Appendix C - Bushfire Hazard Assesment
BUSHFIRE HAZARD ASSESSMENT
MATERIAL CHANGE OF USE FOR A DWELLING HOUSE
797 RINGTAIL CREEK ROAD, POMONA
LOT 4 ON RP213871
52A Park Rd Nambour QLD 4560 / Ph: 0428 221 983 / Email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 31 pages
Page 2
TABLE OF CONTENTS
1.0 INTRODUCTION......................................................................................1
1.1 PURPOSE......................................................................................................................................1
1.2 ASSESSMENT AREA .......................................................................................................................1
1.3 NOOSA COUNCIL BUSHFIRE HAZARD OVERLAY.................................................................................3
1.4 STATE PLANNING POLICY BUSHFIRE HAZARD OVERLAY .....................................................................4
1.5 SURROUNDING LAND USES ............................................................................................................4
1.6 TOPOGRAPHY ...............................................................................................................................5
1.7 VEGETATION ................................................................................................................................7
2.0 BUSHFIRE HAZARD ASSESSMENT ............................................................8
2.1 STATE ASSESSMENT METHODOLOGY ..............................................................................................8
2.1.1 General .........................................................................................................................8
2.1.2 Vegetation Hazard Classes .........................................................................................8
2.1.3 Maximum Landscape Slope ........................................................................................9
2.1.4 Fire Danger Index ........................................................................................................9
3.0 LOCAL HAZARD MAP ............................................................................10
3.1 GENERAL .................................................................................................................................... 10
3.2 PATCH AND CORRIDOR FILTERING ................................................................................................ 10
3.3 CALCULATION OF POTENTIAL BUSHFIRE INTENSITY ........................................................................ 10
4.0 SETBACKS .......................................................................................14
4.1 SETBACK CALCULATIONS.............................................................................................................. 14
4.2 VEGETATION MANAGEMENT WITHIN ASSET PROTECTION ZONE ...................................................... 16
5.0 CONCLUSION ...................................................................................17
6.0 REFERENCES ...................................................................................18
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: i
797 Ringtail Creek Road, Pomona
Page 3
Disclaimer
This assessment has been prepared by Equilibrium Ecology Pty Ltd for the specified Client and may only be used and relied
upon for the purposes set out in this report. No responsibility is held to any person other than the Client for any decision or
action arising from or in connection with this report. All opinions and conclusions are based on assumptions detailed in this
report and no responsibility is held for any error or omission arising from these assumptions being incorrect.
This assessment has been based on site conditions present at the time of preparation and are relevant to the nature of the
development proposed. The assessment relies on current bushfire hazard assessment methodologies as described in this
report. These methodologies may not consider catastrophic bushfire events which may occur from time to time. By their
nature, bushfires are unpredictable, and no guarantee can be provided or should be assumed that the area will not be affected
by bushfire at some time. Landowners/occupants should be aware of the unpredictable nature of bushfire and potential
consequences of such events and should be responsible for their property and occupants by being prepared for extreme events
accordingly.
To the extent permitted by law, Equilibrium Ecology Pty Ltd excludes all liability to any person for any consequences, including
but not limited to all losses, damages, costs, expenses, and any other compensation, arising directly or indirectly, from using
this report (in part or whole) and any information or material contained in it.
Document Issue
Version Number Date Authorised for Issue
1 25 October 2021 N. Willis (B. Sc., Dip. CLM., mAABR,
mEIANZ) – Director/Principal Ecologist
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: ii
797 Ringtail Creek Road, Pomona
Page 4
1.0 INTRODUCTION
1.1 PURPOSE
This Bushfire Hazard Assessment Report has been prepared to assess the degree of bushfire hazard and
associated risk acting on Lot 4 on RP213871 located at 797 Ringtail Creek Road, Pomona (herein referred
to as ‘the site’). The applicants are seeking to build a primary dwelling within a vegetated area within the
south-eastern site extent. Building Plans have been provided as Appendix A. This assessment has been
undertaken to determine the specific extent of bushfire hazard acting on the proposed dwelling and to
determine the setback distances required to safely locate the dwelling. Setback distances will also
determine the Bushfire Attack Level (BAL) construction standard under Australian Standard AS3959:2018
Construction of Buildings in Bushfire Prone Areas.
