Original source · versioned page text
16-001014-01A (Swmp)
Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
TABLE OF CONTENTS
1 INTRODUCTION ............................................................................................................... 1
1.1 Scope of this report ................................................................................................. 2
1.2 Previous Documentation ......................................................................................... 2
1.3 Response to Approval Conditions ........................................................................... 3
2 SITE CHARACTERISTICS ................................................................................................ 5
2.1 Location .................................................................................................................. 5
2.2 Topography and Site Drainage ............................................................................... 6
2.3 Site Discharge locations ......................................................................................... 6
3 PEAK FLOW INVESTIGATION ......................................................................................... 7
3.1 Existing Scenario .................................................................................................... 7
3.1.1 Catchment Characteristics ........................................................................ 7
3.1.2 Infiltration Loss & Lag Parameters ............................................................ 8
3.1.3 Channel Routing ........................................................................................ 8
3.1.4 Rainfall Data .............................................................................................. 8
3.1.5 Existing Peaks Flow .................................................................................. 8
3.1.6 Model Verification Check - Rational Method ............................................. 9
3.2 Developed Mitigated Scenario ................................................................................ 9
3.2.1 Catchment Characteristics ........................................................................ 9
3.2.2 Infiltration Loss & Lag Parameters .......................................................... 10
3.2.3 Channel Routing ...................................................................................... 10
3.2.4 Rainfall Data ............................................................................................ 10
3.2.5 Proposed Mitigation Strategy .................................................................. 10
3.2.6 Developed Mitigated Peaks Flow Results ............................................... 12
3.2.7 Extreme Event Sensitivity Check ............................................................. 13
3.2.8 Internal Drainage Strategy ....................................................................... 14
4 STORMWATER QUALITY .............................................................................................. 15
4.1 Pollutants of Concern ............................................................................................ 15
4.2 Water Quality Objectives ...................................................................................... 15
4.3 Stormwater Quality Management Strategy ........................................................... 15
4.3.1 Utilised Treatment Systems ..................................................................... 16
4.3.2 Proposed End-of-Line Systems ............................................................... 16
4.4 MUSIC Modelling .................................................................................................. 17
4.4.1 Meteorological Data ................................................................................. 18
4.4.2 Source Nodes .......................................................................................... 18
4.4.3 Primary and Secondary Drainage Links .................................................. 18
4.4.4 Treatment Nodes ..................................................................................... 19
4.5 MUSIC Modelling Results ..................................................................................... 21
5 WATERWAY STABILITY MANAGEMENT ...................................................................... 21
6 CONCLUSION ................................................................................................................. 22
7 RECOMMENDATIONS ................................................................................................... 22
8 DISCLAIMER ................................................................................................................... 23
9 REFERENCES ................................................................................................................ 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.