Developed Site with External - Mitigated” model,
      estimating the amount of pollutants removed from site and External Catchment B1 and C1 as a result of the
      stormwater quality improvement devices.
A comparison between the targets and pollutant retention achieved demonstrate that WQO’s for the site have been
met. This approach is consistent with past DA approvals (for the interim layout) and earlier discussions with Council.
The above results indicate that the proposed strategy is effective in treating pollutant loads from the proposed
development to achieve the WQO’s as required under SPP 2014.



5           WATERWAY STABILITY MANAGEMENT
The SPP 2014 waterway stability requires the limiting of the 63% AEP post-development peak flows within the receiving
waters to be below a minimum of pre-development peak flows.

Section 3.2.6 of this report includes analysis of peak flows for a 63% AEP rainfall event in which developed peak flows
have been mitigated back to existing conditions in all recurrence intervals. Therefore, the waterway stability management
objectives has been met.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                 COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                          ROAD, COOROY                | 21

Page 26

6         CONCLUSION
This Stormwater Management Plan has been prepared to support the Operational Works Application for Stage 2 and
subsequent Stages of the Palm Lakes Cooroy Retirement Community. The outcomes of the stormwater investigations
are listed below:

   Stormwater Quantity – Hydrological analysis demonstrates that no actionable nuisance to adjoining properties can be
    provided as peak flows at each discharge location from the site have been reduced below existing conditions for all
    storm events up to and including the 1% AEP storm. The proposed peak flow mitigation strategy (involving the
    Northern and Central Detention Basins, integrated with stormwater quality devices) is therefore adequate.
   Stormwater Quality – MUSIC modelling demonstrates that water quality objectives required by Noosa and the SPP
    (2014) can be met for the proposed development. The proposed Stormwater Quality Management Strategy involving
    Gross Pollutant Trap devices (GPT’s), Bioretention Basins and a Water Quality Control Pond (WQCP, not modelled
    in MUSIC) is therefore adequate. Construction and operational management and maintenance of the GPT’s,
    Bioretention Basins and WQCP is provided in the SMCMP Report.
   Waterway Stability Management - Results determined in the hydrological analysis demonstrate the waterway stability
    management requirements will be achieved, as there is a reduction in peak flows during the 63% AEP storm event.

Following MCU approval from Council, this report also addresses the Approval Conditions relating to stormwater
management. This has been summarised in Section 1.3 of this report.




7         RECOMMENDATIONS
It is recommended that this Operational Works design for Stage 2 (including Central Basin and Southern Basin) be
approved on the basis that acceptable outcomes will be provided for stormwater management.

With this submission we seek overall strategy approval for the balance stormwater management works (including the
Central Basin and Southern Basins). We also seek the approval for the Northern Bioretention Basin design however
inflow pipes are subject to future Civil Drainage Operational Works approval. Bio-Pod D2 and D3 are subject to future
Civil Drainage Operational Works approvals.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)               COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                        ROAD, COOROY                 | 22

Page 27

8         DISCLAIMER
This report has been prepared on behalf of and for the exclusive use of Palm Lake Resorts, is subject to, and issued in
accordance with the agreement between Calibre Consulting (QLD) Pty Ltd.

Our investigation and analysis has been specifically catered for the particular requirements of Palm Lake Resorts and
may not be applicable beyond this scope. For this reason, any other third parties are not authorised to utilise this report
without further input and advice from Calibre Consulting (QLD) Pty Ltd.

Calibre Consulting (QLD) Pty Ltd accepts no liability or responsibility whatsoever for the report in respect of any use of or
reliance upon this report by any third party.

The investigation and analysis has relied on information provided by others. We accept no responsibility for accuracy of
material supplied by others. The accuracy of the investigation, analysis and report is dependent upon the accuracy of this
information.



9         REFERENCES
   Bureau of Meteorology (2001), Climatic Atlas of Australia (Evapotranspiration).
   Engineers Australia (2006), Australian Runoff Quality. A guide to Water Sensitive Urban Design.
   Environmental Protection Agency (QLD) (2006). Environmental Protection (Water) Policy 1997. Noosa River
    Environmental Values and Water Quality Objectives.
   Healthy Waterways (2006). Water Sensitive Urban Design – Technical Design Guidelines for South East
    Queensland (2006).
   Noosa Council (2006). The Noosa Plan. Planning Scheme Policy.
   Queensland Government (2006), Queensland Water Quality Guidelines 2006. Environmental Protection Agency
    (QLD).
   Queensland Urban Drainage Manual (QUDM 2013).
   Queensland Water Commission (QWC) (2008). South East Queensland Water Strategy – Draft. Queensland Water
    Commission.
   Water by Design (2011), Construction & Establishment Guidelines.
   Water by Design (2012), Urban Lakes Discussion Paper - Managing the Risk of Algal Blooms.
   FAWB Guidelines for Filter Media Biofiltration Systems (Version 301, 2009).
   Water by Design, MUSIC Modelling Guidelines (2010).
   Water Technology’s Cooroy Flood Study (Report No. J2835-01_R02v01 dated 26 July 2013)
   SEQ Regional Plan 2009-2031 Implementation Guideline No. 7.
   Qld State Government, State Planning Policy (2014).




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                  COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                           ROAD, COOROY                | 23

Page 28

             CALIBRE CONSULTING




APPENDICES


[OCR of page images]
APPENDICES

 

Page 29

                                       CALIBRE CONSULTING




APPENDIX A CONCEPT MASTERPLAN LAYOUT


[OCR of page images]
CALIBRE CONSULTING

APPENDIX A CONCEPT MASTERPLAN LAYOUT

Page 30

                                         CALIBRE CONSULTING




APPENDIX B RATIONAL METHOD CALCULATION


[OCR of page images]
CALIBRE CONSULTING

APPENDIX B RATIONAL METHOD CALCULATION

Page 31

Catchment B - Existing Rational Method Calcs
File:           H:\B14\150-199\B14158.W\01 Final Layout Op Works\SW_Quantity\[B14158.W_Rational Method Calculations.xlsx]Existing_B
Date:           26/08/2016
Job:            B14158.W
By:             CM
Locality:       NSC Plateau
IFD Ref:        IFD_NSC Plateau
IFD Source:     Derived from Noosa Shire Council Rainfall Intensity Curves Tinbeerwah to Black Mountain (Plateau) STD. DRG. 9232 (1991)Bureau of Meteorology Chart Noosa Heads (1987)

Time of Concentration Calculations
                                                                                                              Av.           Pipe                                         Wetted                Roughness
                                                                                                                                          Velocity        Wetted Area                Hydraulic             Sub Total
Reference                      Equation Type / Method                   Area (ha)           Length (m)        Slope         Diameter                                     Perimeter             (Mannings/H               tc (min)
                                                                                                                                          (m/s)           (m2)                       Radius R              (mins)
                                                                                                              (%)           (mm)                                         (m)                   ortons)

4.06.6 QUDM                    Overland Sheet Flow - Friends Equation         16.08              200                0.5                                                                           0.045         32

4.06.8 QUDM                    Concentrated Overland / Channel Flow                              340                                          1.5                                                               4             36
                                                                                                                                                                                                            Adopted tc        36

C10 VALUE
Enter Fraction Impervious      Development Category                     fi                  1I10 (mm/hr)                                                                 C10


Table 5.04.2 QUDM                                                             0.08               70                                                                         0.72

                                                                                                                                                           Adopted C10      0.72

                                                                        Flow Calculations (QUDM 4.03.1)
                                                                                                                               tc (min)       36
                                                                                                              tc
                                                                        ARI                 Cy                 Iy           A (ha)        Q (m3/s)
                                                                                        1              0.57            52        16.08             1.32
                                                                                        2              0.61            66        16.08             1.80
                                                                                        5              0.68            84        16.08             2.55
                                                                                       10              0.72            93        16.08             2.96
                                                                                       20              0.75           110        16.08             3.69
                                                                                       50              0.82           131        16.08             4.82
                                                                                      100              0.86           138        16.08             5.27

Page 32

                                          CALIBRE CONSULTING




APPENDIX C DETENTION BASIN CALCULATIONS


[OCR of page images]
CALIBRE CONSULTING

APPENDIX C DETENTION BASIN CALCULATIONS

Page 33

Northern Basin: CONCEPT DETENTION BASIN DESIGN CALCULATIONS
File:      H:\B14\150-199\B14158.W\01 Final Layout Op Works\SW_Quantity\[B14158.W_Detention Basin Design (Master Layout).xls]NthBasinA
Date:      12/08/2015
User:      CM
Note:      Storage and outlet calcs for Detention Basin

STAGE - STORAGE RELATIONSHIP FOR WBNM
Stage areas taken from ACAD model
                                       Accumulated
   RL      Area. (m2)    Vol. (m3)       Vol. (m3)
   99.1                                      0
   99.2                                      0
   99.3                                      0
   99.4                                      0         Primary Front Orifice
   99.5                                     70
   99.6                                     144
   99.7                                     222
   99.8                                     306
   99.9                                     394
   100                                      487        Primary Outlet Pit
  100.1                                     585
  100.2                                     688
  100.3                                     796
  100.4                                     910
  100.5                                    1,030       Secondary Outlet Pit
  100.6                                    1,156
  100.7                                    1,287       Emergency Weir

OUTLET CALCULATIONS
                             Bio
                                         Circular        Primary Front          Primary Outlet                             Secondary                          Major Overflow
                         Filtration                                                                  Balance Orifice                           Outlet Pipe
                                          Inlet 1           Orifice                  Pit                                   Outlet Pit                              Weir
Type                       Basin
Length                                                                                 0.9                                      0.9                 20
Width                                                                                  0.9                                      0.9
No.                                                             2                                           1                                       1
Dia (m)                                                        0.25                                        0.3                                    0.375
Height (m)
Area (m2)                                                                             0.81                                    0.81                0.110
Invert Level (R.L)                                           99.4001                 100.0                  98              100.15001               98            100.4001
Inflow Level (R.L)                                           99.4001                 100.0                 99.4             100.15001              99.4
D/S HGL (R.L)                                                                                                                                     0.000
f (Fig 1.6)                                                                                                                                       0.029
Pit Loss (K)                                                                                                                                         1
Hyd Cond. (k) (m/hr)
Depth Media d (m)
Perimeter (m)                                                                          2.7                                      3.6                                   4
% Opening Clear *                                                                     75%                                      75%

STAGE - DISCHARGE RELATIONSHIP FOR WBNM
            Accum.      Bio Filtration
   RL                                  Circular Inlet 1 Primary Front Orifice   Primary Outlet Pit    Balance Orifice   Secondary Outlet Pit    Outlet Pipe   Major Overflow Weir   Discharge (m3/s)
            Vol. (m3)      Basin

   99.4           0          0.00       0.00             0.00                 0.00             0.00                            0.00                0.00              0.00                0.00
   99.5           70         0.00       0.00             0.02                 0.00             0.23                            0.00                0.34              0.00                0.02
   99.6          144         0.00       0.00             0.06                 0.00             0.23                            0.00                0.36              0.00                0.06
   99.7          222         0.00       0.00             0.11                 0.00             0.24                            0.00                0.37              0.00                0.11
   99.8          306         0.00       0.00             0.14                 0.00             0.25                            0.00                0.38              0.00                0.14
   99.9          394         0.00       0.00             0.16                 0.00             0.26                            0.00                0.40              0.00                0.16
    100          487         0.00       0.00             0.18                 0.00             0.27                            0.00                0.41              0.00                0.18
  100.1          585         0.00       0.00             0.20                 0.14             0.28                            0.00                0.42              0.00                0.28
  100.2          688         0.00       0.00             0.22                 0.40             0.29                            0.07                0.44              0.00                0.35
  100.3          796         0.00       0.00             0.23                 0.74             0.30                            0.35                0.45              0.00                0.45
  100.4          910         0.00       0.00             0.25                 1.13             0.30                            0.75                0.46              0.00                0.46
  100.5         1030         0.00       0.00             0.26                 1.27             0.31                            1.07                0.47              0.23                0.70
  100.6         1156         0.00       0.00             0.28                 1.40             0.32                            1.21                0.48              0.72                1.20
  100.7         1287         0.00       0.00             0.29                 1.51             0.33                            1.34                0.50              1.45                1.95
  100.8         1424         0.00       0.00             0.31                 1.61             0.33                            1.45                0.51              2.41                2.92
Note:
The following equations have been used to calculate flow capcaties for the
outlet types for each stage:
Sand Filter Equation (NSW EPA 1997)              Q = A x k(h+d) / d
Pipe Flow (M.J.Boyd 1972)                        Q = 0.421 x g0.5 x Dia0.87 x HW 1.63 (where HW/Dia < 1.2)
                                                 Q = 0.53 x g0.5 x Dia1.87 x HW 0.63 (where HW/Dia > 1.2)
                                                 where g = 9.81m/s2
Weir Equation (AR&R Equ. 14.5)                   Qi = 1.66 x P x d1.5
Orifice Equation (AR&R Equ. 14.6)                Qi = 0.67 x A x (2g x d)0.5
HGL Calculation (as per Section 5.21 QUDM)

Page 34

Central Basin: CONCEPT DETENTION BASIN DESIGN CALCULATIONS
File:      H:\B14\150-199\B14158.W\01 Final Layout Op Works\SW_Quantity\[B14158.W_Detention Basin Design (Master Layout).xls]CentralBasinOpWorks
Date:      12/08/2015
User:      CM
Note:      Storage and outlet calcs for Detention Basin

STAGE - STORAGE RELATIONSHIP FOR WBNM
Stage areas taken from ACAD model
                                                 Accumulated Vol.
   RL      Area. (m2)         Vol. (m3)                (m3)
  99.2                                                  0
  99.3                                                  0
  99.4                                                  0
  99.5                                                  0
  99.6                                                  0            Primary Front Orifice
  99.7                                                 237
  99.8                                                 485
  99.9                                                 744
   100                                                1,013
  100.1                                               1,293
  100.2                                               1,583
  100.3                                               1,884
  100.4                                               2,196
  100.5                                               2,517          Primary Outlet Pit
  100.6                                               2,885
  100.7                                               3,265
  100.8                                               3,658
  100.9                                               4,069          Major Overflow Weir
   101                                                4,489
  101.1                                               4,919
  101.2                                               5,359
  101.3                                               5,808          Min. Embankment Level

OUTLET CALCULATIONS
                                                 Primary Side          Primary Front                                          Major Overflow
                        Bio Filtration Basin                                               Primary Outlet Pit   Outlet Pipe
Type                                                Orifice               Orifice                                                  Weir
Length                                                                                            1.2               20
Width                                                                                             1.2
No.                                                      2                     2                                    1
Dia (m)                                                 0.4                   0.4                                 0.825
Height (m)
Area (m2)                                                                                        1.44              0.53
Invert Level (R.L)                                     99.6                  99.6               100.45             98.3           100.9
Inflow Level (R.L)                                     99.6                 99.60               100.45             99.6
D/S HGL (R.L)                                                                                                     0.000
f (Fig 1.6)                                                                                                       0.022
Pit Loss (K)                                                                                                        1
Hyd Cond. (k) (m/hr)
Depth Media d (m)
Perimeter (m)                                                                                     4.8                               10
% Opening Clear *                                                                                75%

STAGE - DISCHARGE RELATIONSHIP FOR WBNM
                                                                                                                                                  Total
            Accum.
   RL                     Bio Filtration Basin    Circular Inlet 1      Circular Inlet 2         WEIR 1           PIPE 1       WEIR Overflow   Discharge
            Vol. (m3)
                                                                                                                                                 (m3/s)
   99.6           0             0.00                 0.00                0.00                 0.00               0.00              0.00            0.00
   99.7          237            0.00                 0.03                0.03                 0.00               1.43              0.00            0.06
   99.8          485            0.00                 0.09                0.09                 0.00               1.50              0.00            0.17
   99.9          744            0.00                 0.17                0.17                 0.00               1.56              0.00            0.33
    100         1013            0.00                 0.27                0.27                 0.00               1.62              0.00            0.53
  100.1         1293            0.00                 0.39                0.39                 0.00               1.68              0.00            0.77
  100.2         1583            0.00                 0.43                0.43                 0.00               1.74              0.00            0.87
  100.3         1884            0.00                 0.48                0.48                 0.00               1.79              0.00            0.96
  100.4         2196            0.00                 0.52                0.52                 0.00               1.85              0.00            1.04
  100.5         2517            0.00                 0.56                0.56                 0.09               1.90              0.00            1.21
  100.6         2885            0.00                 0.60                0.60                 0.46               1.96              0.00            1.66
  100.7         3265            0.00                 0.64                0.64                 1.00               2.01              0.00            2.01
  100.8         3658            0.00                 0.67                0.67                 1.65               2.06              0.00            2.06
  100.9         4069            0.00                 0.71                0.71                 2.15               2.12              0.00            2.12
    101         4489            0.00                 0.74                0.74                 2.38               2.17              0.81            2.98
  101.1         4919            0.00                 0.77                0.77                 2.58               2.22              2.38            4.60
  101.2         5359            0.00                 0.80                0.80                 2.78               2.27              4.50            6.77
  101.3         5808            0.00                 0.84                0.84                 2.96               2.31              7.12            9.43
  101.4         6278            0.00                 0.87                0.87                 3.12               2.36             12.34           14.70
Note:
The following equations have been used to calculate flow capcaties for the
outlet types for each stage:
Sand Filter Equation (NSW EPA 1997)                              Q = A x k(h+d) / d
Pipe Flow (M.J.Boyd 1972)                                        Q = 0.421 x g0.5 x Dia0.87 x HW 1.63 (where HW/Dia < 1.2)
                                                                 Q = 0.53 x g0.5 x Dia1.87 x HW 0.63 (where HW/Dia > 1.2)
                                                                 where g = 9.81m/s2
Weir Equation (AR&R Equ. 14.5)                                   Qi = 1.66 x P x d1.5
Orifice Equation (AR&R Equ. 14.6)                                Qi = 0.67 x A x (2g x d)0.5
HGL Calculation (as per Section 5.21 QUDM)

Page 35

                                     CALIBRE CONSULTING




APPENDIX D XP-RAFTS LAYOUT SUMMARY


[OCR of page images]
CALIBRE CONSULTING

APPENDIX D XP-RAFTS LAYOUT SUMMARY

Page 36

                                      CALIBRE CONSULTING




Existing Scenario Layout




Developed Mitigated Scenario Layout


[OCR of page images]
CALIBRE CONSULTING

Existing Scenario Layout

Al

Oe

 

 

 

  
  

OUT
B4 B2 B3 B4 D2
O- O— ~ O-
C1 C2 c 1
O..—_
Developed Mitigated Scenario Layout
Al A2
Ore BasinA
in a ec A OUT
lin!
B1 B2 Tt
2
in ink'
In D2 D_OUT
eS link28 ink10
CA C3 =
> SthBasii node L
c i ~ rid vue fas
link4™
3
\ D1
Divert @
{ Pipe
In}
“Diver

Page 37

                                                                         CALIBRE CONSULTING




APPENDIX E     STORMWATER DESIGN CALCULATIONS

   E1:   Existing Swale – Manning’s calculations
   E2:   Energy Dissipater Calculations (Bioretention Basins and WQCP)
   E3:   Design Velocity Check (WQCP and Bioretention Basin)

Page 38

Appendix E1: Existing Swale Manning's Calculations

Section Location Sketch




Manning’s Sections
Assumptions

      Manning’s n value = 0.06 (site information)
      Longitudinal Slope = 0.6% (average slope measured from survey)




                                                               Proposed Development




              Overtops Embankment

Page 39

                                        Proposed Development




       Overtops Embankment




                             Proposed Development




Overtops Embankment


[OCR of page images]
 

Height (m AHD)

100.5

100

98

97.5

97

96

Manning's Section B - Existing & Developed Flood Comparison

 

  
 

Proposed Development

Overtops Embankment ~

 

 

\/

 

 

5 10 15 20 25 30
Chainage (m)

 

Existing Surface === Existing 1% AEP === Developed 1% AEP |

 

{ ——— Design Surface

35

 

 

 

Height (m AHD)

99.5

99

98.5

o
@

©
N
a

©
Sg

96.5

96

Manning's Section C - Existing & Developed Flood Comparison

 

waco

 

   

Overtops Embankment =

 
 

 

 

 

 

5 10 15 20 25 30
Chainage (m)

 

 

[ = Design Surface Existing Surface = = = Existing 1% AEP = = = Developed 1% AEP ]

 

35

 

 

 

Page 40

                  Overtops Embankment




Summary

Table A and B below indicate a comparison between existing and developed flood levels and
velocities within the existing channel on site.