The following documents prescribe the bushfire assessment measures utilised in Queensland and have
been drawn upon in the preparation of this report:
Natural Hazards, Risk and Resilience –– Bushfire State Planning Policy – state interest guidance
material (The Department of Infrastructure, Local Government and Planning, 2019)
Bushfire Resilient Communities. Technical Reference Guide for the State Planning Policy State
Interest ‘Natural Hazards, Risk and Resilience - Bushfire’ (Queensland Fire and Emergency Services
(QFES), 2019)
1.2 ASSESSMENT AREA
QFES (2019) defines the assessment area as the development footprint and all land within 150m of the
extent of the development footprint (i.e., the build location). The overall site is located within a
predominantly vegetated rural area and covers approximately 3.4ha. The site currently contains several
sheds and horse stables, with a semi-cleared area surrounding the existing sheds. The remainder of the
site is dominated by native vegetation, including tall open Eucalypt forest in the south, and native
regrowth vegetation in the north. Vegetated and semi-vegetated rural allotments dominate the landscape
surrounding the site. Plate 1 depicts the existing site conditions within the assessment area.
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 1
797 Ringtail Creek Road, Pomona
Page 5
Plate 1: Assessment Area (Source: QLD Globe)
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 2
797 Ringtail Creek Road, Pomona
Page 6
1.3 NOOSA COUNCIL BUSHFIRE HAZARD OVERLAY
The proposed build location is within a mapped High Potential Bushfire Intensity area under the Noosa
Plan 2020 (refer to Plate 2).
Approx. Build Location
Plate 2: Noosa Plan 2020 Bushfire Hazard Overlay (Source: Noosa Intramaps)
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 3
797 Ringtail Creek Road, Pomona
Page 7
1.4 STATE PLANNING POLICY BUSHFIRE HAZARD OVERLAY
The proposed build location is within a mapped very High Potential Bushfire Intensity area under the State
Planning Policy Bushfire Hazard Overlay (refer to Plate 3).
Approx. Build Location
Plate 3: State Planning Policy bushfire hazard mapping (Source: SPP Mapping)
1.5 SURROUNDING LAND USES
The site is located within a rural landscape characterised by mixed land uses containing a mosaic of cleared
and vegetated areas. Rural land uses dominate the landscape to the east, with large areas characterised
by regularly mowed/slashed grass with low density woody vegetation. Large expanses of hazardous
vegetation surround the site in all other directions, including remnant and regrowth vegetation and
established Eucalypt plantations. Surrounding land uses are depicted in Plate 4.
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 4
797 Ringtail Creek Road, Pomona
Page 8
Plate 4: Surrounding Land Uses (Source: QLD Globe)
1.6 TOPOGRAPHY
The site is located on gently sloping land adjacent to Six Mile Creek which is located approximately 175m
to the north of the site. The site and surrounding landscape exhibit a slight north-westerly aspect with an
average slope of approximately 1 degree. The site exhibits a maximum height of 89m AHD in the south-
east corner and descends to a low point of 84m AHD near the western boundary. Plates 5 & 6 depict
topography conditions surrounding the site.
