Minor Change Existing Approval - MCU17 0568 02 & OPW17 0602 02 (As Published)
75. Peak 1-year ARI event discharge from the construction phase of development must be
equivalent to the pre-development peak 1-year ARI event discharge. Measures included in
calculations to achieve management of peak flows must be incorporated into the
development in a manner that is consistent with the Noosa Plan, all conditions of the approval
and does not interfere with adjoining properties.
76. Prior to the completion of the development, all site surfaces must be effectively stabilised.
For the purpose of this condition, an effectively stabilised surface is defined as one that does
not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully
erosion or lead to sedimentation, or lead to water contamination.
FOLLOWING CONSTRUCTION
Certification
77. Upon completion of the work and prior to the final inspection a certificate must be issued by
an RPEQ certifying that the works have been constructed in accordance with the Operational
Works permit and applicable engineering standards.
78. A final inspection and approval of the completed works by Council’s Inspector is required.
Please contact Council on 5329 6245 to arrange for the inspection.
79. All stormwater quality treatment devices must be maintained in accordance with the Water
by Design (2009) - Maintaining Vegetated Stormwater Assets (Version 1). A copy of this
document must be retained on the site together with the approved Operational Works
drawings for the stormwater quality treatment system and a detailed life cycle costing of the
system attached as an addendum. Records of all maintenance activities undertaken must
be kept and made available to Council upon request.
80. Any proposed Community Management Statement required for the development must
include the Water by Design (2009) – Maintaining Vegetated Stormwater Assets (Version 1)
document and must include the full cost of maintaining the system in accordance with that
document.
81. The areas identified as ‘Loading bay 3’ and ‘Loading bay 4’ in the Site Plan No. DA01 Rev.
7 and dated 13 March 2018, are to be used solely for truck loading and manoeuvring
purposes and must remain clear of obstructions at all times. These areas are not to be used
for any fabrication, assembly, storage or other purposes.
82. The loading and manoeuvring areas within the building must be line marked, sign posted and
pavement marked ‘Keep Clear’ in accordance with the areas described by ‘Loading bay 3’
and ‘Loading bay 4’ on Site Plan DA01 Rev 7 and dated 13 March 2018
MATERIAL CHANGE OF USE - MCU17/0568.01 – Additional Conditions – 3 October 2023
83. Deleted.
84. Deleted.
Water Sensitive Design
85. Deleted.
86. Deleted.
5. REFERRAL AGENCIES
Not applicable.
Page 11 of 15
Document Set ID: 25022269
Version: 4, Version Date: 30/07/2026