Table A – Flood Level Comparison

 Cross Section       Ex WSL (m AHD)       Dev WSL (m AHD)         Difference (m)
       A                 98.77                 98.67                   -0.09
       B                 98.58                 98.57                   -0.01
       C                 98.30                 98.30                    0.00
       D                 97.97                 97.95                   -0.02


As indicated in Table A there are reductions in flood levels at each cross section location within the
existing swale due to the peak flow mitigation measures proposed. It is also noted that flood levels
will be significantly lower since they overtop the left channel embankment and sheet flows across
the site boundary (under both existing and developed conditions).

Table B –Velocity Comparison

 Cross Section       Ex Velocity (m/s)    Des Velocity (m/s)      Difference (m)
       A                   0.68                 0.95                   0.26
       B                   0.73                 0.87                   0.14
       C                   0.72                 0.94                    0.22
       D                   0.69                 0.68                   -0.01


While velocities within the existing swale have been slightly increased. The design velocity is less
than 1.0m/s which is not expected to cause scour.

Page 41

Proposed Channel Capacity Immediately Downstream of Culvert Outlet

A check of the capacity of the proposed channel immediately downstream of the proposed culverts
was determined using Manning’s calculations (refer to the section below). Results indicate that flood
levels during the 1% AEP storm are well below the proposed level of the Caretakers building (by
more than 2m). Therefore, in the instance that Caretaker’s building floor levels are adjusted slightly
for detailed design, the building will not be impacting by flooding from the WQCP outflows.

Page 42

WQCP ‐ Energy Dissipater Calculations (Derived From QUDM, 2013)
Pipe Outlets

Sizing of the scour rock protection for pipes was determined using calculations specified in Section
8.7 of QUDM, 2013. Below indicates rock protection requirements and the adopted outlet rock
protection configuration at each pipe outlet.




                                           Central Bioretention Basin   South Discharge into   Central Pond Outlet into
Location
                                            Outflow into Pond (375)      Central Pond (900)      Existing Swale (825)
Q (m3/s)                                             0.23                      1.275                     2.2
Area (m2)                                             0.1                       0.6                      0.5
Outlet Velocity (m/s)                                  2                        2.0                      4.1
Pipe Diameter                                        0.375                      0.9                     0.825
Multiple Cells?                                       NO                        NO                       NO
Multiplication Factor for Multiple Cells             N/A                       N/A                      N/A
Length Ratio D:L                                       3                         3                        5
Width (m)                                             1.4                       2.6                      3.1
Length (m)                                           1.125                      2.7                     4.125
d50 (mm)                                              200                       200                      300
Thickness of Rock Protection (mm)                     400                       400                      600

Page 43

Multi‐Pipe Outlet

Sizing of the scour rock protection for the proposed multiple pipe outlet was determined using
calculations specified in Section 10.4.15 of QUDM, 2013. Below indicates rock protection
requirements and the adopted outlet rock protection configuration at each pipe outlet.




                                           Central Basin Overflows
Location
                                                  (2 x 1050)
Catchments                                          B1, B2
Q (m3/s)                                              1.5
Area (m2)                                             1.7
Outlet Velocity (m/s)                                0.87
Diameter (m)                                         1.05
No of Cells                                            2
Equivalent Diameter (m)                              1.45
Multiplication Factor for Multiple Cells             N/A
Length Ratio D:L                                       3
Width (m)                                            1.45
Length (m)                                           4.35
d50 (mm)                                              200
Thickness of Rock Protection (mm)                     400

Page 44

Bioretention Basin ‐ Energy Dissipater Calculations (Derived From QUDM, 2013)
Pipe Outlets

Sizing of the scour rock protection for pipes was determined using calculations specified in Section
8.7 of QUDM, 2013. Below indicates rock protection requirements and the adopted outlet rock
protection configuration at each pipe outlet.




                                           Northern Bioretention Basin Outflow   Central Bioretention Basin
Location
                                                          (375)                        Outflow (375)
Q (m3/s)                                                   0.48                              0.23
Area (m2)                                                  0.1                               0.1
Outlet Velocity (m/s)                                       4                                  2
Pipe Diameter                                             0.375                             0.375
Multiple Cells?                                            NO                                NO
Multiplication Factor for Multiple Cells                   N/A                               N/A
Length Ratio D:L                                             3                                 3
Width (m)                                                  1.4                               1.4
Length (m)                                                1.125                             1.125
d50 (mm)                                                   200                               200
Thickness of Rock Protection (mm)                          400                               400

Page 45

Box Culvert or Multiple Pipe Outlets

Sizing of the scour rock protection for box culvert outlets were determined using calculations
specified in Section 10.4.15 of QUDM, 2013. Below indicates rock protection requirements and the
adopted outlet rock protection configuration at each culvert outlet.




                                    Central Bioretention Basin Inflow (1500 Southern Bioretention Basin
Location
                                                    x 600)                        Inflow (2 x 750)
Q (m3/s)                                             1.67                               2.08
Area (m2)                                             0.9                               0.88
Outlet Velocity (m/s)                                 1.9                               2.35
Diameter or Width (m)                                 1.5                               0.75
Cell Height (m)                                       0.6                                 ‐
Multiple Cells?                                       NO                                Yes
Length Ratio D:L                                       3                                 3
Width ‐ Equivalent Pipe Dia (m)                       1.5                               1.05
Length (m)                                            4.5                               3.2
d50 (mm)                                              200                               200
Thickness of Rock Protection (mm)                     400                               400

Page 46

WQCP Design Velocity Check
Since the pond has not been modelled in MUSIC and therefore isn’t ‘required’ for stormwater quality
treatment, the re‐suspension of suspended solids is not critical (i.e. WQOs will still be met for the
site if the amount of total suspended solids pollutant loads discharging into the pond is the same of
that discharging from the pond). The treatment that the pond will contribute to the site has not
been modelled in the stormwater quality management strategy.

Notwithstanding this, velocity checks were undertaken to ensure no scouring of macrophyte plants
and to demonstrate that re‐suspension of TSS is unlikely to occur.

First Assessment Criterion
For Macrophyte Zone Resuspension Protection, Equation 6.3 in WSUD Technical Design Guidelines
(2006) indicates the objective for velocities within typical wetland to ensure that stored pollutants
are not resuspended or remobilised. Figure A indicates Equation 6.3.




                Figure A – Equation 6.3 from WSUD Technical Design Guidelines (2006)

As per the Constructed WQCP Design Calculations Summary provided in this Appendix, velocities
based on this first criterion are 0.001m/s, which is below the minimum requirement and meets the
design objective.

Qmax riser is typically determined by the outlet conditions (i.e. riser pit), which is low due to retention
features of the wetland. This is the frequent flow check resulting from drainage of the extended
detention depth.

Second Assessment Criterion
For events greater than frequent flow ponding, the detention basin will have near zero velocity. We
have undertaken a check based on the total basin ponding. For flows greater than frequent flows we
have adopted Qmax riser using peak inflows derived from XP‐RAFTS, i.e. peak flows entering the basin
without considering backwater effects. This is conservative and will result in higher velocities than
what will actually occur in operation.

Velocities were determined at the critical section of the WQCP as indicated in the Figure A.

Page 47

                                                                  Critical Section




                             Figure A – Critical Section Through WQCP

Cross Sectional Area (A) was determined at the critical section using the basin water levels
determined in XP‐RAFTS for each storm event (63% to 1% AEP). Results are indicated in Table 1
below.

Page 48

Design Velocity Check Through Critical Section of WQCP
Filename:         H:\B14\150-199\B14158.W\01 Final Layout Op Works\Checklists\[B14158.W_Riser Calc.xlsx]Crit. Section
Date:             5/09/2016
By:               CM

Critical Section Through WQCP

1 to102.5
     100 Y ARI
WSL (m)                                               100.28                              m3/s
        102

            Basin Water Depth Above Extended Detention Depth (m) Cross Sectional Area (m2)
    101.5 1               0.43                            100.28                           14.25
          2               0.54                            100.50                           19.86
          5               0.66                            100.65                           23.97
     101
         10               0.73                            100.77                           27.42
         20               0.82                            100.90                           31.39
    100.550               0.89                            100.97                           33.50
        100               0.96                            101.03                           35.41

        100
                                                 Extended Detention Depth
     99.5                                                                                        WSL (m)        Design Channel



        99
              0             5           10           15           20          25           30              35             40


                                       Basin Water Depth Above Extended
AEP (%)           Qin at B2 (m3/s)                                      Cross Sectional Area (m2)               Velocity (m/s)
                                       Detention Depth (m)
   63%                    2.58                        0.43                           14.25                                0.18
   39%                    2.97                        0.54                           19.86                                0.15
   18%                    3.52                        0.66                           23.97                                0.15
   10%                    3.96                        0.73                           27.42                                0.14
    5%                    4.30                        0.82                           31.39                                0.14
    2%                    4.64                        0.89                           33.63                                0.14
    1%                    5.07                        0.96                           35.41                                0.14

As indicated in the results, velocities range from 0.14m/s to 0.18m/s at the critical section. This is
only slightly above the velocity re‐suspension objective of 0.05m/s, but is well below the velocity
limits of 0.5m/s and 2.0m/s to protect against vegetation scour, as provided in Section 2.3.5 of the
WSUD Technical Design Guidelines (2006).

The following should also be considered:

           As mentioned the velocity check equation indicated in WSUD Technical Design Guidelines
            (2006) is determined based on outflow conditions. Our calculations have conservatively
            considered basin inflow conditions.
           The velocities determined do not take into account backwater effect caused by the outlet
            that has been designed to restrict flows for detention. This will reduce velocities.
           The velocities do not take into account the coincidence of flows from both that is expected
            to reduce velocities further.

The results above demonstrate that the velocities through the WQCP are appropriate to avoid scour
and are unlikely to cause re‐suspension of stored pollutants.

Page 49

Bioretention Basin Velocity Checks
Velocity checks were undertaken at the critical section through the Bioretention Basins (i.e. section
with the shortest width). Note that these calculations do not take into account backflow effect and
ponding, since the outflow of the Bioretention Basins is limited by the outlet pit and weir
configuration. These calculations are therefore considered to be conservative.
Northern Bioretention Basin
Critical Section
CROSS SECTION DETAILS                                                         10% AEP                                1% AEP
     POINT       CH                  Z             n               wA           wP           n x wA         wA         wP     n x wA




               1                ‐9   100.1      0.060
               2                ‐9   100.1      0.060
               3                ‐6    99.1      0.060              0.07           0.67        0.00          0.10      0.82     0.01
               4                 6    99.1      0.060              2.54          12.00        0.15          3.10      12.00    0.19
               5                 9   100.1      0.060              0.07           0.67        0.00          0.10      0.82     0.01




                                                                 wA       wP                 n x wA          wA       wP     n x wA
                                              TOTAL           2.678832 13.34081              0.16073      3.295692 13.63174 0.197742
                          S
                        0.005                                        R             n           Q              R          n      Q
                                                                  0.2008         0.060        1.08        0.241766    0.060    1.51
                                                     Flow                         1.08                                 1.51

                                                    WSL                         99.312                               99.358

                    Calculated by Manning's Equation                              1.08                                1.51
                                            Vel (m/s)                             0.40                                0.46

                                                             Basin Section
                                                              100.2


                                                                  100


                                                                  99.8
  Height (m)




                                                                  99.6


                                                                  99.4


                                                                  99.2


                                                                    99
     -10           -8           -6       -4             -2                0              2        4              6       8       10
                                                                   Width (m)

                                              Existing Sur face               10 % AEP          1% A EP




As indicated in the results above, velocity is below 0.5m/s during both the major and minor storm
events. The potential for scour or damage to vegetation is therefore low and below requirements
specified in WSUD Technical Design Guidelines (2006)

Page 50

Central Bioretention Basin
Critical Section
CROSS SECTION DETAILS                                                      10% AEP                             1% AEP
     POINT       CH                    Z             n              wA       wP        n x wA         wA         wP      n x wA




                   1           ‐4.2   100.95      0.060
                   2           ‐4.2   100.35      0.060             0.00        0.04    0.00          0.00      0.09      0.00
                   3             ‐3   100.05      0.060             0.23        1.24    0.01          0.29      1.24      0.02
                   4              3   100.05      0.060             2.06        6.00    0.12          2.36      6.00      0.14
                   5            6.6   100.95      0.060             0.24        1.42    0.01          0.31      1.62      0.02




                                                                   wA         wP        n x wA     wA       wP           n x wA
                                                TOTAL           2.533472    8.69928    0.152008 2.958498 8.950312        0.17751
                            S
                          0.005                                     R           n        Q              R         n        Q
                                                                0.291228      0.060     1.31        0.330547    0.060     1.67
                                                       Flow                    1.31                              1.67

                                                      WSL                   100.394                            100.443

                       Calculated by Manning's Equation                         1.31                            1.67
                                               Vel (m/s)                        0.52                            0.56

                                                              Basin Section
                                                         101

                                                     100.9

                                                     100.8

                                                     100.7
  Height (m AHD)




                                                     100.6

                                                     100.5

                                                     100.4

                                                     100.3

                                                     100.2

                                                     100.1

                                                         100
           -6             -4               -2                   0                2              4               6            8
                                                                    Width (m)

                                                Existing Sur face          10 % AEP       1% A EP



As indicated in results above velocities are only slightly above 0.5m/s (by 0.02m/s and 0.06m/s
during the major storm). This is within the requirements for the major storm (less than 2m/s) but
only slightly above for the minor storm. However, scour or damage of vegetation is unlikely as the
results do not take into account the backflow effect caused by the outlet pit and weir which will
reduce velocities through the basin. Therefore the design of the basin is appropriate to cater for
inflow velocity.