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 5
797 Ringtail Creek Road, Pomona
Page 9
Plate 5: Topography/ Hill Shade (Source: QLD Globe)
Plate 6: Topography (Source: Noosa Council Intramaps)
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 6
797 Ringtail Creek Road, Pomona
Page 10
1.7 VEGETATION
A site assessment was undertaken on 25 August 2021. Vegetation within the 150m assessment area
surrounding the proposed build site is characterised by tall open Eucalypt forest with vineforest
understorey. The canopy has attained a height of greater than 30m and is dominated by Eucalyptus
grandis (flooded gum). The mid-storey is mid-dense and contains a diverse range of vine forest species
including Commersonia bartramia (brown kurrajong), Flindersia bennettiana (Bennet’s ash), Glochidion
ferdinandi (cheese tree), Jagera pseudorhus (foam bark), Alphitonia excelsa (red ash), and Syzygium
oleosum (blue lily pily). Vine species such as Flagellaria indica (whip vine) and Cissus hypoglauca (native
grape) also occur in the mid-storey. The understorey is dominated by species such as Blechum
cartilagineum (gristle fern), Gahnia aspera (sword sedge), Scleria sphacelata (a sedge), and Lomandra
longifolia (mat rush) with shrub species such as Tabernaemontana pandacaqui (banana bush) and
Cordyline rubra (narrow-leaved palm lily). The vegetation community is analogous with Vegetation Hazard
Class 8.1 (VHC 8.1) which is described as Wet Eucalypt Tall Open Forest (QFES, 2019). Plate 7 depicts
typical conditions within the open Eucalypt forest surrounding the proposed build location. The remainder
of the vegetation within the 150m assessment area was low threat mowed grass with low density woody
vegetation surrounding the existing on-site sheds and associated with neighbouring allotments.
Plate 7: Tall Open Eucalypt forest with vineforest understorey
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 7
797 Ringtail Creek Road, Pomona
Page 11
2.0 BUSHFIRE HAZARD ASSESSMENT
2.1 STATE ASSESSMENT METHODOLOGY
2.1.1 General
The Noosa Plan 2020 requires a site-specific bushfire hazard assessment to be undertaken when a
development site is located within a mapped Bushfire Hazard Area. Chapter 2, Part 1, Section 8, Item 4(a)
of the Planning Act 2016 states that ‘where there is an inconsistency between a State Planning Policy and
a local government planning instrument, a State Planning Policy applies instead of a local planning
instrument’. The SPP mapping is therefore used as the trigger for assessment against Council’s Bushfire
Hazard Overlay. Furthermore, the site-specific hazard mapping required by the Planning Scheme is to be
prepared consistent with the methodology adopted to prepare the SPP mapping.
The State government have described the methodology used to prepare the SPP mapping in the following
publications:
Natural Hazards, Risk and Resilience –– Bushfire State Planning Policy – state interest guidance
material (The Department of Infrastructure, Local Government and Planning, 2019)
Bushfire Resilient Communities. Technical Reference Guide for the State Planning Policy State
Interest ‘Natural Hazards, Risk and Resilience - Bushfire’ (Queensland Fire and Emergency Services
(QFES), 2019)
QFES, 2019 states that although state-wide bushfire prone area mapping is regularly updated, land use
and vegetation cover (key contributors to bushfire hazard) are subject to change, particularly regarding
the extent of hazardous vegetation. Accordingly, the first step of a bushfire hazard assessment is to
undertake a reliability assessment to determine whether the site’s observed characteristics are consistent
with the inputs used to create the mapping and the mapping outputs. A reliability assessment is therefore
undertaken for the site and all land within 150 metres of the proposed development.
The preparation of a Local Hazard Area Map has been undertaken for the site in accordance with the
methodology described in the above referenced documents. The input parameters used to determine the
bushfire hazard acting on the site are detailed in the sections below.
2.1.2 Vegetation Hazard Classes
Fuel loads need to be determined when preparing a bushfire hazard assessment. The QFES refers to the
process for identifying, classifying and mapping vegetation hazard classes as a Vegetation Hazard Class
Assessment. In accordance with the methodology outlined in Section 6 of the Bushfire Resilient
Communities (QFES, 2019), the following Vegetation Hazard Classes (VHC) were identified within the
assessment area (which includes a 150m buffer surrounding the proposed build location):
VHC 8.1 – Wet Eucalypt Tall Open Forest
VHC 40.4 – Continuous low grass or tree cover
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 8
797 Ringtail Creek Road, Pomona
Page 12
2.1.3 Maximum Landscape Slope
The vegetation influencing the proposed build location is generally located across slope of the
development area or on a slope <2 degrees downslope of the development area. Where the slope under
hazardous vegetation is located across slope, it is considered ‘upslope’ irrespective of the slope of land
between the site and the edge of the hazardous vegetation. Note that for the purposes of undertaking a
bushfire hazard assessment, where the topography is flat or where vegetation is located upslope of an
assessment site, a slope of 1 degree is required to be used to satisfy the mathematical formula, however
it has negligible impact on the calculations.
