runoff below the 63% AEP storm event (<0.29m3/s) to the Central Bioretention Basin and a secondary drainage link
to direct high-flows to the towards the proposed WQCP (not modelled in MUSIC).
A layout of the primary and secondary drainage links modelled is indicated on the MUSIC configuration layout provided in
Appendix F. Drawing No. B14158.W-SK102 also provides further details of the site’s internal drainage strategy.
No routing was adopted for drainage links within MUSIC model in accordance with Section 4.17 of the MUSIC Modelling
Guidelines (2010). This assumes flows and associated pollutants from all parts of the catchment arrive at the treatment
nodes at the same time. This is conservative as it means that MUSIC may overestimate the overflow volumes.
4.4.4 TREATMENT NODES
4.4.4.1 BIORETENTION TREATMENT NODE
Bioretention treatment nodes were used to model the proposed bioretention filter in the northern and southern basin and
bio-pod. Default K and C* values were adopted for these treatment nodes. These treatment nodes were set up generally
in accordance with the MUSIC Modelling Guidelines (2010) and Interim MUSIC Bioretention Treatment Node (2013).
Refer to Table 4-2 for the bioretention treatment node configuration. All other parameters have been adopted from
MUSIC Modelling Guidelines (2010).
Table 4-2: Bioretention Basin Modelled Parameters
Parameter Northern Basin Central Basin Southern Basin Pod D2 Pod D3
2
Filter Media Area (m ) 525 200 305 25 50
Surface Area (m2) 525 220 340 25 50
Extended Detention Depth (m) 0.3 0.3 0.3 0.2 0.2
Filter Depth (m) 0.4 0.4 0.4 0.4 0.4
Sandy Sandy
Filter Media Type Sandy Loam Sandy Loam Sandy Loam
Loam Loam
Saturated Hydraulic
Conductivity of Filter Media 200 200 200 200 200
(mm/hr)
TN Content of Filter Media
400 400 400 400 400
(mg/kg)
Orthophosphate Content of
30 30 30 30 30
Filter Media (mg/kg)
Overflow Weir Width Modelled
4 5 6 2.4 2.4
(m)1
1The width of the major overflow weir was conservatively modelled.
Refer to Drawing No. B14158.W-SK102 and SK113 in Appendix G for further treatment train details.
4.4.4.2 POND NODE
A separate MUSIC model was configured, including the WCQP to determine Hydraulic Residence Time (HRT), which is
an important feature of the pond required for avoiding outbreaks of algae (as discussed below). Table 4-3 indicates the
pond node configuration adopted in MUSIC. Further details of the WQCP are indicated on the Drawing No. 16-001014-
402 in Appendix G.
16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP) COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS ROAD, COOROY | 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.