Page 51

South Bioretention Basin
Critical Section
CROSS SECTION DETAILS                                                         10% AEP                           1% AEP
     POINT       CH                    Z            n              wA           wP       n x wA        wA         wP        n x wA




                   1         ‐11.2     101.2     0.060
                   2         ‐11.2       101     0.060
                   3           ‐10     100.7     0.060             0.11           0.95    0.01        0.14          1.11     0.01
                   4            10     100.7     0.060             4.62          20.00    0.28        5.37          20.00    0.32
                   5            12     101.2     0.060             0.11           0.95    0.01        0.14          1.11     0.01




                                                                  wA       wP     n x wA     wA       wP     n x wA
                                               TOTAL           4.833444 21.90487 0.290007 5.658369 22.21411 0.339502
                            S
                          0.005                                    R               n       Q            R             n       Q
                                                               0.220656          0.060    2.08       0.25472        0.060    2.68
                                                      Flow                        2.08                               2.68

                                                     WSL                       100.931                          100.9685

                       Calculated by Manning's Equation                           2.08                              2.68
                                               Vel (m/s)                          0.43                              0.47

                                                             Basin Section
                                                               101.4


                                                               101.2


                                                                   101
  Height (m AHD)




                                                               100.8


                                                               100.6


                                                               100.4


                                                               100.2


                                                                   100
      -15                   -10                -5                         0               5                    10              15
                                                                   Width (m)

                                               Existing Sur face              10 % AEP     1% A EP



As indicated in the results above, velocity is below 0.5m/s during both the major and minor storm
events. The potential for scour or damage to vegetation is therefore low and below requirements
specified in WSUD Technical Design Guidelines (2006)

Page 52

                                       CALIBRE CONSULTING




APPENDIX F   MUSIC MODELLING DETAILS


[OCR of page images]
CALIBRE CONSULTING

APPENDIX F MUSIC MODELLING DETAILS

Page 53

Developed Site Only Model
MUSIC Source Node Configuration
SOURCE NODE INPUTS
  SUB-CATCHMENT          AREA (ha)   IMPERVIOUS %   PERVIOUS %   Surface Type
      A1 ROAD              0.265           80           20             Urban_Road
      A1 ROOF              0.495          100           0              Urban_Roof
     A1 GROUND             0.225           50           50            Urban_Ground
      A2 ROAD              0.300           80           20             Urban_Road
      A2 ROOF              0.641          100           0              Urban_Roof
     A2 GROUND             0.421           50           50            Urban_Ground
      A2 PARK              0.146           0           100            Urban_Ground
      B2 ROAD              0.648           80           20             Urban_Road
      B2 ROOF              1.011          100           0              Urban_Roof
     B2 GROUND             0.724           50           50            Urban_Ground
      B3 ROAD              0.594           80           20             Urban_Road
      B3 ROOF              0.925          100           0              Urban_Roof
     B3 GROUND             0.541           50           50            Urban_Ground
      B4 ROOF              0.300          100           0           Commercial_Roof
     B4 GROUND             0.100           50           50         Commercial_Ground
      B4 PARK              0.649           10           90            Urban_Ground
      C2 ROAD              0.308           80           20          Commercial_Road
      C2 ROOF              1.065          100           0           Commercial_Roof
     C2 GROUND             0.651           50           50         Commercial_Ground
      C3 ROAD              0.750           80           20             Urban_Road
      C3 ROOF              1.398          100           0              Urban_Roof
     C3 GROUND             0.781           50           50            Urban_Ground
      D2 ROAD              0.249           80           20             Urban_Road
      D2 ROOF              0.369          100           0              Urban_Roof
     D2 GROUND             0.433           50           50            Urban_Ground
    D2 CAR PARK            0.200          100           0              Urban_Road
      D3 ROAD              0.174           80           20             Urban_Road
      D3 ROOF              0.291          100           0              Urban_Roof
     D3 GROUND             0.090           50           50            Urban_Ground
 D3 GROUND BYPASS          0.026           0           100            Urban_Ground
       TOTAL              14.768            -            -                  ‐


[OCR of page images]
Developed Site Only Model

MUSIC Source Node Configuration

SOURCE NODE INPUTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUB-CATCHMENT AREA (ha) __|IMPERVIOUS %| PERVIOUS % _|surface Type
A1 ROAD 0.265 80 20 Urban_Road
A1 ROOF 0.495 100 0 Urban_Roof
A1 GROUND 0.225 50 50 Urban_Ground
A2 ROAD 0.300 80 20 Urban_Road
A2 ROOF 0.641 100 0 Urban_Roof
A2 GROUND 0.421 50 50 Urban_Ground
A2 PARK 0.146 0 100 Urban_Ground
B2 ROAD 0.648 80 20 Urban_Road
B2 ROOF 1.011 100 0 Urban_Roof
B2 GROUND 0.724 50 50 Urban_Ground
B3 ROAD 0.594 80 20 Urban_Road
B3 ROOF 0.925 100 0 Urban_Roof
B3 GROUND 0.541 50 50 Urban_Ground
B4 ROOF 0.300 100 0 Commercial_Roof
B4 GROUND 0.100 50 50 Commercial_Ground
B4 PARK 0.649 10 90 Urban_Ground
C2 ROAD 0.308 80 20 Commercial_Road
C2 ROOF 1.065 100 0 Commercial_Roof
C2 GROUND 0.651 50 50 Commercial_Ground
C3 ROAD 0.750 80 20 Urban_Road
C3 ROOF 1.398 100 0 Urban_Roof
C3 GROUND 0.781 50 50 Urban_Ground
D2 ROAD 0.249 80 20 Urban_Road
D2 ROOF 0.369 100 0 Urban_Roof
D2 GROUND 0.433 50 50 Urban_Ground
D2 CAR PARK 0.200 100 0 Urban_Road
D3 ROAD 0.174 80 20 Urban_Road
D3 ROOF 0.291 100 0 Urban_Roof
D3 GROUND 0.090 50 50 Urban_Ground
D3 GROUND BYPASS 0.026 0 100 Urban_Ground
TOTAL 14.768 a 2

 

 

Page 54

MUSIC Layout Configuration – Developed Site Only Model


[OCR of page images]
MUSIC Layout Configuration — Developed Site Only Model

 

   

     

 

 

 

 

A2 Ground D3 Roof
D3 Ground’ D3 Road D2 Ground
A2 Root a2 A2 Road A2 Park
D3 Ground Bypass.
a @-
‘At Ground At Junction A Receiving Node D Junction D2 Car Park

 

82 Roof

 

    

C2 Root

 

F1 High Flow
cz C2 Road
lunctio Bc Junction
C3 Road 3 Ground
B3 Roof B3 Ba 84 Ground

B4 Park
B3 Road 83 Ground B4 Roof

C3 Roof

Page 55

Developed Mitigated (With External Catchments) Model
MUSIC Source Node Configuration
Source Node Input
          Sub‐Catchment     Area (ha)   Impervious Percent   Pervious Percent      Surface Type
             A1 Road          0.265             80                  20             Urban_Road
             A1 Roof          0.495            100                  0              Urban_Roof
            A1 Ground         0.225             50                  50            Urban_Ground
             A2 Road          0.300             80                  20             Urban_Road
             A2 Roof          0.641            100                  0              Urban_Roof
            A2 Ground         0.421             50                  50            Urban_Ground
              A2 Park         0.146             0                  100            Urban_Ground
           EXT B1 Road        0.372            100                  0              Urban_Road
          EXT B1 Ground       1.760             0                  100            Urban_Ground
             B2 Road          0.648             80                  20             Urban_Road
             B2 Roof          1.011            100                  0              Urban_Roof
            B2 Ground         0.724             50                  50            Urban_Ground
             B3 Road          0.594             80                  20             Urban_Road
             B3 Roof          0.925            100                  0              Urban_Roof
            B3 Ground         0.541             50                  50            Urban_Ground
             B4 Roof          0.300            100                  0            Commercial_Roof
            B4 Ground         0.100             50                  50          Commercial_Ground
              B4 Park         0.649             10                  90            Urban_Ground
           EXT C1 Road        0.342             80                  20             Urban_Road
          EXT C1 Ground       0.975             20                  80            Urban_Ground
             C2 Road          0.308             80                  20           Commercial_Road
             C2 Roof          1.065            100                  0            Commercial_Roof
            C2 Ground         0.651             50                  50          Commercial_Ground
             C3 Road          0.750             80                  20             Urban_Road
             C3 Roof          1.398            100                  0              Urban_Roof
            C3 Ground         0.781             50                  50            Urban_Ground
             D2 Road          0.249             80                  20             Urban_Road
             D2 Roof          0.369            100                  0              Urban_Roof
            D2 Ground         0.433             50                  50            Urban_Ground
            D2 Car Park       0.200            100                  0              Urban_Road
             D3 ROAD          0.174             80                  20             Urban_Road
             D3 ROOF          0.291            100                  0              Urban_Roof
            D3 GROUND         0.090             50                  50            Urban_Ground
        D3 GROUND BYPASS      0.026             0                  100            Urban_Ground
               Total         18.217              ‐                   ‐                   ‐


[OCR of page images]
Developed Mitigated (With External Catchments) Model

MUSIC Source Node Configuration

 

Source Node Input

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sub-Catchment Area (ha) Impervious Percent Pervious Percent Surface Type
Al Road 0.265 80 20 Urban_Road
Al Roof 0.495 100 0 Urban_Roof

A1 Ground 0.225 50 50 Urban_Ground
A2 Road 0.300 80 20 Urban_Road
A2 Roof 0.641 100 0 Urban_Roof

A2 Ground 0.421 50 50 Urban_Ground
A2 Park 0.146 0 100 Urban_Ground

EXT B1 Road 0.372 100 0 Urban_Road

EXT B1 Ground 1.760 0 100 Urban_Ground
B2 Road 0.648 80 20 Urban_Road
B2 Roof 1.011 100 0 Urban_Roof

B2 Ground 0.724 50 50 Urban_Ground
B3 Road 0.594 80 20 Urban_Road
B3 Roof 0.925 100 0 Urban_Roof

B3 Ground 0.541 50 50 Urban_Ground
B4 Roof 0.300 100 0 Commercial_Roof

B4 Ground 0.100 50 50 Commercial_Ground
B4 Park 0.649 10 90 Urban_Ground

EXT C1 Road 0.342 80 20 Urban_Road

EXT C1 Ground 0.975 20 80 Urban_Ground
C2 Road 0.308 80 20 Commercial_Road
C2 Roof 1.065 100 0 Commercial_Roof

C2 Ground 0.651 50 50 Commercial_Ground
C3 Road 0.750 80 20 Urban_Road
C3 Roof 1.398 100 0 Urban_Roof

C3 Ground 0.781 50 50 Urban_Ground
D2 Road 0.249 80 20 Urban_Road
D2 Roof 0.369 100 0 Urban_Roof

D2 Ground 0.433 50 50 Urban_Ground

D2 Car Park 0.200 100 0 Urban_Road
D3 ROAD 0.174 80 20 Urban_Road
D3 ROOF 0.291 100 0 Urban_Roof

D3 GROUND 0.090 50 50 Urban_Ground

D3 GROUND BYPASS 0.026 0 100 Urban_Ground
Total 18.217 2 2 2

 

 

Page 56

MUSIC Layout Configuration – Developed Mitigated (With External Catchments) Model


[OCR of page images]
MUSIC Layout Configuration — Developed Mitigated (With External Catchments) Model

 

   
 

     
   

A2 Ground 3 Root

D3 Ground

A2 Root A2 Road A2 Park ™

CA D2 Roof
At Road

@

 

   

D3 Ground Bypass. Bio Pod D3

 

    

 

 

At Gr At thern Basin A Receiving Node. D
Ground Northern Basi 9 X Bio Pod D2 02 Car Park
el @ -
ey N
m2 foot \
82 Ground XN Al
‘ XN
S 2 Ground
~
N
se Eee N
N
82 Road @ Ft High Flow (rena) N
N
2 C2 Rood
NX
_
NX
N
- e
ExT B1 Ground ExT 1
Southern Basin Bio EXT Ct EXT C4 Ground
comtral Basin Big Bc
C3 Rosa 3 Ground
EXT Bt Road 83 Roof BS Bt B4 Ground ° EXT C1 Road
4 Park C3 Root

B3 Road 83 Ground B4 Roof

Page 57

Results Comparison


Site Only (No Mitigation)
                                             Source            Residual           Reduction
Flow (ML/yr)                                             187                187                 0
Total Suspended Solids (kg/yr)                         29700              29700                 0
Total Phosphorus (kg/yr)                                64.8               64.8                 0
Total Nitrogen (kg/yr)                                   425                425                 0
Gross Pollutants (kg/yr)                                4270               4270                 0


Site + External Catchments with Mitigation
                                             Source            Residual           Reduction
Flow (ML/yr)                                             214                213                  1
Total Suspended Solids (kg/yr)                         36500              12700                 65
Total Phosphorus (kg/yr)                                77.1                 33                 58
Total Nitrogen (kg/yr)                                   480                289               40.6
Gross Pollutants (kg/yr)                                4630                488               92.9


Music Modelling Results
             Description                       TSS                TP                 TN              Gross Pollutants
                                             (kg/yr)            (kg/yr)            (kg/yr)               (kg/yr)
    Developed Site Only (Without
             Mitigation)                     29700               64.8               425                   4270
    WQOs (Percentage Reduction)               80%                60%                45%                   90%
        Load Retention Target                23760              38.88              191.25                 3843
Developed Site plus External Catchment
         (Without Mitigation)                36500               77.1               480                   4630
Developed Site plus External Catchment
          (With Mitigation)                  12700                33                289                   488
      Load Retention Achieved                23800               44.1               191                   4142
   Load Retention Achieved as % of
         Developed Site Load                  80%                68%                45%                   97%
         Objective Achieved?                  YES                YES                YES                   YES

Page 58

                              CALIBRE CONSULTING




APPENDIX G CONCEPT DRAWINGS


[OCR of page images]
CALIBRE CONSULTING

APPENDIX G CONCEPT DRAWINGS

Page 59

 

    

     
 

EXISTING SWALE
NORTHERN

 
   
 
 

   
 

 

EXISTING HOUSES
AND SHEDS

 
   
 
  

 

    

 

 

 

  
 

 

  

 

 

 

     

 

 

 

 

EXISTING DAM \
»
EXISTING HOUSES \ J /
AND SHEDS EXISTING Z 300 EXISTING 300 //
PIPE RCP /
LOT 2 .
RP 165418 \ EXISTING SHED . J Lf LY
9b J JnW
ot god / Y \
~\y Tamers
EXISTING B450 RCP —_
EXISTING HOUSES ¥ 4
AND SHEDS
Pad SOUTHERN
CENTRAL EXISTING DAM
EXISTING DAM I
7 LoT 1
4 RP165418 J S XN l
0 / LOT 1
7 J N RP215922 l
\ ? 7 4 \
\ J
\ 7 A ~N
SS 7 ~ ,
Bt { N ~ \
ey . ~“
% ON ” N \ EXISTING B375 \
vgn x RCP ~“
ae ON . S
AN XQ N \,
YN 1 — ae a _— a a a a = =
\ \s ~ aN ~~ ee — ~ ——
: COOROY CONNECTION ROAD
\ = a aks ee ee ee
EXISTING 900x300 — a a
~ BOX CULVERT =a EXISTING 1350x300 a
— aoe BOX CULVERT
ee
APPROXIMATE ALIGNMENT OF ELEVATED RAILWAY
CORRIDOR (TOP OF CATCHMENT).
SOURCE; MAPVIEW - QLD GOVERNMENT DEPARTMENT
OF NATURAL RESOURCES AND MINES (2006) SS
LEGEND
APPROXIMATE SITE BOUNDARY (MCU) » FLOW DIRECTION
EXISTING SCENARIO, EXISTING CONTOURS
CATCHMENT BOUNDARY
EXISTING SCENARIO @ DISCHARGE LOCATION
CATCHMENT LABEL NOTES:

FLE: BUs1S8.W-SK100.dwg_DATE: 12-11-2015 TIME: 08:47

iref's

X_BIA158.W_BASE X_BI4158.W_EXISTING X_B14158.W_TITLE USR: Sam Linde

 

FLOW PATH

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.

16-001014-01.

 

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

 

 

 

‘DRAWING TITLE

 

 

 

 

rast [ous ane] on Ue SRE TEST TRG Te Sr
AMM BETA SURVEYOR: KEN HICKS & ASSOCIATES

—————e 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT EXISTING SCENARIO

a ‘moe et Ph (07) S463 2864 Fox (07) 3663 7146 | Cc CATCHMENT PLAN

 

 

 

 

 

O4zmE0zm=E>
mo] oe] >|

 

 

 

 

 

 

DRAWN CHECK

PROJECT No.

123500 3

B14158.W

 

 

 

"APPROVED, ANDREW McPHAIL RPEQ 6921

MATTHEW HILL RPEQ 11578

FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY L10

 

PALM LAKES - COOROY
RETIREMENT COMMUNITY

Callore

CONSULTING

 

 

Biss Caber Usboma Spdwy Shgpom SumineCoat L404

 

 

TSSUE

B14158,W-SK100 B

‘DRAWING NUMBER

 

 

 

Page 60

                  -
                CC___

               BBQ AREA
                          DECK




  POOL




         SPA
 __
CC___


[OCR of page images]
 

LEGEND:

NORTHERN BASIN
PROVIDES PEAK
FLOW MITIGATION

CENTRAL BASIN
PROVIDES PEAK
FLOW MITIGATION

 
 

 

  
 
  
 
  
  
 

EXISTING SWALE

 

 

 

 

 

 

 

63% AEP PEAK
FLOW PIPE DIVERSION

 

 

ai

 

\ SOUTHERN BASIN
63% AEP PEAK FLOWS TO
BE DIRECTED TO POND

DIF TRADING POST ROAD:

 

 

 

 

 

 

 

 

 

 

 

Ce PEPETIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\ T
\

~_
SITE BOUNDARY i —

a —
DEVELOPED CATCHMENT BOUNDARY

PROPOSED STORMWATER DRAINAGE

UPSIZED SITE DRAINAGE NETWORK AND STORMWATER EASEMENT
TO CATER FOR UPSTREAM EXTERNAL CATCHMENT FLOWS

WATER QUALITY CONTROL POND
OR BIORETENTION BASIN >

FLOW DIRECTION
63% AEP PEAK FLOW DIVERSION

SITE DISCHARGE LOCATION
EXISTING SWALE

PROPOSED EASEMENT (STORMWATER/SERVICES)

—
—_
—_
—

COOROY CONNECTION ROAD

—_

SITE DRAINAGE AND ROAD NETWORK
DESIGNED TO CONVEY 1% AEP PEAK FLOWS
OF UPSTREAM EXTERNAL CATCHMNET

 

 

\
— —

NOTES:

 

* oR FURTHER BASIN CONFIGURATION REFER
TO DETAILS PROVIDED ON SUBSEQUENT
PLANS, SIZING SUBJECT TO DETAILED DESIGN.

 

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
16-001014-01.

 

 

2. SPLIT FLOW PIT TO DIVERT 63% AEP FLOWS FROM
CATCHMENT B2 TO GPT AND BIORETENTION BASIN

7 GSTTSILY
ESPRPEPET

ie fenena rena plent
Egeeronrren fo

Fa bbobeb Detaled bled
Pa

 

MINOR DESIGN STORM CONVEYED
THROUGH SITE DRAINAGE. MAJOR
OVERFLOWS DIRECTED TOWARDS

TRADING POST ROAD

  
   
  
   

 

 

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

 

 

 

=|

z
8
2
=

DATE

 

"SCALE (METRES 7 MIGROFIM No,

DESIGN CHECK

“CLIENT

10.15

AMENDMENT DETAILS.

 

OzmzozmE>
[leo @]>
=

 

2.10.15

MINOR LAYOUT AMENDMENT

 

A

MINOR LAYOUT AMENDMENTS

1250 25 0 25

50 Al

 

 

05.02.16

LAYOUT AMENDMENTS:

4.2500
DRAWN CHECK|

 

26.08.16

MINOR” AMENDMENTS

 

 

 

 

 

 

 

 

 

AB

 

PROJECT No.