2.1.4 Fire Danger Index
The Queensland government produce a publicly available data package which includes selected inputs
and information used by the CSIRO in conjunction with the QFES to prepare the State-wide Bushfire
Hazard Area (Bushfire Prone Area) mapping (July 2014). The data includes Fire Weather Severity (Fire
Danger Index - FDI). A review of the dataset for the assessment area indicates that the site is located
within a band of FDI 47.
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 9
797 Ringtail Creek Road, Pomona
Page 13
3.0 LOCAL HAZARD MAP
3.1 GENERAL
The SPP reference documentation sets out the following methodology for preparing a Local Hazard Area
Map:
Categorising the vegetation within the site in accordance with the vegetation hazard classes
derived from QFES (2019)
Using the patch and corridor filtering process to remove narrow corridors and small patches of
hazardous vegetation
Subdividing the identified vegetation hazard classes into bushfire hazard sub-units based on
slope differences and vegetation hazard classes
Assigning SPP Potential Bushfire Intensity classes to the sub-units
Application of 100m Potential Impact Buffers to the amended sub-units to derive an overall Local
Hazard Map.
3.2 PATCH AND CORRIDOR FILTERING
Section 4.2.6 of Bushfire Resilient Communities (QFES, 2019) outlines the patch and corridor filtering
process to modify potential intensity of small patches and corridors (based on Leonard et. al. 2017). The
process involves the following three stages:
Merging small patches of a single Vegetation Hazard Class less than 0.5ha
Merging small Vegetation Hazard Class patches between 0.5 and 1ha with higher or moderate
fuel loads (greater than 8 tonnes/ha)
Removing narrow corridors of vegetation less than 50m wide through a process of patch erosion
and dilation. These small patches are merged with surrounding vegetation by allocating a patch
to the Vegetation Hazard Class that is most common to the patch boundary.
3.3 CALCULATION OF POTENTIAL BUSHFIRE INTENSITY
The Potential Bushfire Intensity of each identified sub-unit has been calculated by inputting the site-
specific input parameters discussed in Section 2.1 into the FLAMESOL computer model. FLAMESOL uses
industry standard bushfire equations and allows numerous input variables to be adjusted including fuel
loads, fire danger index, site slope and distance to vegetation. Table 1 details the Potential Bushfire
Intensity classes and their corresponding potential fire-line intensity (KW/m) values as prescribed within
Leonard et. al. 2017.
Table 1 – Potential Bushfire Intensity Classes
POTENTIAL BUSHFIRE INTENSITY POTENTIAL FIRELINE INTENSITY
Very High >40,000 kW/m
High 20,000-39,999 kW/m
Medium 4,000 – 19,999 kW/m
Figures 1-3 are presented below and have been prepared as per the above referenced methodology.
