16-001014-01A (Swmp)

Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

3        PEAK FLOW INVESTIGATION
Hydrological analysis using XP-RAFTS was undertaken to demonstrate that the development of the site with mitigation
measures would not result in adverse impact downstream. The methodology undertaken in this analysis is consistent with
the past approvals. The following scenarios were undertaken in this analysis.

   Existing Scenario represents the hydrology for the catchment under existing conditions. Catchment parameters (i.e.
    infiltration loss and lag parameter values) were adopted as per Water Technology’s Cooroy Flood Study (Report No.
    J2835-01_R02v01 dated 26 July 2013) which is the adopted hydrological modelling for the area and was prepared
    specifically for the Sunshine Coast Regional Council. The report and corresponding models were supplied by Noosa
    Shire Council.

    Peak flow results determined in this scenario were compared with developed peak flow results to assess the change
    in peak flows at site discharge locations.

   Developed Mitigated Scenario represents the hydrology for the catchment under proposed development conditions
    with mitigation. This scenario was undertaken to determine the adequacy of the proposed mitigation measures to
    reduce peak flows back to or below existing conditions, therefore demonstrate no adverse impact.

The Existing and Developed Mitigated Scenario were modelled using the computer package XP-RAFTS. XP-RAFTS
analysis enables the hydrological modelling of the site for numerous design storm events and land uses. The subsequent
sections indicates the various assumptions and procedures used in developing each XP-RAFTS model.

3.1      EXISTING SCENARIO
The Existing Scenario was undertaken to determine peak flows discharging from the site under existing conditions.

3.1.1    CATCHMENT CHARACTERISTICS

Existing Catchments were delineated based on existing survey and aerial information. Existing catchments provided are
in accordance with the Concept SWMP Report (No. B14158.W-03A dated November 2015), only the Fraction impervious
value for Catchment D1 (Trading Post Road) has been updated to reflect the latest survey information. Catchments were
also split into various sub-catchments for modelling purposes. Fraction impervious values have been determined using
detailed survey and aerial information. Vectored slope has also been measured from the survey.

A summary of the existing catchment details are provided in Table 3-1 below.

                                   Table 3-1:   Existing Scenario Catchment Details
                                            Downstream           Sub-
         Overall               Sub-                                             Fraction
                                                Sub-          Catchment                      Vectored Slope (%)
        Catchment           catchment                                          Impervious
                                             Catchment         Area (ha)
      Northern            A1               A2                    0.78             0.12              0.7%
                          A2               A_OUTLET              1.62             0.10              2.9%
      Central             B1               B2                    1.38             0.23              1.7%
                          B2               B3                    3.66             0.01              2.5%
                          B3               B4                    2.32             0.03              7.1%
                          B4               D2                    0.55             0.25              4.0%
      South               C1               C2                    0.93             0.32              0.8%
                          C2               C3                    5.14             0.02              2.6%
                          C3               D                     0.64             0.00              6.0%
      Central & South     D1               D2                    0.35             0.44              4.4%
                          D2               D_OUTLET              1.20             0.09              4.0%



16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)               COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                        ROAD, COOROY              |7
Log in to download the original file

16-001014-01A (SWMP).pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.