B14158.W

 

SURVEYOR: KEN HICKS & ASSOCIATES

49 THE ESPLANADE MAROOCHYDORE

Ph (07) 5443 2844 Fax (07) 5443 7146

APPROVED ANDREW McPHAIL RPEQ 6921
MATTHEW HLL RPEQ 11578

FOR & ON BEHALF QF CALIBRE CONSULTING (QLD) PTY LTO

PALM LAKES RESORT

Cc

 

 

PROECT

PALM LAKES - COOROY
RETIREMENT COMMUNITY

calibre

CONSULTING

 

Callbre Consulting (QLD} Pty Ltd
| Queen

(CONSULT AUSTRALIA

QLD Aurtraia 4000 eared

Ground Foy, Siders Company
Talphone 07 3895 2444 Facamile 073895 9400 iso bon
Racin Caton tabom fyity Sean Beninecoat 164084

‘DRAWING TITLE

DEVELOPED MITIGATED
CATCHMENT PLAN

 

 

‘DRAWING NUMBER

B14158.W-SK101

 

 

 

Page 61

                  -
                CC___

               BBQ AREA
                          DECK




  POOL




         SPA
 __
CC___


[OCR of page images]
 

STORMWATER DRAINAGE EASEMENT
AND SERVICES CORRIDOR

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BlOPOD D2 \
WOODWORKING/GOLF ROOM aE eer wil oe
AND TENNIS COURTS FILTER AREA, 25m? BIOPOD D3
FILTER DEPTH: Om FUTURE DEVELOPMENT TO HAVE OWN
NORTHERN BASIN (SW QUALITY & DETENTION) TEMP. PONDING DEPTH: 0.2m ea ER ae AMEN
CONTROLS (0.9% FILTER AREA PER
BIORETENTION SYSTEM WITH SEDIMENT FOREBAY CATCHMENT AREA REQUIRED)
FILTER AREA: 525m? CARETAKER'S
FILTER DEPTH: 0.4m
TEMP. PONDING DEPTH: 0.3m
SOUTHERN BASIN.
BIORETENTION SYSTEM WITH UPSTREAM GPT (TREATED
FLOWS TO DISCHARGE INTO CENTRAL WQCP)
FILTER AREA: 305m?
FILTER DEPTH: 0.4m
TREATMENT TRAN CLUDES WO, ere 0 STAGE? DoERATIONAL WORKS DRAWINGS
BIORETENTION BASIN AND UPSTREAM GPT FOR FURTHERDETAILS
REFER TO STAGE 2 OPERATIONAL WORKS
DRAWINGS FOR DETAILS BOWLING MINOR DESIGN STORM CONVEYED
PPK Ses THROUGH SITE DRAINAGE. MAJOR
GREENS
SPLIT FLOW PIT (63% AEP PEAK OVERFLOWS DIRECTED TOWARDS
FLOWS TO SOUTHERN BASIN) TRADING POST ROAD
Mae) TRADING POST
= SWIMMING ROAD
POOL
CLUBHOUSE
s/o lt
'
l T 1
1 CENTRAL
BIORETENTION
BASIN ,
‘A1 ;
120 BED AGE
CARE FACILITY
B3}
%G
% S op a
BX S =
%,
%— \
\ COOROY CONNECTION ROAD XN
je —
LEGEND: — aw A
SITE BOUNDARY
MUSIC CATCHMENT LABELS MUSIC _CATCHMENT PLAN
—— = MUISIC CATCHMENT BOUNDARY SCALE 11250 (At)
LOW FLOW DIRECTION SCALE 12500 (A3)
wo PROPOSED STORMWATER DRAINAGE
MODELLED AS AREAS
a PROPOSED FLOW PATH BYPASSING TREATMENT NOTES:
CARPARKING AREA CATCHMENT D2 =—
WATER QUALITY CONTROL POND igaseaatestasseatead TO BE TREATED BY BIOPOD D 1. THIS DRAWING IS TO BE READ IN CONJUNCTION
OR BIORETENTION BASIN > WITH CALIBRE CONSULTING REPORT No.
16-01014-01 CONCEPT PLAN ONLY
K<XEZ MODELLED AS COMMERCIAL FOR FURTHER BASIN CONFIGURATION REFER 2. SPLIT FLOW PIT TO DIVERT 63% AEPI FLOWS NOT 10 BE USED FOR
TO DETAILS PROVIDED ON SUBSEQUENT FROM CATCHMENT B2 10 GPT AND CONSTRUCTION PURPOSES
PLANS, SIZING SUBJECT TO DETAILED DESIGN. BIORETENTION BASIN
FILE: B14158.W-SK102.dwg DATE: 12-11-2015 TIME: 15:31 *
Xref's: X_B14158.W_TITLE X_B14158.W_BASE USR: chris mok
Se ee SOE TEES T TEEROET he oy RNR TE
AMENOMENT DETAILS DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES a
| a 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT ‘CONSULT AUSTRALIA MUSIC CATCHMENT
te Se 11250 25 0 2 so Al Ph (07) 5443 2864 Fax (07) 5443 7166 | C = whi PLAN
nN 1:2500 AZ [.-AO0“DC~S<S;<S;7 Sd |
sic DRAWN CHECK PROJECT Wo APPROVED ANDREW MCPHAL RED 692 Calle Consutng (QLD) Pty id
ip 814158, W wrt fa sn? © PALM LAKES - COOROY Callore feLienae heme) Sa bee aa
sir FOR & ON BEHALF OF CALIBRE CONSULTING (ALO) PTY L1D RETIREMENT COMMUNITY CONSULTING Dace Cetrt bow tytn Capon bueno ‘TSE B14158.W-SK102 B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 62

                 -
               CC___

              BBQ AREA
                         DECK
   OL
  PO




          A
        SP




 __
CC___


[OCR of page images]
 

NORTHERN BASIN

®

2S

CENTRAL BASIN

    
  
 
 

    

 

PROPOSED GPT

Be 63% AEP PEAK
FLOW DIVERSION

     
   
   
   
   
     

 

 

Y
lal /V
PROPOSED 6m WID! Y L
DRAINAGE EASEMENT Al/ 4
4
Y
i //
PLUNGE POOL / 4//%
ENERGY ‘a/7
DISSIPATER “Ny
7
EXISTING SWALE JNJ
7 ,
S BIOPOD D2
/ nV
fe \
7 L =\
7 / 2
J 7 Aaé~
y v7 \
C/N \
/ 7
7 la \ \
& \ \

Y V\y\ \
\ 1

CONCEPT ROAD AND DRAINAGE

LAYOUT SHOWN IS SUBJECT TO

FUTURE STAGE 4 OPERATIONAL] \

WORKS DESIGN AND APPROVAL

v

\

 

 

 

 

 

    
   
   

 

 

 

 

 

 

 

 

|/— PROPOSED SWIMMING POOL
REFER TO ARCHITECTURAL FOR
LANDSCAPING AND FENCING

Ld
« [elel=]

 

 

 

 

5m WIDE

 

 

 

 

 

 

 

 

 

 

 

63% AEP PEAK FLOW
DIVERSION © 900

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STORMWATER
EASEMENT

 

 

 

PEAK FLOWS ABOVE THE 1
ARI STORM TO BE DIRECTED
TOWARDS SWALE

PROPOSED GPT
UPSTREAM OF
BASIN

 

 

 

 

 

 

 

 

 

 

\
LEGEND:
 \ SITE BOUNDARY
— \ sw>_— PROPOSED STORMWATER DRAINAGE
\ CLAW PROPOSED STORMWATER EASEMENT
- \
a 2 RETAINING WALLS
a \ FLOW DIRECTION
\ 7 63% AEP PEAK FLOW DIVERSION
\ = \
\ a DISCHARGE LOCATION
a a> 4-2-4 3 EXISTING SWALE
\
\
\
\
\ \ \ — \ \
\ \ — - \ 7
—\ a - »
\ = a — \
J a
L 7
\ L a \ \
2 a
_ c
\ \ \
\ \ a
a \ <
a“ \ \ — \
- \ ~
\ \
\ \ \ a“
\  \ a
YEAR \ \, a \ —
\ — a \e

   
  
   
  
   
     
 
   
   
 
  

 

(_ EASEMENT

3m WIDE DRAINAGE

\

  

 

 

SPLITTER MANHOLE TO DIRECT 63% AEP
PEAK FLOWS TO BASIN AND MAJOR FLOWS TO

THE PROPOSED SWALE & DRAINAGE EASEMENT PROPOSED STORMWATER DRAINAGE

| DESIGNED TO CONVEY MINOR FLOWS.

(10% AEP) TOWARDS SOUTHERN BASIN.

 

MAJOR OVERFLOWS TO BE DIRECTED
TOWARDS TRADING POST ROAD

 

SPLITTER MANHOLE TO DIRECT 63%
AEP PEAK FLOWS TO PROPOSED
GPT AND OVERFLOWS TO BASIN

 

UPSTREAM OF BASIN

 

 

FILE: B14158.W-SKNI0.dwg_ DATE: 12-11-2015 TIME: 08:49
Pxref's: X_B1\158.W_BASE X_B1\158.W_MODIFIED ARCH X_B14158.W_TITLE ADAM DTM Layer Copy USR: Sam Linde

NOTES:

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
16-001014-01.

 

 

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tar [acs taw] OAT ao TRCROTTN Ne STENT SRRWRG TT
AMENDMENT DETAILS DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES rn

ne 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT ‘CONSULT AUSTRALIA CONCEPT STORMWATER

. Ph (07) 5443 2844 Fax (07) 5443 7146 DRAINAGE PLAN
Fe [OF | 01.08.16 | MINOR AMENDMENTS 1500 10 o 2° 20 1 TIORET 4
Nic caaw onsen] 17200 8 PROJECT No. THROES rf SHEET 1 OF 2
0 B14158,.W AMITHEW HL PED TT PALM LAKES - COOROY Call re ee | _
NIE . Te 07 3895 2444 Focumile 07 3895 $400
br fo OW SEALE OF CALBRE CONSULTING LD PTY LT RETIREMENT COMMUNITY CONSULTING tsen tort tases ew oa tere “BERL B14158.W-SK110 B

 

 

 

Page 63

                 -
               CC___

              BBQ AREA
                         DECK




    OL
  PO




          A
         SP
 __
CC___


[OCR of page images]
 

  
  
   

   

 

 

 

    
  

 

 

 

 

 

 

A | | , \ LEGEND:
PROPOSED SWIMMING POOL Ss PEAK FLOWS ABOVE THE 63% AEP =—_—
REFER TO ARCHITECTURAL FOR STORM DIRECTED TOWARDS DISCHARGE
LANDSCAPING AND FENCING LOCATION B SITE BOUNDARY
| sw PROPOSED STORMWATER DRAINAGE N
(CONCEPTUAL ONLY) \
\ e (=Jel=] Gj CLAW PROPOSED STORMWATER EASEMENT

 

 

 

 

 

 

 

RETAINING WALLS
MAJOR FLOW DIRECTION

Z.

900 STORMWATER 63% AEP
PEAK FLOW DIVERSION PIPE

63% AEP PEAK FLOW DIVERSION

»>
=»
@® DISCHARGE LOCATION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
   

 

 

 

ina a+ 2-44-45 EXISTING SWALE
Dla aaa +) Ub3m WIDE DRAINAGE
| | see ea] | EASEMENT
leas | EE SPLITTER MANHOLE TO DIRECT 63% AEP
; | PEAK FLOWS TO BASIN AND MAJOR FLOWS
i \ TOWARDS SITE DRAINAGE NETWORK
/ os
SOUTHERN BASIN
63% AEP LOW FLOWS | ™.
TO BIORETENTION BASIN
PROPOSED GPT \ Oo I \ 0 *
UPSTREAM OF BASIN SPLITTER MANHOLE TO DIRECT 63%

AEP PEAK FLOWS TO PROPOSED
GPT AND OVERFLOWS TO BASIN

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Xe ane |

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sm WIDE
5m WIDE STORMWATER
STORMWATER EASEMENT
LL ase
f
C00 0Y CONNECTION ROAD
NOTES:
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH CONCEPT PLAN ONLY
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
bee suey sce.ug_ oar. 1-28. ony ie ont ot CONSTRUCTION PURPOSES
Xref's: X_B14158.W_ BASE X_B14158.W_MODIFIED ARCH X_B14158.W_TITLE ADAM DTM Layer Copy USR: Sam Linde a
sar [ones oom OE SEE TEST TRO Te ar TaN TE
AMENOMENT DETAR DesIw cHECK SURVEYOR: KEN HICKS & ASSOCIATES , mn
rr 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CONSULT AUSTRALIA CONCEPT STORMWATER
als 1500 5 ‘0 wat Ph (07) 5443 2844 Fax (07) 5463 7166 | SW DRAINAGE PLAN
nN 1:1000 AB lapPROuD nl 7 H
Kle caawn Gnox PROJECT No, APPROVED SHEET 2 OF 2
ip Bdi58 Ww wesaagat | PALM LAKES - COOROY Calibre Se pene 28 barman oa
. ore

A FOR & ON BERALF OF CALBRE CONSULTNG (LD) PTY LTO RETIREMENT COMMUNITY CONSULTING taowe Gate tare fy Boren Benntnt Tes B14158,W-SK111 A

 

 

 

 

 

 

Page 64

                     -
                   CC___

                  BBQ AREA
                             DECK




        L
  POO




            SPA
 __
CC___


[OCR of page images]
 

SOURCE NODE INP!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

MNOR AMENDMENTS:

FILE: B14158.W-SKNI0.dwg_DATE: 12-11-2015 TIME: 08:49
Pxref's: X_Bt\158.W_BASE X_B14158.W_MODIFIED ARCH X_B14158.W_TITLE ADAM DTM Layer Copy USR: Sam Linde

 

 

‘SUB-CATCHMENT AREA (ha) [IMPERVIOUS %| LEGEND
At_ROAD 0.265 80
‘At ROOF 0.495 100

Ai GROUND 0.225 50 -——_— = =
‘A2 ROAD 0.300 80
‘A2 ROOF 0.641 700. |

A2 GROUND 0.421 50
‘A2 PARK 0.146 0
B2 ROAD 0.648 80
B2 ROOF 1.011 100

B2 GROUND 0.724 50
B3 ROAD 0.594 80
B3 ROOF 0.925 100

B3 GROUND 0.541 50
B4 ROOF 0.300 100

B4 GROUND 0.100 50
B4 PARK 0.649 10
C2 ROAD 0.308 80
C2 ROOF 1.065 100

€2. GROUND 0.651
C3 ROAD 0.750
C3 ROOF 1.398

€3 GROUND 0.781
D2 ROAD 0.249
D2 ROOF 0.369

D2 GROUND 0.433

D2 CAR PARK 0.200

D3 ROAD 0.174

D3 ROOF 0.291

D3 GROUND 0.090

D3 GROUND BYPASS 0.026
TOTAL 14.768

SITE BOUNDARY

MUSIC CATCHMENT

DESIGN CONTOURS

BOUNDARY

EXISTING CONTOURS

IMPERVIOUS AREA

ROOF AREA

 

 

 

 

 
 

 

 

 
 
 
 
 
 
 
 
 
  
 
 

CENTRAL

 

 

 

 

 

 

 

BASIN

 

 

 

  

 

SOUTHERN
BASIN

 

  

 

 

 

bidslasiaslaid
Eee

 

 

 

 

 

 

 

 

   

 

 

 

 

pldlastablasla
APPLET EPrer

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

——COOROY CONNECTION ROAD

 

 

NOTES:

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LATEST ISSUE OF
CALIBRE CONSULTING REPORT No. 16-001014-01.

2. WHILE NOT SHOWN ON PLAN, EACH PROPOSED LOTS WILL HAVE IMPERVIOUS
ROOF AREA (COVERING A MAJORITY PORTION OF TOTAL LOT AREA). AN
AVERAGE ROOF AREA OF 215m? PER LOT WAS MODELLED AS PER TABLE
3.3 OF WATER BY DESIGN'S MUSIC MODELLING GUIDELINES (2010).

=

 

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

 

 

 

 

   

   
    
 

 

FRST [CALCS [DRAWN] _OATE
vesue [cw | 05.02.16

 

AMENDMENT DETAILS.

 

H_[-o [109.16 MNOR AMENDMENTS

 

DESIGN CHECK

1000 1 010

"SCALE (METRES 7

30.4050 Al

 

 

 

 

 

 

 

 

 

=] eo @]>

 

O4zmzozmE>

 

4.2000
DRAWN CHECK|

 

AB

 

MIGROFIUM No,

PROJECT No.

B14158.W

 

SURVEYOR: KEN HICKS & ASSOCIATES

49 THE ESPLANADE MAROOCHYDORE

Ph (07) 5443 2844 Fax (07) 5443 7146

APPROVED ANDREW McPHAIL RPEQ 6921
MATTHEW HLL RPEG 11578

FOR & ON BEHALF QF CALIBRE CONSULTING (QLD) PTY LTO

PALM LAKES RESORT C

 

 

~~ calibre

PALM LAKES - COOROY
RETIREMENT COMMUNITY CONSULTING

 

Callbre Consulting (QLD} Pty Ltd
| Queen

‘Ground Fer, Sere
‘Toephone 07 3895 2444 Facsimile 073895400 shoot
Recere Cuber Hetomw fay Sayre SenheCoat 1c 4004

= ERENT
‘CONSULT AUSTRALIA.
wD

ntact

IMPERVIOUS AREA
PLAN

 

QD Awtcasoon Exes! Saawine NOMBER

 

B14158.W-SK112

 

 

 

Page 65

²


[OCR of page images]
 

7 BIORETENTION BASIN

   
     
      

PROPOSED 6m WIDE
DRAINAGE EASEMENT

 

4 WEIR AT

 

 

 

 

 

 

GPT TO BE PROVIDED
7 UPSTREAM OF

 

 

 

a

RL 98.50

oo [FINAL ROAD AND
DRAINAGE DETAILS TO

 

 

CARPARK
RL 98.82

 

 

 

 

BE CONFIRMED DURING | ™
DETAILED DESIGN

 

 

 

 

 

 

 

 

 

EXTENDED
DETENTION
DEPTH
=11
1 3
g \
§
3
ag BIORETENTION
3 LAYERS

TYPICAL BIOPOD DETAIL
SCALE 1:25 (A1)
SCALE 1:50 (A3)

z ENERGY DISSIPATER SUBJECT

TO DETAILED DESIGN

 

BIOPOD D
FILTER AREA: 25m?