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 10
797 Ringtail Creek Road, Pomona
Page 14
BUSHFIRE HAZARD ASSESSMENT 797 RINGTAIL CREEK ROAD, POMONA FIGURE 1 VEGETATION HAZARD CLASSES LEGEND 797 RINGTAIL CREEK RD, POMONA 3 150m ASSESSMENT BUFFER HE vrorosep suit Location VHC 8.1 - WET EUCALYPT TALL OPEN FOREST [__] vic 40.4- conTINUOUS LOW GRASS OR TREE COVER ) UNIT OF VEGETATION REMOVED AS PER PATCH “ & CORRIDOR FILTERING PROCESS COPYRIGHT © 2021
Page 15
Sub Unit 1 - VHC 40.4 Combined Surface and Near Surface Fuel Load (t/ha) Total Fuel Load (t/ha) Maximum | Potential Landscape Slope (degrees) Fireline Intensity (kw/m) Potential Bushfire Intensity 20 40 60 80 Sy Sub Unit 2 - VHC 8.1 Combined . | Maximum | Potential 5 Surface and Total Fuel | land Fireli Potential otal Fuel | Landscape ireline " Near Surface P Bushfire Fuel Load Casio (e/a) ( —. ) i Intensity (t/ha) egrees BUSHFIRE HAZARD ASSESSMENT 797 RINGTAIL CREEK ROAD, POMONA FIGURE 2 HAZARD SUB-UNITS LEGEND 797 RINGTAIL CREEK RD, POMONA 4 150m ASSESSMENT BUFFER HBB PoP sep BUILD Location | LOW POTENTIAL BUSHFIRE INTENSITY Dj HIGH POTENTIAL BUSHFIRE INTENSITY COPYRIGHT © 2021
Page 16
BUSHFIRE HAZARD ASSESSMENT 797 RINGTAIL CREEK ROAD, POMONA FIGURE 3 LOCAL HAZARD MAP LEGEND 797 RINGTAIL CREEK RD, POMONA r ~~") 150m ASSESSMENT BUFFER L HE Prorosep Buin Location LJ HIGH POTENTIAL BUSHFIRE INTENSITY Sy POTENTIAL IMPACT BUFFER AREA COPYRIGHT © 2021
Page 17
4.0 SETBACKS
The site assessment undertaken above has concluded that the proposed dwelling is to be located within
a High Potential Bushfire Intensity area (refer to Local Hazard Map presented as Figure 1). Therefore,
sufficient setbacks from hazardous vegetation should be implemented to reduce the risk of possible
uncontrolled wildfire events to the dwelling.
There are no specific setback criteria for a Material Change of Use development application under the
Noosa Plan Bushfire Hazard Overlay Code or the SPP Assessment Benchmarks. Assessment Benchmark 4
of the State Planning Policy – state interest guidance material states: Development supports, and does
not hinder, disaster management response or recovery capacity or capabilities. Where reconfiguring a lot
creating lots of greater than 2000 square metres, to ensure emergency access and operational space for
firefighters the subdivision layout results in lots that are sited so that they are separated from the closest
edge to the adjacent medium, high or very high potential bushfire intensity area by a distance that
achieves a radiant heat flux level of 29 kilowatt per square metre or less at:
1. The building envelope, if identified at RaL stage, or
2. Where a building envelope is not identified, at all the lot boundaries.
Compliance with Assessment Benchmark 4 can be attained where proposed dwellings are sufficiently
separated from the nearby forest hazard so that a radiant heat flux level at any point on the building does
not exceed 29 kW/m². The setback must be maintained as a dedicated Asset Protection Zone which
comprises only low threat vegetation, such as maintained lawns and cultivated gardens or are designed
to ensure a potential available fuel load is maintained at less than 8 tonnes/hectare in aggregate and with
a fuel structure that remains discontinuous.
Whilst it is acknowledged that the application is not for a reconfiguration of a Lot development approval,
it is considered that the 29kW/m2 minimum separation prescribed in Assessment Benchmark 4 is a
suitable minimum setback to be applied to the proposed dwelling. The separation required to achieve
<29kW/m2 radiant heat flux is equivalent to a BAL 29 construction standard under AS3959:2018.
4.1 SETBACK CALCULATIONS
Modelling has been undertaken to determine the setback distance required for the dwelling to achieve
the recommended 29kW/m2 separation. The models used comprise industry standard bushfire equations
using the FLAMESOL computer model. The FLAMESOL Minimum Distance calculator has been used and
comprises an AS3959 Method 2 based calculator which can determine a suite of bushfire behaviour
variables including the minimum distances required to achieve a range of different radiant heat level
exposures. The quantitative modelling output has been used to identify the setback requirements to
achieve the recommended <29 kW/m² radiant heat flux setback and achieve a BAL 29 construction
standard under AS3959. The modelling output is shown in Plate 8 and summarised in Table 2.
