Minor Change Existing Approval - MCU17 0568 02 & OPW17 0602 02 (As Published)

of 15

Page text shows just the words. Original shows the document exactly as it was published.

               8.     Amendments to plans, in accordance to the relevant conditions, and/or any requested
                      changes to the conditions of this decision notice must be made within the appeal period or
                      the suspended/extended appeal period. Alternatively, an application for “Request to change
                      an existing approval” under the Sustainable Planning Act 2009 must be made along with
                      Council’s applicable fees.
               9.     It should be noted prior to arranging a pre-start meeting the Right of Appeal Period of 20
                      business days should have been passed or the applicant has have confirmed by a letter or
                      an email that he/she has accepted the conditions of Decision Notice and waived his/her
                      appeal right.
                      Qualified Person
               10.    For the purpose of certifying that the design of the stormwater harvesting tanks is in
                      accordance with the requirements of this Decision Notice, a qualified person is considered
                      to be a Registered Professional Engineer of Queensland (RPEQ), builder or plumber.
                      Environmental Advisory notes
               11.    The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               12.    Accepted best practice standards include:
                      a)      Best Practice Erosion and Sediment Control, International Erosion Control Association
                                (2008)
               13.    As a general rule, a site is determined to have achieved effective short-term stabilisation if
                      at the completion of the works:
                      a)      Methods of stabilisation are:
                              i.       appropriate for slopes and slope lengths; and
                              ii.      are consistent with best practice environmental management practices such as
                                       in the Manual for Erosion and Sediment Control or the IECA Manual;
                      b)      Stormwater runoff from the site is not currently, and is not likely to result in visible
                              evidence of sedimentation or erosion, or lead to water contamination.
                           If at the time of the completion of the works, the method of short-term stabilisation has not
                           achieved a level of stability that Council's Officers believe will have a high probability of
                           achieving long term stability, Council Officers may take the following matters into
                           consideration in determining whether the site is capable of achieving medium to long-term
                           stability:
                      c)      Evidence that the site has been effectively stabilised in the short term;
                      d)      Evidence that soil has been adequately ameliorated;
                      e)      Evidence that seed of annual and perennial grass species has been applied at an
                              adequate rate; and
                      f)      That grass seed has germinated at a density that is likely to achieve an effective grass
                              property notes




                                                                                                          Page 13 of 15
Document Set ID: 25022269
Version: 4, Version Date: 30/07/2026
Log in to download the original file

Minor Change Existing Approval - MCU17 0568 02 & OPW17 0602 02 (As Published).pdf · 195 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.