FILTER DEPTH: 0.4m

 

TOTAL BASIN SURFACE AREA: 100m?
EXTENDED DETENTION DEPTH: 0.2m

 

 

0.50m MIN.

EXISTING SURFACE
— oS [

3 a

LEGEND:

NOTES:

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.

16-001014-01,

SITE BOUNDARY

PROPOSED STORMWATER DRAINAGE

PROPOSED STORMWATER EASEMENT

EXISTING SWALE

BIORETENTION FILTER

 

 

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

 

 

 

ALCS,

[DRAW]

DATE

 

@

SC

05.02.16

AMENDMENT DETAILS.

 

OzmzozmE>

 

 

DESIGN CHECK

 

 

 

=m Sole] >

 

 

 

 

 

 

 

DRAWN CHECK|

 

150
1100

1100
4200

ee 43

ee.

"SCALE (METRES 7

MIGROFIM No.

1 2M

PROJECT No.

B14158.W

203 46 5

 

 

SURVEYOR: KEN HICKS & ASSOCIATES
49 THE ESPLANADE MAROOCHYDORE

Ph (07) 5443 2844 Fax (07) 5443 7146

"APPROVED.

ANDREW McPHAIL RPEQ 6921
MATTHEW HILL RPEQ 11578

FOR & ON BEHALF OF CALISRE CONSULTING (QLD) PTY LTO

“CLIENT

PALM LAKES RESORT

 

PROECT

PALM LAKES - COOROY
RETIREMENT COMMUNITY

 

 

Cc

calibre

CONSULTING

(CONSULT AUSTRALIA

NY

Callbre Consulting (QLD} Pty Ltd
Grovrd | i

545 Queen 9 QLD Aurtraia 4000
‘Teophone 07 3895 2444 Facsimile 07 3895 3400
Recers Coburn Katou fay Sep Senscomt 104004

E ‘DRAWING TITLE
‘a0 boot

BIOPOD D2
DETAILS PLAN

 

‘DRAWING NUMBER

 

B14158.W-SK113

 

 

 

Page 66

                                        CALIBRE CONSULTING




APPENDIX H OPERATIONAL WORKS DRAWINGS


[OCR of page images]
CALIBRE CONSULTING

APPENDIX H OPERATIONAL WORKS DRAWINGS

Page 67

 

BIO_RETENTION BASIN CONSTRUCTION SEQUENCE NOTES:
THE CONSTRUCTION AND ESTABLISHMENT OF BIO RETENTION BASINS IS TO BE STAGED AS FOLLOWS:

1.

FUNCTIONAL INSTALLATION - ONCE THE MAJORITY OF THE SUBDIVISION WORKS ARE COMPLETE, THE
BASIN CONSTRUCTION INCLUDING EARTHWORKS, INLETS, OUTLET STRUCTURES, SUBSOIL DRAINAGE,
TRANSITION LAYERS, FILTER MATERIAL, PROTECTIVE LAYERS AND EROSION AND SEDIMENT CONTROL
MEASURES ARE TO BE UNDERTAKEN BY THE CIVIL CONTRACTOR. THE FILTER MEDIA WITHIN THE BIO
RETENTION BASIN IS TO BE COVERED WITH A PROTECTIVE GEOFABRIC LAYER (BIDIM A12 OR
EQUIVALENT), THEN COVERED WITH 75mm OF TOPSOIL AND TURFED OR GRASS SEEDED TO THE
SATISFACTION OF COUNCIL. SILT FENCES ARE TO BE ERECTED AROUND THE OUTSIDE OF THE BASIN.
ACCEPTANCE OF THE COMPLETED SUBDIVISION WORKS ON AND OFF MAINTENANCE BY COUNCIL IS TO
EXCLUDE THE PROTECTIVE LAYERS WITHIN THE BIO BASINS.

BUILDING CONSTRUCTION - THE PROTECTIVE GEOFABRIC AND GRASS LAYER AND THE EROSION AND
SEDIMENT CONTROL MEASURES ARE TO REMAIN IN PLACE DURING THE BUILDING CONSTRUCTION PHASE.
THE BUILDING CONSTRUCTION PHASE IS TO BE THE TIME FOR COMPLETION OF 75% OF THE BUILDING
CONSTRUCTION AND SITE ESTABLISHMENT WORKS ON ALLOTMENTS OR 12 MONTHS FOLLOWING
COMPLETION OF THE SUBDIVISION WORKS, WHICHEVER IS SHORTER. THE MAINTENANCE OF THE BASINS
INCLUDING INLETS, OUTLETS AND EROSION AND SEDIMENT CONTROL MEASURES IS TO BE UNDERTAKEN
BY THE CIVIL CONTRACTOR FOR THE DURATION OF THE BUILDING CONSTRUCTION PHASE.
OPERATIONAL ESTABLISHMENT - FOLLOWING COMPLETION OF THE BUILDING CONSTRUCTION PHASE, THE
TURF, TOPSOIL AND PROTECTIVE GEOFABRIC IS TO BE REMOVED AND THE BASIN RE-PLANTED WITH
VEGETATION AND LANDSCAPING AS PER THE LANDSCAPE DESIGN DRAWINGS. WORKS UNDERTAKEN FOR
OPERATIONAL ESTABLISHMENT ARE TO BE UNDERTAKEN BY OTHERS AND WILL BE SUBJECT TO A
SEPARATE ACCEPTANCE BY COUNCIL FOR ON AND OFF MAINTENANCE.

IN-SITU_INFILTRATION TEST - AN IN-SITU INFILTRATION TEST WILL BE REQUIRED PRIOR TO
ON-MAINTENANCE BEING GRANTED BY COUNCIL. THE TEST WILL NEED TO ACHIEVE AN AVERAGE RATE
OF 180mm/h INFILTRATION (WITHIN APPROPRIATE TOLERANCES) WITH AT LEAST 4 SAMPLE LOCATIONS
AROUND THE BASIN. ANOTHER IN-SITU INFILTRATION TEST WILL BE REQUIRED FOR OFF-MAINTENANCE.

BIO RETENTION PARTICLE SIZE DISTRIBUTION AND PROPERTIES GUIDE:

BIO_RETENTION INSTALLATION NOTES:

THE PLACEMENT OF DRAINAGE, TRANSITION AND FILTER MEDIA
LAYERS MUST BE UNDERTAKEN CAREFULLY TO ENSURE CORRECT
DEPTH, SLOPE AND COMPACTION:

DEPTH: FILTER MEDIA SHOULD BE INSTALLED AND COMPACTED IN
TWO LIFTS FOR DEPTHS OVER 500mm.

SLOPE: THE TOP SURFACE OF THE DRAINAGE LAYER, TRANSITION
LAYER AND FILTER MEDIA LAYER SHOULD BE FLAT. A
SPREADER BAR SHOULD LEVEL THE SURFACE OF EACH LAYER.
COMPACTION: THE FILTER MEDIA MUST BE LIGHTLY COMPACTED
DURING INSTALLATION TO PREVENT THE MIGRATION OF FINE
PARTICLES. THIS CAN BE ACHIEVED WITH A SINGLE PASS OF A
LIGHT ROLLER SUCH AS A DRUM LAWN ROLLER. A VIBRATING
PLATE CAN ALSO BE USED TO COMPACT SMALL BIO RETENTION
SYSTEMS OR ‘POZITRACK’ BOBCATS CAN BE USED FOR LARGE
SYSTEMS. ENSURE ONLY ONE COMPACTING PASS IS MADE OVER
THE MEDIA FOR LIGHT COMPACTION.

ROCK ARMOURING NOTES:
14. ROCKS TO BE DURABLE BLUE STONE OR OTHERWISE
APPROVED BY SUPERINTENDENT.
2. EACH ROCK SHALL BE:
- ANGULAR IN SHAPE (PROMOTES INTERLOCKING)
- FREE FROM OVERBURDEN, SPOIL, SHALE AND
ORGANIC MATERIAL.
3. NEITHER BREADTH NOR THICKNESS OF A SINGLE ROCK SHALL
BE LESS THAN ONE HALF ITS LENGTH {ie THE ROCK SHALL
BE CHUNKY RATHER THAN FLAT).
4. ROCKS TO BE PLACED AND INTERLOCKED INTO POSITION AND

150 SUBSOIL DRAIN CLEANOUT
- PVC PIPE (NON SLOTTED) AND
CONNECTOR CLEANOUTS AT HEAD

GRAVEL DRAINAGE LAYER -
DEPTH 200mm. (NO FINES)

SOURCE: (BIOFILTRATION MEDIA GUIDELINES (VERSION 3.01), PREPARED BY THE FACILITY FOR ADVANCING
WATER BIOFILTRATION (FAWB), JUNE 2009.) & (BIO-RETENTION TECHNICAL DESIGN GUIDELINES (VERSION 1)

PREPARED BY ‘WATER BY DESIGN’ (OCTOBER 2012)

MATERIAL COMPOSITION RANGE GUIDE:

CLAY AND SILT <3% (<0.05mm)
VERY FINE SAND 5-30% (0.05-0.1Smm)
FINE SAND 10-30% (0.15-0.25mm)
MEDIUM TO COARSE SAND 40-60% (0.25-1.0mm)
COARSE SAND 71-10% (1.0-2.0mm)
FINE GRAVEL <3.0% (2.0-3.4mm)

WHILE TOTAL CLAY AND SILT CONTENT OF 3% IS RECOMMENDED, A CLAY AND SILT CONTENT UP TO 6%
IS ACCEPTABLE PROVIDED:

THE SATURATED HYDRAULIC CONDUCTIVITY IS BETWEEN 100mm/hr & 300mm/hr AND
THE REMAINING MATERIAL MEETS THE COMPOSITION RANGE SPECIFIED ABOVE.

SOIL_SPECIFICATIONS:

FOREBAY SLAB - 125mm THICK

ENDWALL
CONCRETE, SL62 REINFORCING, 50 TOP COVER ee
SLEEVES AT 0.5m CENTRES
m —— 100 AG PIPE
REFER DETAIL A 100% ROCK SCOUR PROTECTION OVER
1 | ti) __ GEOFABRIC TO PERIMETER OF
dh L SRR FOREBAY WEIR AT 1.0m CENTERS.
z ZG Z
YSIS SSSPS SY <| g
USINSITU SOIL TO REMAIN UNDER SAAS \ g|
COARSE, SEDIMENT, FOREBAY, RRR, L= NO FINE CONCRETE

TOTAL NITROGEN CONTENT - <1000mg/kg

ORTHOPHOSPHATE CONTENT - <80mg/kg SOILS WITH TOTAL PHOSPHORUS CONCENTRATIONS >100mg/kg
SHOULD BE TESTED FOR POTENTIAL LEACHING. WHERE PLANTS WITH MODERATE PHOSPHORUS
SENSITIVITY ARE TO BE USED, TOTAL PHOSPHORUS CONCENTRATIONS SHOULD BE <20mg/kg)

ORGANIC MATTER CONTENT - AT LEAST 3% (w/w). AN ORGANIC CONTENT LOWER THAN 3% IS
LIKELY TO HAVE TOO LOW A WATER HOLDING CAPACITY TO SUPPORT HEALTHY PLANT GROWTH. IN
ORDER TO COMPLY WITH BOTH THIS AND THE TOTAL NITROGEN AND ORTHOPHOSPHATE CONTENT
REQUIREMENTS, A LOW NUTRIENT ORGANIC MATTER WILL BE REQUIRED.

pH - AS SPECIFIED FOR ‘NATURAL SOILS AND SOIL BLENDS’ 5.5-7.5 (pH 1:5 IN WATER)

ELECTRICAL CONDUCTIVITY - AS SPECIFIED FOR ‘NATURAL SOILS AND SOIL BLENDS’ <1.2 dS/m.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: LAY GEOFABRIC OVER INSITU SOIL.
(EXTEND MINIMUM 300mm UNDER FOREBAY)
PIN GEOFABRIC TO INSITU SOIL AND FORM
CONCRETE ONTO GEOFABRIC.

BUILT UP TO FINAL LEVELS SHOWN, ENSURING COVERAGE OF

GEOFABRIC.

GAPS BETWEEN THE ROCKS ARE TO BE FILLED BY DROPPING
SMALL ROCKS INTO GAPS AND LOCKING INTO POSITION WITH

A CROWBAR.

Cl. CAP. EXTEND CAP TO
APPROX. 50-100mm ABOVE
BIORETENTION SURFACE. SCREW

  
  
 
 
  
   

CAP FIXED USING 3 ~\

OF SUBSOIL DRAIN AND AS
SHOWN ON PLAN

5-7mm AGGREGATE

UPVC JOINT FOR
RISER CONNECTION
TO SLOTTED PIPE

EPOXY SADDLE JOINT
TO TRUNK MAIN

200m W x 150m D CONCRETE
SURROUND TO CLEANOUT RISER

YW

    

  

 

 

COLLECTOR PIPE MAX 2.5m SPACINGS

BIO RETENTION BASIN SUBSOIL DRAIN

CLEANOUT AND FILTER MEDIA SPECIFICATIONS

PROVIDE 300mm THICK CONCRETE
INFILL ENDWALL AROUND PPE)

SCALE: 1:20(A1)

0.15m_ MIN ALL AROUND

 

FILTER MEDIA LOAM -

  

400mm DEPTH CONSISTENT WITH
CURRENT FAWB SPECIFICATIONS.
FILTER MEDIAN PARTICLE DIA
0.45m MIN. HYDRAULIC
maf CONDUCTIVITY 200mm/hr
|

COARSE SAND TRANSITION
LAYER - 100mm DEPTH
(imm PARTICLE DIA.)

PROVIDE BIDUM A12 OR

i Cievennenieeiel EQUIVALENT TO EXTENTS

SMOOTH WALLED SLOTTED PVC
PIPE- MIN 0.5% GRADE AND

 

NOTE:

 

I

| yt

 

OT

 

 

 

APPROPRIATENESS OF GEOTEXTILE LINER AS
AN ALTERNATIVE TO HDPE LINER TO BE
ASSESSED BY GEOTECHNICAL ENGINEER AT
CONSTRUCTION STAGE FOLLOWING TESTING OF

6. ALL ROCKWORK TO BE PLACED OVER BIDIM A24 OR
EQUIVALENT.

7. FOR ROCK SIZED SPECIFIED AS Dso ON THE DRAWINGS, THIS
CORRESPONDS TO THE MEDIAN DIAMETER OF WHICH HALF OF
THE ROCK SIZES SHALL BE GREATER AND HALF OF THEM
SHALL BE SMALLER. THE ROCK SHALL BE WELL GRADED
AND HAVE A MAXIMUM SIZE NO GREATER THAN 30% AND A
MINIMUM SIZE NO LESS THAN 30% SMALLER THAN Dso. FOR
EXAMPLE IF Dso = 400mm IS SPECIFIED, THE EQUIVALENT
ROCK DIAMETER RANGES FROM 280 to 520mm.

TURF REINFORCED WITH ENKAMAT OR

APPROVED EQUIVALENT INSTALLATION NOTES:

1. PREPARE AND COMPACT BASE SURFACE. EXCAVATE ANCHOR
TRENCHES AT TOE AND SHOULDER OF BANK, TO BE
BACKFILLED AFTER LAYING TURF.

2. LAY ENKAMAT OR APPROVED EQUIVALENT AND PIN TO
MANUFACTURERS SPECIFICATIONS.

3. LAY TOPSOIL AND PLACE TURF.

SAFETY FENCE TO

LANDSCAPE ;
ARCHITECTS DETAIL————~—

 

PERMEABLE
GEOTEXTILE
MEMBRANE

GRANULAR FILL:

 

 

 

 

1.0m WIDE, 0.45m DEEP, 0.20m INSITU_ SOILS.

 

 

THICK CONCRETE (SL81 MESH
CENTRAL) SUPPORT UNDER PIPE

TYPICAL OUTLET THROUGH ROCKWALL DETAIL
SCALE 1:50 (A)

REFER DRG. 16-001014-105
FOR FURTHER ROCK
BOULDER WALL DETAILS

   
  

300mm

 

TEMP. PONDING LEVEL

 

 

BASE OF
BIO RETENTION
FILTER MATERIAL

SAFETY FENCE TO
LANDSCAPE y
ARCHITECTS DETAIL.

REFER

    
  
 

 

    
   
   

PERMEABLE
GEOTEXTILE
MEMBRANE

300mm

GRANULAR FILL:

 

100D AG PIPE

NO FINE CONCRETE:

DRG. 16-001014-105

FOR FURTHER ROCK
BOULDER WALL DETAILS

TEMP. PONDING LEVEL

BASIN SL: 100.05m AHD

BASE OF
BIO RETENTION
FILTER MATERIAL

 

 

 

WOOE

 

Ee
SOUTHERN BIO-RETENTION BASIN TYPICAL

 

w
Ss
Ss
3
3

 

CENTRAL BIO-RETENTION BASIN TYPICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

TYPICAL SECTION THROUGH FOREBAY DETAIL A RETAINING WALL SECTION
SCALE 150 (41) SCALE 120 (A1) RETAINING WALL SECTION SCALE: N.T.S.
SCALE: N.T.S.
N.S.C. REF NO. MCU15/0111 & REC15/0031

fst [ccs oem] _oaTE [AMENDMENT DETAILS DesIGN CHECK sous (ems) menor SURVEYOR: ML SURVEYS oer a —
afk $ 7 oo ISSUED FOR CONSTRUCTION — PENOING COUNCIL APPROVAL cM to 1 0s 1 aM 78, Leybourne TBE [email protected] _PAM LAKE WORKS PTY LTD " CONSULT AUSTRALIA eae ortAIe
fe eam cnr] 1° 2) meget, [ame 1 PALM LAKE RESORT ih core cnaig (0 Py ny
é D 16-001014 y ANDREW MCPHAIL RPEQ 6921 COOROY Ca I re Grae Fr, 55 Quen Sr, Bore, GL Ain 400 ESOS FSS area pease roy
8 F cM 6-0010 ron » ov bout caste YnsieTHG (ato) PTY LT STAGE 2 CONSULTING Ce sts nos tn Se snc ‘oi 16-001014-400 A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 68

 

—=

 

 

 

 

  
   

      

        

NOTE, 4 aa eee / LEGEND
REFER TO LANDSCAPE ARCHITECT 7 —_aN a Ne sbo—____ EXISTING SURFACE CONTOUR
DRAWINGS FOR BIO-RETENTION BASIN / _ ~ a <=} \. \. EXISTING SURFACE CONTOUR
~
BATTER TREATMENTS AND BASIN PLANTING / ea wee RN \ . BATTERS (GRADE AS SPECIFIED)
// pRoPOsED 1200 x 1200 FIELD INLET EXISITNG 900 STORMWATER PIPE TO CONVEY . \ PROPOSED ROCK RETAINING WALL
“PRIMARY OUTLET PIT TO DIVERT PEAK FLOWS OF THE 63% ARP STORM EVENT, ,
NOTE: 63% ARP PEAK FLOWS TOWARDS TO BE EXTENDED APPROX. 3.8m EXACT \ CONCRETE SLEEPER RETAINING WALL
REFER TO DRG. 16-001014-110 FOR CARPARKY »” CENTRAL BASIN (RL 102.0mAHD) LOCATION TO BE DETERMINED ON SITE 7 PROPOSED STORMWATER PIPE

SETOUT AND DETAILS.