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 14
797 Ringtail Creek Road, Pomona
Page 18
Plate 8: Flamesol Modelling
Table 1. Radiant Heat Flux Minimum Setbacks to secure <29kW/m²
Vegetation Description <29 kW/m² Minimum Setback
VHC 8.1 – Wet Eucalypt Tall Open Forest 25.3m
As per Table 2, it is recommended that the proposed new dwelling shall be provided with a dedicated
Asset Protection Zone (APZ) with a width of 26m from the adjacent High Potential Intensity Area
associated with the VHC 8.1 vegetation surrounding the dwelling. This setback would also provide a BAL
29 construction standard to the proposed dwelling under AS3959:2018. Section 4.2 prescribes the specific
management requirements of the APZ.
The new dwelling is proposed approximately 10m from the eastern allotment boundary and 20m from
the southern boundary. It is noted that a 26m setback is not available to be provided within the extent of
the allotment boundary to the south and east. This is considered acceptable as the boundaries adjoin
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 15
797 Ringtail Creek Road, Pomona
Page 19
existing cleared areas in these locations including maintained access driveways within adjoining
allotments which can contribute to the APZ required to safely locate the dwelling.
4.2 VEGETATION MANAGEMENT WITHIN ASSET PROTECTION ZONE
The Asset Protection Zone is required to be maintained in a low fuel state in perpetuity. Assessment
Benchmark 5 of the SPP Bushfire 2019 seeks that the site layout places the landscape and open spaces
within the site between premises and adjacent mapped medium, high or very high potential bushfire
intensity areas. This landscaping and open space comprises protective landscape treatments that:
1. Comprise only low threat vegetation (e.g., maintained lawns and cultivated gardens); or
2. Are designed to ensure a potential available fuel load is maintained at less than 8 tonnes/hectare in
aggregate and with a fuel structure that remains discontinuous. The vegetation contained within the
dedicated Asset Protection Zone shall satisfy Assessment Benchmark 5 of the SPP Bushfire 2019 and the
low threat vegetation criteria prescribed in Section 2.2.3.2 of AS3959.
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 16
797 Ringtail Creek Road, Pomona
Page 20
5.0 CONCLUSION
A bushfire hazard assessment has been completed for Lot 4 on RP213871 located at 797 Ringtail Creek
Road, Pomona, and has identified that the vegetation present within and adjoining the site comprises an
overall risk rating of a High Potential Bushfire Intensity hazard. A 26m wide Asset Protection Zone has
been recommended to be implemented around the dwelling to achieve a minimum 29kW/m2 separation
as prescribed within Assessment Benchmark 4 of the State Planning Policy – State interest guidance
material – Natural hazards, risk and resilience – Bushfire (2019). This setback would also provide a BAL 29
construction standard to the proposed dwelling under AS3959:2018.
Bushfire can be unpredictable and requires adequate preparatory planning and actions to be undertaken
to minimise impacts to property and potential loss of life. This assessment has been prepared with
consideration of site conditions observable at the time of inspection, the distance between the proposed
development and potentially hazardous vegetation, the extent of fragmentation occurring within the
landscape and the nature of the development proposed. The hazard assessment methodologies
described in this report are not based on assessments of catastrophic bushfire events which may occur
from time to time. The unpredictable nature of bushfires prevents any guarantee being provided that the
area will not be affected by bushfire at some time. Property owners and site users should be aware of the
potential consequences of such events and should take responsibility for the protection of property and
personnel accordingly.
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 17
797 Ringtail Creek Road, Pomona
Page 21
6.0 REFERENCES
Leonard, J., Opie, K. (2017). Estimating the potential bushfire hazard of vegetation patches and corridors.
An enhancement of Queensland’s methodology for State-wide mapping of bushfire prone areas. CSIRO
Land & Water, Australia.
Noosa Plan 2020 - Bushfire hazard overlay code and PSP8 Planning scheme policy for Natural Hazards.
Noosa Shire Council.
Queensland Fire and Emergency Services. (2019). Bushfire Resilient Communities - Technical Reference
Guide for the State Planning Policy - State Interest Guideline - Natural Hazards, Risk and Resilience 2-
Bushfire.
