Original source · versioned page text
16-001014-01A (Swmp)
Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
-
CC___
BBQ AREA
DECK
OL
PO
A
SP
__
CC___
[OCR of page images]
NORTHERN BASIN
®
2S
CENTRAL BASIN
PROPOSED GPT
Be 63% AEP PEAK
FLOW DIVERSION
Y
lal /V
PROPOSED 6m WID! Y L
DRAINAGE EASEMENT Al/ 4
4
Y
i //
PLUNGE POOL / 4//%
ENERGY ‘a/7
DISSIPATER “Ny
7
EXISTING SWALE JNJ
7 ,
S BIOPOD D2
/ nV
fe \
7 L =\
7 / 2
J 7 Aaé~
y v7 \
C/N \
/ 7
7 la \ \
& \ \
Y V\y\ \
\ 1
CONCEPT ROAD AND DRAINAGE
LAYOUT SHOWN IS SUBJECT TO
FUTURE STAGE 4 OPERATIONAL] \
WORKS DESIGN AND APPROVAL
v
\
|/— PROPOSED SWIMMING POOL
REFER TO ARCHITECTURAL FOR
LANDSCAPING AND FENCING
Ld
« [elel=]
5m WIDE
63% AEP PEAK FLOW
DIVERSION © 900
STORMWATER
EASEMENT
PEAK FLOWS ABOVE THE 1
ARI STORM TO BE DIRECTED
TOWARDS SWALE
PROPOSED GPT
UPSTREAM OF
BASIN
\
LEGEND:
\ SITE BOUNDARY
— \ sw>_— PROPOSED STORMWATER DRAINAGE
\ CLAW PROPOSED STORMWATER EASEMENT
- \
a 2 RETAINING WALLS
a \ FLOW DIRECTION
\ 7 63% AEP PEAK FLOW DIVERSION
\ = \
\ a DISCHARGE LOCATION
a a> 4-2-4 3 EXISTING SWALE
\
\
\
\
\ \ \ — \ \
\ \ — - \ 7
—\ a - »
\ = a — \
J a
L 7
\ L a \ \
2 a
_ c
\ \ \
\ \ a
a \ <
a“ \ \ — \
- \ ~
\ \
\ \ \ a“
\ \ a
YEAR \ \, a \ —
\ — a \e
(_ EASEMENT
3m WIDE DRAINAGE
\
SPLITTER MANHOLE TO DIRECT 63% AEP
PEAK FLOWS TO BASIN AND MAJOR FLOWS TO
THE PROPOSED SWALE & DRAINAGE EASEMENT PROPOSED STORMWATER DRAINAGE
| DESIGNED TO CONVEY MINOR FLOWS.
(10% AEP) TOWARDS SOUTHERN BASIN.
MAJOR OVERFLOWS TO BE DIRECTED
TOWARDS TRADING POST ROAD
SPLITTER MANHOLE TO DIRECT 63%
AEP PEAK FLOWS TO PROPOSED
GPT AND OVERFLOWS TO BASIN
UPSTREAM OF BASIN
FILE: B14158.W-SKNI0.dwg_ DATE: 12-11-2015 TIME: 08:49
Pxref's: X_B1\158.W_BASE X_B1\158.W_MODIFIED ARCH X_B14158.W_TITLE ADAM DTM Layer Copy USR: Sam Linde
NOTES:
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
16-001014-01.
CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES
Tar [acs taw] OAT ao TRCROTTN Ne STENT SRRWRG TT
AMENDMENT DETAILS DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES rn
ne 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT ‘CONSULT AUSTRALIA CONCEPT STORMWATER
. Ph (07) 5443 2844 Fax (07) 5443 7146 DRAINAGE PLAN
Fe [OF | 01.08.16 | MINOR AMENDMENTS 1500 10 o 2° 20 1 TIORET 4
Nic caaw onsen] 17200 8 PROJECT No. THROES rf SHEET 1 OF 2
0 B14158,.W AMITHEW HL PED TT PALM LAKES - COOROY Call re ee | _
NIE . Te 07 3895 2444 Focumile 07 3895 $400
br fo OW SEALE OF CALBRE CONSULTING LD PTY LT RETIREMENT COMMUNITY CONSULTING tsen tort tases ew oa tere “BERL B14158.W-SK110 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.