 

 

 

NOTE:
REFER TO DRG. 16-001014-400 FOR TYPICAL
WATER QUALITY NOTES AND DETAILS

 

 

 

 

 

 

 

 

 

 

 

  

  
  
  
  

 

 

 

   
  

   

 

RL 103.00
RL 102.00

 

 

 

1 h
PROPOSED 1200 x 1200 FIELD INLET

 

\
‘
EXISITNG @900 STORMWATER PIPE

\ TO CONVEY PEAK FLOWS ABOVE
\ THE 63% ARP STORM EVENT

  

 
 
  
 
  
 

   

  
 
 

 

 

   
 

 

 

    

  
    
 
 

 
  
   
 
 
 
 
  
  
  

    

 
  

   
 
 

 
  
  
  
   
 

  
  
 
 
 
 
  
     
  

 

225® SUBSOIL COLLECTOR
100@ SUBSOIL AND CLEANOUT POINTS

SAFETY FENCE - REFER LANDSCAPE
ARCHITECT PLANS FOR DETAILS.
ROCK ARMOURING SCOUR PROTECTION
TURF REINFORCED WITH ENKAMAT
OR APPROVED EQUIVALENT

Q100 OVERLAND FLOW

BIORETENTION BASIN FILTER MEDIA
REFER DRG. 16-001014-400 FOR DETAIL

 

 

  

 
   
   
  
  
  

 
 
 

/- BOW SECONDARY OUTLET PIT TO CONVEY \
PEAK FLOWS ABOVE 63% AEP

, STORM EVENT (RL 102.3mAHD) » BASIN SETOUT TABLE
/ \ \\ : \\> an POINT No, | EASTING | NORTHING | RL
, 4 805.831 872.253 703.000
/'m WALL HEIGHT) SAFETY FENCING TO eek 802533876855 104.710

im —
BE PROVIDED ALONG RETAINING WALL F orene sone teoo
= 794.697 887.000 102.000
793.148 885.735 101.700
781.694 887.842 102.000
TOW = RL 103.30 783.067 886.388 101.700
ow = fu ass OUTHERN BASIN (BIORETENTION SYSTEM ROCK PROTECTION nae ees ee
y FLIER AREA = 310m® Vx, so = 100mm T4246 878.146 102.550
~ SURFACE LEVEL = 101.7m AWD 778.613 (875.306 101.700
~ FILTER DEPTH = 0.4m Wy 782.073 871.642 101.700
Wo TEMPORARY PONDING DEPTH . 789.155 868.824 101.700
VSN PROVIDE 0.5m WIDE MIN. ROCK SCOUR th 789.149 868.344 101.750
\ Te Pe STON OF MALE TERGENCY 5 792.109 867.858 107.750
\ OF NL = : Dep = 200mm 16 788.792 866.168 101.900
>a row LOW SALE 256 PIPE TO OUTLET THROUG THICKNESS = 300mm ” 191.752 865.683 ‘101.870
/ REFER TO DRG. NO. ASE OF WALL I.L.101.710, 8 785.565 859.057 103.117
7 ¢ ~001014- ERER DRG. 1e—001014-600 FOR 9 788.469 857.904 103.102
JON 16-001014-402 FOR

\ / “ SS TYPICAL SECTION 20 784.287 857.690 103.254
2.5m WIDE KERB” 2 786.346 855.509 103.299
BREAKOUT FOR = /y 22 783.900 857.325 103.262
OVERLAND FLOW ~ Rt_101.70 B 785.959 _ 855.143 103.307

 
 

   

 

 

 

  

EXISTING 900% PIPE TO
CONVEY MINOR DESIGN
STORM (Q10) FROM FUTURE

    
 

 

 
 

  
   
  
    

     
   
 

1
1
1
\

  
 

7
“
uv
HUMEGARD GPT
_-REFER TO DRG |
<< NO, 16-001014-115 |
FOR DETAILS \

A

XN 1
\ !
se!

SPLITTER MANHOLE TO
DIRECT 3 MONTH ARI PEAK
, FLOWS INTO GPT AND
7 LARGER EVENTS DIRECTLY
INTO SOUTHERN BASIN

  

.

ia 4 e
‘e@

  

<
TO BE CONFIRMED ON SITE —’
i

I

CUSTOM CONCRETE
HEADWALL EXACT LOCATION ®

 
 
  
   

RL 103.65 '
RL 102.875 Hy

 

 

 

PAD RL 103.65m AHD

!
3.0m WIDE BASIN \ fo
| ACCESS TRACK.
'

\
(
'
\
l
l

1
MAINTENANCE ACCESS GATE
TO BE IN ACCORDANCE WITH 7
POOL SAFETY GUIDELINES I

   

 

TOW
BOW

RL 103.65
RL 102.20

  

 

 

 

1
\
1
{ | /
1
1
I

: /
STORMWATER DRAINAGE SIZED
FOR 63% AEP STORM EVENT ~~

    
  

  
  

/

    

HUMEGARD GPT
REFER TO DRG
NO. 16-001014-116
FOR DETAILS

SPLITTER MANHOLE TO DIRECT 1
YEAR ARI PEAK FLOWS INTO
SOUTHERN BASIN AND LARGER
EVENTS NORTH

    
 
  

 
 

\

N.S.C.

 
 
    
 
 
  
  

   
   
  
 
 
   
 
  
   

   
   
    
  
  
  
      

 

 

7

~
. REF NO. MCU15/0111 & REC15/0031

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a one a TATTERED WERANI—ve cr San TIE
A Fe mest CRETE ins 38 Leybourne Street, Chelmer OLD 4068 PALM LAKE WORKS PTY LTD contenu SOUTHERN BIORETENTION

ae a: : CM [wt 0 1 2 3 as Hob: 0412 744 223 E: [email protected] | BASIN LAYOUT PLAN

ie poe oe a vee ne PALM LAKE RESORT Calibre «—«-_- RS 22 ems

Ne cM 16-001014 ( COOROY TWephine 07 3895 3444 Focsinfe 07 3895 200 Samany | PRAWO a
SIF FOR & OW BEHALF OF CALIBRECONSULTING (QLD) PTY LTD STAGE 2 CONSULTING ane Cat tates Syn Sgn Stina 48 16-001014-401 A

 

 

 

Page 69

 

LEGEND

63% AEP BASIN WATER
SURFACE LEVEL R.L. 102.30m AHD

TEMPORARY PONDING
DEPTH R.L. 102.00m AHD

DESIGN SURFACE

STRUCTURE 5/R CUSTOM GRATE
FOR 1200mm x 1200mm INLET.
REFER |.P.W.E.A.Q. STD. DRG.

D-0050 FOR ADDITIONAL DETAILS.

 

PRIMARY OUTLET PIT SIZED
FOR 63% AEP STORM

TEMPORARY PONDING DEPTH

BIO-RETENTION FILTER MEDIA AND
DRAINAGE LAYERS. REFER DETAIL
ON DRG. 16-001014-400

STRUCTURE 1/Q CUSTOM GRATE
FOR 1200mm x 1200mm INLET.
REFER |.P.W.E.A.Q. STD. DRG.

D-0050 FOR ADDITIONAL DETAILS.

RL_102.30m_ AHD

 

 

 

 

4

— SECONDARY OUTLET PIT

SIZED TO CONVEY STORM
EVENTS ABOVE 63% AEP.

 

1200mm x 1200m FIELD INLET.

 

 

 

 

 

 

 

 

SECONDARY 900 OUTLET PIPE TO
CONVEY PEAK FLOWS ABOVE 63% AEP
STORM EVENT TO GULLY PIT IN
TRADING POST ROAD CUL-DE-SAC

PRIMARY 900 OUTLET PIPE TO———_|
CONVEY 63% AEP DESIGN
FLOWS TO CENTRAL BASIN

 

 

 

 

INFILTRATED FLOWS

BIO-RETENTION BASIN SPECIFICATIONS DIRECTED INTO

 

 

 

 

 

 

 

 

 

 

 

4. FILTER SURFACE LEVEL - RL 101.70m PRIMARY PIT S/R
2. FILTER MEDIA AREA - 310m?
3. EXTENDED DETENTION DEPTH - 300mm
4. TOP OF WALL LEVEL - RL 103.00m (MIN.) TYPICAL BASIN DETAILS ©
5. SPILLWAY - RL 102.70m SCALE: N.T.S.
SAFETY FENCE 0.30m MIN.
TO LANDSCAPE - SITE 1 -
S
ARCHITECTS DETAILS. jae aha 1 REFER DRG. 16-001014~105 Bi 103.65m_ AHD
FOR FURTHER CONCRETE
~ CARPARK - Al SLEEPER WALL DETAILS
oS x
=
NOTES: BASIN RETAINING WALL ot x =, x5 a5
REFER TO DRG. 16-001014-105 AND 16-001014-400 REFER TYPICAL DETAIL i

 

 

 

  

FOR TYPICAL BOULDER WALL CONSTRUCTION DETAILS ON DRG. 16-001014-400

 

 

 

 

 

LOW FLOW CHANNEL (ROCK)
Dsp = 100mm, 100mm THICK,
200mm DEEP KEYS,
LONGITUDINAL GRADE AT 0.5%

 

PB
°
a
3
50mm

Dsp_NOTE:
Ds) ON THE ENGINEERING PLANS SHOW ROCK WORKS DENOTED AS HAVING
SIZES OF Dsp. Ds9 CORRESPONDS TO THE MEDIAN DIAMETER OF WHICH
HALF OF THE ROCK SIZES SHALL BE GREATER AND HALF OF THEM SHALL
BE SMALLER. THE ROCK SHALL BE WELL GRADED AND HAVE A MAXIMUM
SIZE NO GREATER THAN 30% SMALLER THAN Dso AND A MINIMUM SIZE
NO SMALLER THAN Dsp. FOR EXAMPLE IF Dsp = 200mm IS SPECIFIED, THE
EQUIVALENT ROCK DIAMETER RANGES FROM 140mm TO 240mm.

ROCK ARMOURING BEHIND WALL
ROCK SIZE: Dsp = 200mm, 300mm THICK.
SEE Dsp NOTE ASIDE.

Om MIN.

 

 

 

 

- SITE 1-

TOP OF
RL_103.65m_AHD
pe te.bom AND

WALL

 

   

 

9.00m MIN. LOWERED SECTION OF WALL

    

 

RL_103.00m_AHD

 

 

BIO-RETENTION —“
LAYERS

RL_102.70m_ AHD
>

 

 

 

 

 

L GEOTEXTILE FABRIC

 

 

 

TYPICAL LOW FLOW

 

 

(8 " SECTION DETAIL
SCALE: N.T.S.
TOP OF WALL
2.5m WIDE BREAK IN RL 103.00

 
 
 
 
  
 

SAFETY FENCE
TO LANDSCAPE

ARCHITECTS DETAILS.

KERB FOR OVERFLOW REFER LANDSCAPE ARCHITECTS DRAWINGS FOR DETAIL IN THIS AREA

EXISTING CONCRETE
DRIVEWAY CONSTRUCTED
AS PART OF STAGE 1A
WORKS

—

 

2.00m_ TYP

  
 

 

   

~ CARPARK - 2.0% MIN.

 

 

1.0m MAX

 

 

 

+ BASIN RETAINING WALL

REFER TYPICAL DETAIL
ON DRG. 16-001014-400

REINFORCED TURF WITH ENKAMAT
OR APPROVED EQUIVALENT

  

 

  

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

Sar ese
SCALE (A3):1:100
N.S.C. REF NO. MCU15/0111 & REC15/0031

we escieiiand “ 38 Leybouene Street. Chelmer QLD 4068 PALM LAKE WORKS PTY LTD a SOUTHERN BIORETENTION
4 A ISSUED FOR CONSTRUCTION ~ PENDING COUNCIL APPROVAL cM to 10s 0 1 a Mob: 0412 744 223 E: [email protected] —_ ) iy u BASIN SECTIONS
Nic prawn cueck | 1° 43 PROMECT Wo, ‘APPROVED PALM LAKE RESORT | Calibre Consuting (QLD) Pty Ltd a
é D 7 La ANDREW MCPHAIL RPEQ 6921 COOROY calibre he es ee Company | DRAWING NUMBER Te8ue
8 f cM 16-001014 FOR & ON LJ OF CALIBRE CONSULTING (QLD) PTY LTD STAGE 2 CONSULTING oe tales Eason oe vot 16-001014-402 A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 70

 

 

WQCP_(POND) SPECIFICATIONS

NORMAL OPERATING LEVEL: RL 99.20

NORMAL OPERATING AREA: 1940m?

PERMANENT PONDED VOLUME: 1,845m?
TEMPORARY PONDING SURFACE LEVEL: RL 99.60
EXTENDED DETENTION DEPTH: 400mm

DEEP WATER ZONE SURFACE AREA: 1,400m?
MACROPHYTE PLANTING AREA: 540m?

NOTIONAL DETENTION TIME: 48.4 hrs
EQUIVALENT PIPE DIAMETER: 55mm

 
    

 
  

all | LU

TENNIS COURTS

 
  

RETAINING WALL
(SLEEPERS)

 

 

    

ROCK RETAINING WALL

    
   
 
  
  
  

 

 

 

10m OVERFLOW WEIR
RL 100.90

 

Ne

 

warnaunfune

ACCESS GATE FOR —%4
MAINTENANCE

 

'
ee
!
ROCK RETAINING WALL

CARETAKERS
SHED

 
   
 
 

WATER QUALITY CONTROL POND
(INCLUDING DETENTION STORAGE)

 

 

 
 
 

 

 

 

 

 

 

   
 
 

 

 

‘a:

 

Swo:

CARPARK DESIGN TO BE
CONFIRMED DURING
DETAILED DESIGN PHASE

 
 
 
  
 
 
  
  

 

 

 

 

 

——| REFER TO STAGE 1A

7——| OPERATIONAL WORKS

DRAWINGS FOR ROAD AND
DRAINAGE LAYOUT

 

 

 

 

0s.

x RETAINING WALL ‘
PROPOSED SAFETY 5 (SLEEPERS)
LEGEND:

 
 

 

FENCE

 
  

DESIGN SURFACE CONTOUR
{0.2m INTERVALS)

BATTERS (GRADE AS SPECIFIED)

 

 

   

Ley
fe ast PROPOSED BOULDER RETAINING WALL
; \
I
x i= y Vw f PROPOSED SLEEPER RETAINING WALL
GROSS POLLUTANT SWIMMING POOL PROPOSED FENCE

TRAP (GPT) " EXISTING STORMWATER PIPE

   

AND SPA
=
PROPOSED STORMWATER PIPE
FUTURE STORMWATER PIPE

100@ SUBSOIL AND CLEANOUT PITS
SUBSOIL COLLECTOR

 

 
   
 

 

 

  

 

    
 

   

CENTRAL
erties ROCK SCOUR PROTECTION
\ ING CUT
4 FILL
CENTRAL BASIN NST : ahd MACROPHYTE ZONE
1. FOR THE ENTIRE NEW EMBANKMENT AREA STRIPPING OF VEGETATION AND ANY HIGHLY ORGANIC TOP SOILS AND
ANY SOFT CLAYS TO DEPTHS OF APPROXIMATELY 0.3m IS REQUIRED. Faas, REINFORCED TURF
2. THE STRIPPED SURFACE AND EMBANKMENT FOUNDATION IS TO BE INSPECTED AND TESTED BY A GEOTECHNICAL
ENGINEER. TSE MAINTENANCE ACCESS TRACK
3. SUBJECT TO THE GEOTECHNICAL ENGINEER INSPECTION EXCAVATION OF A CUTOFF KEY ALONG THE NEW (REINFORCED TURF)
EMBANKMENT CENTRELINE AT LEAST 0.5m - 1.0m INTO THE FOUNDATION MATERIALS SHALL BE REQUIRED.
CLUB HOUSE 4. POND TO BE LINED WITH IMPERVIOUS SURFACE, ie: CLAY OR OTHER APPROVED MATERIAL, i.e. BELOW NOL RL NOTES:
21.200. ee
1. REFER TO LANDSCAPE ARCHITECTS DRAWINGS FOR PLANTING

5. THE CLAY FILLING FOR THE WETLAND SHOULD BE PLACED IN TWO HORIZONTAL LAYERS OF 150mm THICKNESS.
CLAY LINER SHOULD HAVE A MINIMUM THICKNESS OF 300mm AND COMPACTED TO A DENSITY RATIO WITHIN THE:
RANGE 98% - 102% STANDARD COMPACTION (AS 1289.5.1.1). PLACEMENT MOISTURE CONTENTS SHOULD BE
WITHIN THE RANGE OMC - 1% TO OMC + 2% (WHERE OMC = OPTIMUM MOISTURE CONTENT FOR STANDARD
COMPACTION).