The State of Queensland, Department of State Development, Manufacturing, Infrastructure and Planning
(2019). Natural hazards, risk and resilience - Bushfire State Planning Policy – state interest guidance
material.
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 18
797 Ringtail Creek Road, Pomona
Page 22
APPENDIX A – PRELIMINARY BUILDING PLANS
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 19
797 Ringtail Creek Road, Pomona
Page 23
RINGTAIL CREEK RO
AD
92° 20' 20"
SHEET NUMBER SHEET TITLE
210.790 m
1 Site plan
Exis ti
2 Floor Plan
ng P ro
perty
M aintain
ce T r
3 Elevations
ack
4 Section A
5 Subfloor Layout
6 Bracing Layout
347° 26
129.20
7 Bracing Details
' 00"
0m
8 Notes
Existing Shed
9 Work Place
Health & Safety
Notes
Existin
g Pro
166° 5
196.49
pert y M
4' 00"
aintain
0m
ce Tr a
ck
268° 00' 00"
96.800 m Extent of Vegetation Clearing
Approx. 2900 m²
Min
355° 55' 00"
10 00 0
77.450 m
NORTH Exempt Vegetation Clearing
1070 m²
Proposed
Dwelling
Structural Details supplied by Engineer take Precedence
over those on these plans or,
Plans Structural Elements shown to be confirmed
20000
45,000 L by an RPEQ Certified Structural Engineer with
Water tank
a Form 15 issued. Reinforced Concrete Slab & Footings
270° 00' 30" designed, then to be provided to Building Certifier
124.790 m Any Alterations to the design or substitution of structural members
Real Property Description
Site Plan Exempt Vegetation Clearing from approved design plans with out the written consent from
Lot No. 4 on RP. 213871
Locality: Pomona
1 1 : 1000
Steven Horn Accolade Building Designs
will void any responsibilities we have for the
structural integrity or performance of the building
Address: 797 Ringtail Creek Rd.
Site Area: 34073
THESE DRAWING ARE SUBJECT TO COPYRIGHT NO PART MAY BE
COPIED OR REPRODUCED OTHER THAN FOR THE PURPOSE OF THIS
CONSTRUCTION WITHOUT WRITTEN CONSENT FROM STEVEN HORN,
ACCOLADE BUILDING DESIGN & DRAFTING
Client: Scott Stewart Address: 797 Ringtail Creek Rd. Pomona Noosa Shire Council Mobile: 0407 693 018 Date 25/10/2021 7:43:16 AM
ACCOLADE Building Designs Drawn by; S.Horn Drawn for A3 Sheet
RPD: Lot 4 on RP 213871 Site Area : 34073 m² Wind Classification N3 Proprietor: Steven Horn Email: [email protected]
Project Number 0521SS
Proposed Residence SHS & Timber Posts , Timber Framed, Sheet Roof QBSA Lic. 54806 Issue Date: 25 - OCTOBER -2021 Scale 1 : 1000 Sheet No. 1 of 9
Page 24
600 600
15360
4680 3000 4680 3000
Door Schedule
90 70 90 90 90
2430 2000 4500 Mark Height Width Comments Location Lintel Jamb Studs
70 3530 D1 2100 4320 Bifolds Kitchen Engineers details Engineers
750 1680 1250 750 D2 2100 1800 Alum Slider Kitchen 130x42 LVL 15 2
3/Jamb Studs to RB1 D3 2040 820 External Laundry 90x45 MGP12 2
D4 2100 3200 Alum Stacker Bed 1 200x42 LVL 15 3
600
W6 Walls 2400 high W7 RB1 W8 W9 RB1 Doors to Comply with Nominated BAL
90
90
100
WM
1000
