16-001014-01A (Swmp)

Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

6         CONCLUSION
This Stormwater Management Plan has been prepared to support the Operational Works Application for Stage 2 and
subsequent Stages of the Palm Lakes Cooroy Retirement Community. The outcomes of the stormwater investigations
are listed below:

   Stormwater Quantity – Hydrological analysis demonstrates that no actionable nuisance to adjoining properties can be
    provided as peak flows at each discharge location from the site have been reduced below existing conditions for all
    storm events up to and including the 1% AEP storm. The proposed peak flow mitigation strategy (involving the
    Northern and Central Detention Basins, integrated with stormwater quality devices) is therefore adequate.
   Stormwater Quality – MUSIC modelling demonstrates that water quality objectives required by Noosa and the SPP
    (2014) can be met for the proposed development. The proposed Stormwater Quality Management Strategy involving
    Gross Pollutant Trap devices (GPT’s), Bioretention Basins and a Water Quality Control Pond (WQCP, not modelled
    in MUSIC) is therefore adequate. Construction and operational management and maintenance of the GPT’s,
    Bioretention Basins and WQCP is provided in the SMCMP Report.
   Waterway Stability Management - Results determined in the hydrological analysis demonstrate the waterway stability
    management requirements will be achieved, as there is a reduction in peak flows during the 63% AEP storm event.

Following MCU approval from Council, this report also addresses the Approval Conditions relating to stormwater
management. This has been summarised in Section 1.3 of this report.




7         RECOMMENDATIONS
It is recommended that this Operational Works design for Stage 2 (including Central Basin and Southern Basin) be
approved on the basis that acceptable outcomes will be provided for stormwater management.

With this submission we seek overall strategy approval for the balance stormwater management works (including the
Central Basin and Southern Basins). We also seek the approval for the Northern Bioretention Basin design however
inflow pipes are subject to future Civil Drainage Operational Works approval. Bio-Pod D2 and D3 are subject to future
Civil Drainage Operational Works approvals.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)               COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                        ROAD, COOROY                 | 22
Log in to download the original file

16-001014-01A (SWMP).pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.