6. CLAY LINER SHOULD HAVE A MAXIMUM HYDRAULIC CONDUCTIVITY OF 1x10"? m/s.

7. NON-DISPERSIVE CLAYS ARE DESIRABLE.

8. TOPSOIL MUST BE TESTED BY N.A.T.A. ACCREDITED LABORATORY IN ACCORDANCE WITH A.S. 4419 (SOILS FOR

\ LANDSCAPING AND GARDEN USE) AND SHOULD BE PLACED TO A MINIMUM DEPTH OF 300mm.

DETAILS.

‘ /

BIORETENTION BASIN SPECIFICATIONS
1. FILTER MEDIA AREA: 200m?

2. FILTER DEPTH: 0.4m
3.
4,

 

2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LATEST
ISSUE OF CALIBRE CONSULTING REPORT No. 16-001014-01,

 

3. REFER TO DRG No. 16-001014-403 TO 16-001014-406 FOR

EXTENDED DETENTION DEPTH: 0.3m BASIN SETOUT DATA.

BASIN SURFACE LEVEL: 100.05m AHD
4, REFER TO DRG No. 16-001014-400 FOR GENERAL NOTES AND

 

 

 

 

 

 

 

 

 

 

 

 

9. TOPSOIL MAY BE TREATED WITH GYPSUM OR LIME.
10. TOPSOIL LAYER (OVER CLAY LAYER) REQUIRED FOR MACROPHYTE PLANTING AREAS. DETAILS.
N.S.C. REF NO. MCU15/0111 & REC15/0031
ad pesian cree aussie? tweroreu"® | suRVEYOR: ML_SURVEYS os y | mane rms
a ote Lees —==="" 38 Leybourne Street, Chelmer QLD 4068 PALM LAKE WORKS PTY LTD _ oan , CENTRAL BASIN
it 00 2 0 2 6 6 8 oo At Mob: 0612 744 223 E: [email protected] | = >) wih q] LAYOUT PLAN
PROJEC' a ab
ble peawn cneck| 0° “% T Wo. ‘APPROVED PALM LAKE RESORT H Calibre Consuing (QLD) Pty Lid |
¥p 16-001014 1Q, ANDREW MCPHAL RPE 6921 COOROY C re cee aan See bas ae =e
N = in 3400
3 E ex FOR_& ON BEHALF OF CALIBRE CONSULTING (LD) PTY LTD STAGE 2 CONSULTING ‘Mahe Cer Mbourss Spdeey Shywpre Qemnhine Coat ‘tie 16-001014-403

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 71

 

 

fog

Sf fs
Jf

Us
; / 2
P io : ~

= TYPICAL RETAINING WALL DETAIL
~ PROVIDED ON DRG NO. 16-001014-400

— cf
awe Lor fo “

/

RL_97.20m AHD

 

REFER TO OPERATIONA\
WORKS DRAWINGS FOR ROAD ~.~
AND DRAINAGE DETAILS t

  
 
 
  
  
 
  

GENERAL _NOTES:
1. REFER TO LANDSCAPE ARCHITECTS DRAWINGS FOR PLANTING

DETAILS.

THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE
LATEST ISSUE OF CALIBRE CONSULTING REPORT No. 16-001014-01.

REFER TO DRG No. 16-001014-403 AND 16-001014-407 FOR
LEGEND AND BASIN SETOUT DATA.

REFER TO ORG No. 16-001014-400 FOR GENERAL NOTES AND
DETAILS.
N.S.C. REF NO. MCU15/0111 & REC15/0031

 

—_
-406

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ae verans ewan cose — norms" SURVEYOR: ML_SURVEYS “ Pr owe" CENTRAL BASIN
an C2) ow nen Fe PLE AE asreyeuicaveystoncy |__PALM LAKE WORKS PTY LTD Cc» ~~ FE SETOUT PLAN
HG Dnawn cneox| ‘20° ” PROJECT Wo APPROVED PALM LAKE RESORT alibi CalbreConsuing (LD) Pty Li 2 SHEET 1 OF 4

D RE _
E 16-001 1a ANDREW MCPHAIL RPEQ 6921 COOROY C | re Gains rt n,Q fot sara aia -_
if cM B-001014 a har fal Pere STAGE 2 CONSULTING Ihe 7 SU Fine 7500 16-001014-404

 

 

 

 

 

 

 

 

Page 72

 

  
      
  
     
  
 
 
   
 
   
     
  
       
       
   
  

ROCK SCOUR PROTECTION
WIDTH = 1.5m MIN. FROM BASE OF WALL
Dsp = 300mm

THICKNESS = 600mm ROCK SCOUR PROTECTION N

Dso = 300mm \
THICKNESS = 600mm

 

—_ FLOWS TO EXISTING SWALE
~ BASE WIDTH = 3m

REINFORCED TURF

   

+ ¥> + + %
=MAJOR OVERFLOW WEIR FOR DETAILS
“REFER TO ORG No. 16-001014-410

CARETAKERS BUILDING

 

FINAL LEVELS OF CARETAKERS BUILDING
AND CAR PARK TO BE CONFIRMED
DURING DETAILED DESIGN PHASE

 

 

 

  
   

oS
WS
7 N
. SOs S
oN a
\

SSS TURNING AREA FOR) \
\ MAINTENANCE

\ VEHICLE
\ \
\ \
MAINTENANCE

ACCESS TRACK
(REINFORCED TURF) \

 

BOWLING GREENS
RL 102.30m AHD

 

 

  

 

  
 

GENERAL NOTES: _
1. REFER TO LANDSCAPE ARCHITECTS DRAWINGS FOR PLANTING =
DETAILS.

   
 
    

2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE
LATEST ISSUE OF CALIBRE CONSULTING REPORT No. 16-001014-01....

 
    

3. REFER TO DRG No. 16-001014-403 AND 16-001014-407 FOR
LEGEND AND BASIN SETOUT DATA.

4. pee go ORG No. 16-001014-400 FOR GENERAL NOTES AND N.S.C. REF NO. MCU15/0111 & REC15/0031

 

cer DRAWING TITLE
‘cauce [omawe] _ DATE pasion creck “SCALE METRES) THCROFEM No.

AMENOMENT DETAILS SURVEYOR: ML_SURVEYS i CENTRAL BASIN

M foe 38 Leybourne Street, Chelmer QLD 4068 PALM LAKE WORKS PTY LTD coun
Ce Mob: 0412 744 223 E: [email protected] t > wD | SETOUT PLAN

snow ue FRONT ml HEET 2 OF 4
mn * ha | ANOREW HCPHAIL RPEA. 6921 PALM GORE AESORT Soe Sant ei ey s
108001

Pet ge Ee pd
Ground Flor, 545 Queen Steet, Bsbon, QLD Asoka 4000 THAWING WOMGER ry
“
FOR & ON BEHALF OF CALIBRE CONSULYING (QLD) PTY LTO STAGE 2 CONSULTING ikem Car Mw ay Seppe teat Li 4084 16-001014-405

 

 

      
 

 

 

 

 

 

 

  

eM 16-001014

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(a4zmEOZmE>
p>] olo[=] >|

 

 

 

Page 73

 

  

/ /
—ROCK SCOUR PROTECTION
Dsp = 200mm

 
   
 
 
 
  

ROCK SCOUR PROTECTION

   

Dsp = 200mm
THICKNESS = 400mm
\t /

 

i \
AL SWIMMING POOL \
7

     

SON
UPSTREAM GPT
REFER TO STAGE 1A
OPERATIONAL
WORKS DRAWINGS

  
   

 

 

REFER TO STAGE 1A
OPERATIONAL WORKS DRAWINGS
FOR DRAINAGE INFORMATION

    

 

 

 

 

SURFACE LEVEL: 100.05m AHD
FILTER AREA: 200m?

   

\ CENTRAL BIORETENTION BASIN

 
 

FILTER DEPTH: 0.4m '
©)| TEMPORARY PONDING DEPTH: 0.3m

 
 

 

 

 
 
 
 

 

MAITENANCE ACCESS <
TRACK (REINFORCED TURF)

/ 4 y

 
   
 
 
  

  

 

  
 

SS FOR ROAD AND
a DRAINAGE DETAILS

‘ REFER TO STAGE 1A
\ OPERATIONAL WORKS

DRAWINGS

 
   
   
 

 

   

 

 

  

 

CLUBHOUSE

PAD RL 102.60m AHD DETAILS.

 

 

 

GENERAL _NOTES:
1. REFER TO LANDSCAPE ARCHITECTS DRAWINGS FOR PLANTING

2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE
LATEST ISSUE OF CALIBRE CONSULTING REPORT No. 16-001014-01.

3. REFER TO DRG No. 16-001014-403 AND 16-001014-407 FOR
LEGEND AND BASIN SETOUT DATA.

N.S.C. REF NO. MCU15/0111 & REC15/0031

 

 

 

 

 

 

  

 

  

 

 

er eee eel AMENOMENT DETALS besian creck vous sees tenormw™s” | SURVEYOR: ML_SURVEYS o“ ijn ™= CENTRAL BASIN

zi VEE |v op a Latest Se celew e | PALM LAKE WORKS PTY LTD C= oS SeTOUT PLAN

ge pez cnc] 7° OC) mosrie Pere | PALM LAKE RESORT alibr Cele ning (OLD) Py ay SHEET 3 OF 4

é D 7 1 A./\ La, ( ANDREW MCPHAIL RPEQ 6921 COOROY C | re Cn 5 Gm Set QD A 0 SAS WR i
iF Ch 16-0010 14 | crs ofine wShrt arm STAGE 2 CONSULTING Tobe OM Fe 7D 16-001014-406

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 74

 

CENTRAL BASIN SETOUT

CENTRAL BASIN SETOUT

CENTRAL RETENTION BASIN SETOUT

MACROPHYTE ZONE SETOUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 

 

SOPs [EASTING [NORTHING [LEVEL (m AHD) SOPs [EASTING [NORTHING [LEVEL (m AHD) SOPs [EASTING [NORTHING [LEVEL (m AHD) SOPs [EASTING [NORTHING [LEVEL (m AHD)

01 676.026 | 1026.912 107.850 a7 681.064 | 1015.283 99.250 100 (679.419 [990.678 100.800 128__[697.520 [963.288 99.250

02 683.624 | 1038.789 102.00 48 681.340 |1015.231 98.950 101 (688.234 | 984,488 100.800 730 ~(681.130 [102.471 98.950

3 702.246 | 1040.004 101.675 9 705.910 __|1029.457 99.250 102 [690.662 [981.215 100.800 131 [683.629 __| 015.862 98.700

0% 734.818 __|1036.687 101.300 50 705.809 | 1029.175 98.950 103 [691.552 ___ | 979.385 100.500 132__[705.137___|1027.290 98.700

05 746.794 [109.794 101.300 51 715.583 | 1025.627 99.250 104 [695.585 | 976.429 100.500 133___-([714.815 __[1023.458 98.700

06 767.537 ___|1034.193 107.300 52 715.483 [102.346 98.950 105 [697.598 | 976.131 100.800 134 [739.765 | 1026.502 98.700

07 767.412 __|1031.267 100.900 53 738.574 __|1028.470 99.250 106 [701.830 | 973.470 100.800 135 [748.793 [1029.48 98.700

08 770.631 |1022.548 100.900 5h 738.729 __|1028.213 98.950 107___ [703.379 _ [970.909 100.800 136 [754.396 _|1027.787 98.700

09 712.777 |1019.142 101.300 55 748.570 |1031.737 99.250 108 [705.089 | 954.086 102.200 137___ [758.705 _[1024.979 98.950

10 772.454 __|1017.227 101.500 56 748.599 [1031438 98.950 109 __1703.895 | 951.242 102.200 138 [758.753 ___|1078.864 98.950

11 771.435 __|[1014.276 101.500 57 758.718 | 107.921 99.250 110 [700.019 [947.582 102.125 139 [754.934 _[1016.574 98.700

12 765.554 __|1007.671 101.580 58 758.447 |1018.050 98.950 m (698.510 [947.677 102.100 140 [751.987 | 104.450 98.700

B 738.880 | 100.026 101.850 59 756.054 | 1015.064 99.250 112 689.215 [978.843 100.050 11 [ 739.481 _[1073.555 98.700

1% 719.842 __ [988.062 102.000 60 752.872 __ | 1012.324 98.950 113___|693.328 | 975.848 100.050 142___|725.340 _[1014.601 98.700

5 715.032 __| 976.761 102.000 a 752.157 | 1012.601 99.250 Te 695.988 [972.959 100.050 143 [706.032 | 986.456 98.950

6 707.991 __ | 965.091 101.400 6 739.009 __|1011.304 98.950 15 697.335 {970.742 100.050 144 [695.607 [987.962 98.950

7 708.814 | 956.996 102.200 83 739.071 | 1011.598 99.250 16 (698.891 __~| 968.177 100.050 145 [681.351 __|1007.666 98.950

8 709.655 | 956.681 102.200 6h 711.963 __ | 996.379 98.950 117 {700.637 [965.312 100.050

9 712.281 [959.161 102.200 65 711.682 [996.484 99.250 118 (695.972 _ | 961.753 100.050

20 714.341 [956.980 102.300 66 707.303 | 987.431 98.950 119, 681.954 [976.601 100.050

21 702.079 [945.401 102.200 67 707.056 [987.601 99.250 120__| 683.917 __| 977.361 100.050

2 701.921 | 944.139 102.180 68 694.540 | 989.659 98.950 121 (682.871 [980.065 100.050

B 107.167 __ [973.199 100.800 69 694.827 | 989.745 99.250 122 {680.804 | 979.281 100.050

2 709.441 [974.599 100.800 70 690.899 | 994.332 98.950 123 680.739 __ [977.675 100.050

5 707.585 | 976.962 100.800 71 691.033 | 994.603 99.250 124 (678.856 | 985.361 100.050,

2% 698.189 | 976.938 100.800 R 682.262 | 1002.074 98.950 125 678.716 | 987.677 100.050

21 697.299 [978.768 100.500 B 682.541 |1002.188 97.200 126 685.338 | 983.690 100.050

28 693.266 | 981.724 100.500 Th 690.603 _|1012.455 97.200 127 692.225 | 976,095 100.350 (TOP)

29 691.253 [982.022 100.800 5 703.450 [1019.89 97.200

30 688.737 [984.616 100.800 76 707.098 |1016.763 97.200

1 679.423 [991.178 100.800 71 701.962 | 1010.759 97.200

32 765.353 | 1041.386 107.300 78 694.552 | 1008.826 97.200

3 770.060 |1035.816 101.300 79 Tou.580 | 1020.595 97.200

3h 772.641 __|1034.623 100.900 80 749.689 [021.935 97.200

35 776.833 |1023.160 100.900 81 760.960 __|1023.347 100.450

36 775.762 __|1019.437 101.300 82 782.352 |1031.576 98.300

37 783.226 _|1020.173 101.300 83 677.163 | 1008.564 99.600

38 783.864 | 1013.704 101.400 8h 677.112 |1011.623 99.600

39 781.884 __|1013.509 107.450 85 783.022 __ | 1033.789 98.220

40 719.904 | 1013.31% 101.500 86 784.102 | 1030.970 98.220

ia 780.172 __|1010.599 101.600 87 788.020 __ | 1035.907 98.200

2 785.430 __|1005.123 101.600 88 789.368 | 1032.575 98.200

3 796.896 | 1001.475 100.400 89 791.711 |1027.928 99.200

hb 197.737 |998.586 100.400 90 704.762 __| 985.217 99.250

45 783.261 | 1003.050 101.700 7 702.489 | 982.804 99.560

46 772.537 ___|1014.218 101.560

N.S.C. REF NO. MCU15/0111 & REC15/0031
Tan [eas fan] oe mn oo One SORE aT rs Tune ar ——T
mL ots [pee 38 Leybourne Street Thetmer aLD 4068 PALM LAKE WORKS PTY LTD ¢ cn Panvun aes CENTRAL BASIN
ae wo 1 0 1 2-3 6 at Mob: 0412 744 223 E: [email protected] wi” 4 SETOUT PLAN
is meme "| goo | te vex PALM LAKE RESORT Calibre Mena Bt
= a m1 18!

iE cM wos wll dome enn ism STAGE 2 CONSULTING he Ei 7985300 16-001014-407

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 75

 

        

      

DESIGN SURFACE BASIN EDGE

BASIN EDGE /,o SURFACE

SECTION
00

  

Ss

DESIGN SURFACE

   

[ BASIN EDGE

 

/ BASIN EDGE

 

re roa
=== 7 2 ee ~ ane rasa - 7 ==
EXISTING SURFACE = = s a =

SECTION (8
SCALE (All 100 \G03/

SCALE (A3):1:200

      
    
   

BOWLING GREENS

MAINTENANCE ACCESS BASIN EDGE
BASIN EDGE

DESIGN SURFACE

TENNIS COURTS

t—// —

 

SECTION (<\

LEGEND

MACROPHYTE TOPSOIL TO PLANTING ZONE (300mm)

ZONE PLANTING

RL 99.25 RL 98.70

    
  
   

CLAY LAYER (300mm)

 

INDICATIVE MACROPHYTE PLANTING AREA

; TO
a nnn nn nnn NORMAL OPERATING LEVEL (RL 99.20)
0.30m (VARIES)

—++—-:—-++— WATER QUALITY TREATMENT LEVEL (RL 99.60)

 

 

 

 

 

 

 

 

 

   

 

 

 

 

MACROPHYTE EDGE TREATMENT DETAIL em 1% AEP WATER LEVEL (RL 101.03)

SCALE 1:50 (A1)

SCALE 1:100 (A3) N.S.C. REF NO. MCU15/0111 & REC15/0031
ee T DETARS pene vues "| SURVEYOR: ML_SURVEYS al P~ jy" CENTRAL BASIN
Aa ME. oy i setae ye sarayeeicateyseonoy |__PALM LAKE WORKS PTY LID C= oman SECTIONS
ae ave vec 1° O)  pmomer te PALM LAKE RESORT calibre Cab Cn (OL) ya om SHEET 1 OF 2
i : cM 16-001014 | ‘. ANDREW MCPHAIL RPEQ 6921 COOROY | re Saar ec ea SRW OEE wz
SIF FOR & ON BEHALF OF CALIBRE CONSULTING (OLD) PTY LTD STAGE 2 CONSULTING eben Cuter lihearm Spey Singyen Senin Cent Lc 4084 16-001014-408

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 76

 

EMBANKMENT CONSTRUCTION AS PER
NOTES ON DRG NO 16-001014-403

 
   
  
  
 
 

Ds» = 300mm
THICKNESS = 600mm
KEY DEPTH = 900mm

    

   

OVERFLOW WEIR DESIGN SURFACE

 

 

 

 

 

 

 

EXISTING SURFACE J

 

RISER OUTLET PIT (REFER
TO DRG NO. 16-001014-410
FOR DETAILS

SECTION

 

BASIN END

ROCK SCOUR PROTECTION
Dsp = 200mm
THICKNESS = 400mm

 
 

LEVELS TO TIE IN TO
EXISTING SWALE

 

SWIMMING POOL
BEYOND

  
 

 

 

 
 
 

 

 

 

 

 

 

    

DESIGN SURFACE

SECTION

 

RETAINING WALL REFER TO ORG
NO. 16-001014-400 FOR DETAILS

CENTRAL BIORETENTION BASIN

DESIGN SURFACE

375

 

ROCK SCOUR PROTECTION

Dsp = 200mm

BIORETENTION FILTER &
THICKNESS =

DRAINAGE LAYERS

 

4.88m_MIN.

 

DESIGN SURFACE \

 

 

 

 

CAP

1050 AT MIN 1%

ROCK SCOUR PROTECTION
Dsp = 200mm THICKNESS = 400mm

 

     
  

 
 
       

EXISTING SURFACE

MAJOR OVERFLOW WEIR (RL
100.50m AHD) AND EMBANKMENT

BEYOND
CENTRAL WQCP

  

400mm

LEGEND

 

 

ROCK SCOUR PROTECTION

TOPSOIL TO PLANTING ZONE (300mm)

CLAY LAYER (300mm)

INDICATIVE MACROPHYTE PLANTING AREA

NORMAL OPERATING LEVEL (RL 99.20)

WATER QUALITY TREATMENT LEVEL (RL 99.60)

1% AEP WATER LEVEL (RL 101.03)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

 

 

 

 

 

 

 

 

 

SECTION (G\
0 03)

N.S.C. REF NO. MCU15/0111 & REC15/0031
oe bestow cvcx sens Cams tecrormm™® | SURVEYOR: ML_SURVEYS omer manne = CENTRAL BASIN
i genre avet Sige un tet | PALM LAKE WORKS PTY LTD C= <= & = secon
ile oom ome rocer me [RTT PALM LAKE RESORT ibre tet. Py a
: D cM 16-001014 \ ANOREW MCPHAIL RPE. 6921 EKER Cali re Seti can bn QD = CEXWGS HORSE 014-409 ae
3 t FOR & ON BEHACF OF CALIBRE CONSULTING (QLD) PTY LTD STAGE 2 CONSULTING Wiehame Cater Rebouwe ydany Rapipen Destine Coast — Lc 4084 16-001 =

 

Page 77

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

STRUCTURAL NOTES:

1, DESIGNED FOR LIVE LOAD SkPa
2. REINFORCEMENT STEEL:
21. ABBREVIATIONS FOR STEEL GRADE

AND TYPE:-"N" -

GRADE D500N DEFORMED BAR TO AS/NZS 4671.

 

 

 

 

 

 

 

 

 

    
  
   

   

   

   
   
 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

   
    

 

 

 

mort 2.2. REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY
| LTT I 2x 400 SIDE ORIFICE AND NOT NECESSARILY SHOWN IN TRUE PROJECTION.
| ON EACH SIDE AT IL 2.3. ENSURE THE CORRECT SPACING OF BARS |S
| I 99.6 480 1200 180 MAINTAINED AND ALL REINFORCEMENT IS SUPPORTED
, | IN ITS CORRECT POSITION BY APPROVED PLASTIC BAR
(3 Hl 4 | s CHAIRS, SPACERS OR SUPPORT BARS AT 800 MAX
CT [/ ly S| ° . CENTRES IN BOTH DIRECTIONS.
| fi 2.4. TIE ALL INTERSECTIONS OF BARS WITH 1.25mm MIN.
H f 7 . DIA. ANNEALED WIRE.
r : . 2.5. DO NOT WELD REINFORCEMENT WITHOUT APPROVAL
t-F Ho | OF THE ENGINEER.
Hoty Is : 1 N16-200-EW 3. FORMWORK TO BE IN ACCORDANCE WITH AS3610.
SE ror = CENTRAL I n12-600 TIES 4. COVER TO BE 50mm U.N.O.
lo q
J
i N16-200-EW 7 } -
H| CENTRAL :
| 1 g 300 STRUCTURAL CERTIFICATION
f 7 3/L11-TM BTM PUMP STATION STRUCTURAL DETAILS
i 50 COVER
| SL92 MESH TOP AND fp
LCT EL CLERC BTM. 50mm COVER vot? Mi Ae
! RL_98.30 RPEQ 17233
oT ol 7. For & on behalf of
a == =f — Se Z| TYPICAL OVERFLOW WEIR EDGE DETAIL Calibre Consulting (QLD) PTY LTD
LU = SCALE 1:10 (A1)
1200 ae SCALE 1:20 (A3)
N16-200 ‘L’ BARS (TO MATCH 25mm BLINDING LAYER
VERT. BARS COG 500 TYP. SECTION (8) 10MPa CONCRETE
SCALE (Atl: 1:20 (J
SCALE (A31:1:40 RL 100.45
WATER LEVEL CONTROL PIT DETAIL S30 R950 ©
Sze -—
SCALE 1:20 (A1) _| |_| =
SCALE 1:40 (A3) 2x400 SIDE ORIFICES
AT IL 99.60 EACH SIDE © f30 Rt 99.40
—_—
NJ
S.S. CHAIN BOLTED ——_|
TO THREADED CAPS r B30 RL 99.30
180 1200 180 1200 180 ~( I~ iz. Anchor Re Oo
RL 100.45 | | RL_99.10 >) al 99.00
: 7 fs |. A RL 98.90 5) -4 ease O fio Rt 99.20
7 , B —T —
. : : 2x 400 SIDE ORIFICE RL_98.70 -4 ==
— LON EACH SIDE AT IL aes | —P _ _|_ fb 28.60
: | ° 99.6 ae - —_© Q RL 98.40
7 cS : ea N16-200-EW CENTRAL = | _|_ © —|-4~—£ ===
: | «|| ow
— mH 100 CLASS SNé uPVC STUBS PIPE
. : FOR WATER LEVEL CONTROL, WITH
7 a THREADED CAP STUBS TO EXTEND eae Le
r TO A MINIMUM OF 50mm INTO PIT SCALE (A3l 1-40
s >
a SJ ops 1.80m
g .
t6-200-EW 1.80m 0.50m
CENTRAL . ej—s RL 100.80, _ Ru 100.80
| =—- ~— REFER TO TYPICAL
EDGE DETAIL
. — : |200| CENTRAL BIORETENTION OVERFLOW WEIR DETAIL
al | 4 L N16-200 'L’ BARS (TO MATCH ot ad a)
150 — Slo VERT. BARS COG 500 TYP. ,
elZ| 4
| d S| | | [200 SL92 MESH TOP AND BTM. 4.00m 2.40m 10.00m 3.60m 4.00m
RL_97.20 Fo | - 50mm COVER RL_101.80
r RL_101.50 ——
i as = ! ohare |
SS eT EET eT - I soo Key MIN.
SL92 MESH TOP AND BTM.— 25mm BLINDING LAYER REFER TO
50mm COVER 10MPa CONCRETE 150 THICK CONCRETE TYPICAL EDGE
10m OVERFLOW WEIR DETAIL F72 MESH 50 FROM TOP DETAIL
SCALE 1:50 (At)
SCALE 1100 (A3) N.S.C. REF NO. MCU15/0111 & REC15/0031
Fat [cas [ean oe SORE Tene T THCTOFEN We TENT Daw TE
eran SURVEYOR: ML_SURVEYS
oe TW foe a0 020 02 04 06 08 1 Mt 38 Leybourne Street, Chelmer QLD 4068 PALM LAKE WORKS PTY LTD C . CONSULT AUSTRALIA WATER QUALITY RISER
ue  —— ee A Mob: 0412 744 223 E: [email protected] 4 OUTLET PIT DETAILS
Nie PROJECT No. |
q D pravevowsex! 150 1 oss 0 i 2 A ANOREW MCPHAIL RPEQ 6921 PALM cake oF SORT Call re Ca oS oan 010 Eas SRAWaG OER ase]
EP YH) —————— an 16-001014 Tale 073695 344 Fosinde 07 3895 400 soo! 16-001014-410
SIF FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTO STAGE 2 CONSULTING items Chere Mabowns Say hype Semaine Cont Lc 4084 6-001014-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 78

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
   
  
 
 
  
  
   
   
  

 

BASIN

 

1. EXTENDED DETENTION DEPTH: 400mm
2. FILTER AREA: 525m?

3. 1% AEP DETENTION VOLUME: 1,030m?
4. 1% AEP BASIN WSL: RL 100.5M

SPECIFICATIONS

 

 

 

/

 
 

 

 

 

LEGEND:

DESIGN SURFACE CONTOUR

T T BATTERS (GRADE AS SPECIFIED)

PROPOSED FENCE

/

 

eee PROPOSED STORMWATER PIPE

 

 

 

 

   
 
 
  

 

 

 

 

 

 

 

 

 

 

 
 
   

 

 

 

 

| in 4.5), sw FUTURE STORMWATER PIPE
ax ROCK SCOUR PROTECTION
a REINFORCED TURF
ae 100% SUBSOIL AND
CLEANOUT PITS
seeeeeeeeeen== SUBSOIL COLLECTOR
PROPERTY BOUNDARY V\\ VA
4m OVERFLOW WEIR AT RL 100.40
FOR DETAILS REFER DRG No. 16-001014-412
SETOUT POINT TABLE
SOP No. | EASTING | NORTHING [LEVEL (m AHD) Bens TTT Te SCOUR PROTECTION AND
o 700.4% | 133.448 102.30 Hee ATER
02 700.420 | _1132.439 102.30 THICKNESS = 400mm
03 714.158 | _1131.676 100.80
04 714.022 1130.686 100.80
05 737.1462 | 1128.21 100.80
06 737.575 | 127.235 100.80
07 751.249 | 112.419 100.80
08 750.264 | 112.247 100.80 TS
09 751.621 | 1111434 100.80
10 750.436 | _ 1111.262 100.80
1 753.016 | 1109.276 100.40
12 749.659 1108.690 100.40
B 753.704 | _1105.336 100.40
1 750.347 | _1104.750 100.40
15 752.934 | 102.765 100.80 SEDIMENT FOREBAY
16 751.949 102.593 100.80 MIN SURFACE AREA: 6m?
17 753.106 | _1101.780 100.80 FOREBAY DEPTH: 0.3m
18 752.121 1101.608 100.80 REFER 16-00-001014 DWG
9 754.592 | 1093.272 100.80 FOR TYPICAL DETAIL
20 753.607 | 1093.10 100.80
a 754.739 | 092.427 100.80
22 753.754 | 1092.255 100.80 OUTLET CONTROL PIT FOR DETAILS
B 752.477 | _1083.916 100.80 co REFER TO DRG No. 16-001014-416.
2 750.971 | 1083764 100.80 ! “|
30 117.545 1125.015 99.10 | SL
31 736.712 | 122.207 99.10 '
32 74.685 | 116.483 99.10 | REFER TO FUTURE OPERATIONAL
3 7T41.571_| 1098.020 99.10 ' WORKS PLANS FOR FINAL eNO
34 745.270 | _1093.489 99.10 |
35 41.249 | _1093.635 99.10 '
36 715.308 1119.401 99.10 |
37 740.405 | 1085.475 100.45 '
38 736.201 | 1087.812 100.45 | CARPARKING SPACES NOTES:
39 737.606 | _1084.591 100.71 ' 4. REFER TO LANDSCAPE ARCHITECTS DRAWINGS FOR PLANTING
40 734.695 | 1087.567 100.71 DETAILS.
a 727.575 | _1084.508 100.35 |
“2 727.550 | 1087.508 100.35 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LATEST
iB 766.112} 109.396 98.00 iL) | ISSUE OF CALIBRE CONSULTING REPORT No. 16-001014-01.
4b 761.942 | _1101.782 97.90 i
is T6007} Teo 5B ooo 3. REFER TO DRG No. 16-001014-400 FOR GENERAL NOTES AND
46 762.192 113.315 97.68 ! ( : \
47 764.373 | 110.336 97.77 j \
N.S.C. REF NO. MCU15/0111 & REC15/0031
vast [cas [one] ote Seoun Gneoe TORE TIETREST THORP Wa aT aR TE
AMENDMENT DETAILS SURVEYOR: ML SURVEYS
me orf fe 38 Leybourne Street Chelmer QLD 4068 PALM LAKE WORKS PTY LTD co nnun NORTHERN BASIN
ut 02 0 2 46 6 8 wm Mob: 0412 744 223 E: [email protected] [| ——— LAYOUT PLAN
NTe 1:400 AR PROJECT No.
a D eran 16-001014 ‘ANDREW MCPHAIL RPEQ 6921 PALM CAKE RESORT Call re Ca aS (OP en md tote! TaAWNG HOGER resus]
Sle =! Te 07 3895 3444 Facsimile 07 3895 3400
a cM CONSULTING fo) FT LO STAGE 2 CONSULTING Se eee ee 16-001014-411

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 79

 

PROPERTY
BOUNDARY

DESIGN SURFACE

 

 

EXISTING SURFACE

SECTION (“A
NY,

 

ACCESS TRACK

 

 

 

 

  

DESIGN SURFACE

 
 

 

REFER OPERATIONAL WORKS CIVIL SCOUR PROTECTION
PACKAGE FOR DRAINAGE DETAILS Dso = 200

THICKNESS = 400mm SECTION 5 (8

 

 

 

 

DESIGN SURFACE

EXISTING SURFACE 4m WIDE OVERFLOW WEIR
AT 100.4 (BEYOND)

 
  
  

RL_99.00m_ AHD
<—

 

 

 

 

 

 

 

 

 

LEGEND REFER TO DRG NO
------------- TEMPORARY PONDING LEVEL (RL 99.40) 16-001014-411 FOR. Rock ae PROTECTION
‘50 =
OUTLET PIT DETAILS SECTION 7 () THICKNESS = 400mm

— a 5% AEP WATER LEVEL (RL 100.37)

 

-_—--o 1% AEP WATER LEVEL (RL 100.51)
BIORETENTION FILTER AND DRAINAGE LAYERS REFER TO

LLZLZA,.-RG No. 16-001014-400 FOR TYPICAL BIORETENTION
s

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ECTION N.S.C. REF NO. MCU15/0111 & REC15/0031
om or To [ans sctven pease OL’ | 30 Leyboune Sires Chelmer OLD 4068 PALM LAKE WORKS PTY LTD C —_—, con uum NORTHERN BASIN
é 4 400 1 20244 #2 3 & 5 At Mob: 0412 744 223 E: [email protected] hg DP SECTIONS
sc exw cnzox] *270 3] proner ne Pm T(r | PALM dake RESORT all Cale Cont (LD) Py Ls a
: D 7 ANDREW MCPHAIL RPEQ 6921, OOROY C I re Ground For, $45 Quen Sed, Bsbore, QLD Asia 4000 Cony | DRAWNG WOMEN SSCSC*dC BO
8 = cM“ 16-001014 FOR & ON pi cw ( (QLD) PTY LTD STAGE 2 CONSULTING Sree nee aoe ee = Res 16-001014-412

 

 

 

 

 

 

 

 

 

 

 

Page 80

 

 

OUTLET PIT TO BE
DESIGNED BY OTHERS

 

 

 

900x900 PRIMARY 900x900 SECONDARY
OUTLET CONTROL PIT OUTLET CONTROL PIT
RL_100.15m_AHD
———————

 

 

RL_100.00m AHD
3

 

 

2x O250 ORIFICE :
AT IL 99.40 “

RL_99.40m AHD
oF

y Vy

 

   

 

 

 

 

 

 

 

 

 

—|

1
RL _98.00m AHD | . I\

 

 

 

FILTER MEDIA REFER DWG SUBSOIL DRAINAGE 1 x G300 ORIFICE
16-001014-400 FOR TYPICAL
BIORETENTION DETAIL

NORTHERN BASIN OUTLET PIT DETAIL
SCALE 1:20 (At)
SCALE 1:40 (A3)

2.40m 4.00m 2.40m 1.00m

 

 

 

RL 100.80 RL_100.80
= Te -

\\ soe KEY REFER TO TYPICAL

150 THICK CONCRETE EDGE DETAILS PROVIDED ON
F712 MESH 50 FROM TOP DRG. NO. 16-001014-410

 

 

 

 

 

 

 

 

    

 

 

 

NORTHERN BASIN OVERFLOW WEIR DETAIL
SCALE 1:25 (A1)
SCALE 1:50 (A3)

N.S.C. REF NO. MCU15/0111 & REC15/0031

 

 

 

 

 

 

 

 

 

 

 

 

TAGROFLNT Ros Daawana THLE
fen [use bowel eras escn creo Sea TEST mine T surveyor: ML_SURVEYS =“ P~

= M | 6.09.56 420 0.2 0 0.2 04 06 08 1 AL 38 Leybourne Street, Chelmer QLD 4068 PALM LAKE WORKS PTY LTD CONSULT AUSTRALIA NORTHERN BASIN

aE Of, Mob: 0412 744 223 E: [email protected] fd <2 iP 4 DETAILS

Nic PROJECT Wo. APPROVED a , . - a

a PRAWN CHECK) 4950.25 0 0.25 0.5 0.75 1.0 1.25 At ANDREW MCPHAIL RPEQ 6921 PALM COG RESORT calibre nce cr aa = awe “ae
HE “ls == .| 16-0104 V4 Teephne 07 38953444 Facsimile 073895 3400 SO 16-001014-413

if For _& ON-GEHALF OF CALIBRE CONSULTING (QLD) PTY LTO STAGE 2 CONSULTING ee — -

 

 

 

 

 

 

 

 

 

 

 

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.