LT Window Schedule
D3
SHR WC WC
1650
2000
720 C/S
W5
70
Pantry/Laundry PWD
VTY EF
Mark Height Width Comments Location Lintel Jamb Studs
1500
B W1 1800 1500 Alum Slider/Trans Bed 1 130x42 LVL15 2
600 350
Shelves
90
ENS W2 1800 1500 Alum Slider/Trans Bed 1 130x42 LVL15 2
720 C/S REF OHC
Space RH W3 1200 1800 Alum Slider Bed 1 130x42 LVL15 2
70
HP W4 1200 1800 Alum Slider WIR 130x42 LVL15 2
600
Breezeway
1000
Kitchen UBO
W10
W5 1200 1800 Alum Slider ENS 130x42 LVL15 2
3030
WIR Cabinets By Others KS
2100
W6 1200 900 Alum Slider ENS 90x45 MGP12 2
900
D2
W4
Shelves Drawers Hanging
By Others W7 1200 900 Alum Slider ENS 90x45 MGP12 2
8590
900
Island Bench W8 1000 1500 Alum Slider Laundry 130x42 LVL15 2
600
W9 900 600 Alum Slider Powder 90x45 MGP12 2
70
530
10390
10590
90
W10 1000 1500 Alum Slider Kitchen 90x45 MGP12 2
Carport
D1 Windows to Comply with Nominated BAL
Metal Screening to All windows
CF S CF
W3
D4
3600
3290
Bed 1
5190
Alfresco
90
W2 W1
Legend
CF; CEILING FAN
1900
2000
2000
Deck Area EF; EXHAUST FAN
WC; TOILET
RB2 RB2
100
100
VTY; VAINTY
100
SHR; SHOWER
600
B; HAND BASIN
REF; REFRIDGERATOR
WM; WASHING MACHINE
LT; LAUNDRY TUB
A RH; RANGE HOOD
4 FLOOR AREAS HP; HOT PLATES
UBO; UNDER BENCH OVEN
Living Areas: 65.0 m² KS; KITCHEN SINK
Deck Areas: 65.9 m² OHC; OVER HEAD CUPBOARDS
785 2930 785 Carport Area: 31.8 m² S SMOKE DETECTORS
4500 4500
90 90 90 90
2190 2190 3000 2190 2190
100 100 100 100 100 100
Floor Plan
1 1 : 100
Client: Scott Stewart Address: 797 Ringtail Creek Rd. Pomona Noosa Shire Council Mobile: 0407 693 018 Date 25/10/2021 7:43:17 AM
ACCOLADE Building Designs Drawn by; S.Horn Drawn for A3 Sheet
RPD: Lot 4 on RP 213871 Site Area : 34073 m² Wind Classification N3 Proprietor: Steven Horn Email: [email protected]
Project Number 0521SS
Proposed Residence SHS & Timber Posts , Timber Framed, Sheet Roof QBSA Lic. 54806 Issue Date: 25 - OCTOBER -2021 Scale 1 : 100 Sheet No. 2 of 9
Page 25
Pitching Level
2740
W5 W4 W3 W10
D4
Decks to be less than
1000 mm above Ground Ground Floor
0
Carport
East Elevation
4 1 : 100 West Elevation
1 1 : 100
Door Schedule
Mark Height Width Comments Location Lintel Jamb Studs
D1 2100 4320 Bifolds Kitchen Engineers details Engineers
D2 2100 1800 Alum Slider Kitchen 130x42 LVL 15 2
D3 2040 820 External Laundry 90x45 MGP12 2
D4 2100 3200 Alum Stacker Bed 1 200x42 LVL 15 3
Window Schedule
Mark Height Width Comments Location Lintel Jamb Studs W2 W1
D1
W1 1800 1500 Alum Slider/Trans Bed 1 130x42 LVL15 2
W2 1800 1500 Alum Slider/Trans Bed 1 130x42 LVL15 2 Breezeway
W3 1200 1800 Alum Slider Bed 1 130x42 LVL15 2
W4 1200 1800 Alum Slider WIR 130x42 LVL15 2 Carport
W5 1200 1800 Alum Slider ENS 130x42 LVL15 2
W6 1200 900 Alum Slider ENS 90x45 MGP12 2
W7 1200 900 Alum Slider ENS 90x45 MGP12 2
W8 1000 1500 Alum Slider Laundry 130x42 LVL15 2
W9
W10
900
1000
600
1500
Alum Slider
Alum Slider
Powder
Kitchen
90x45 MGP12
90x45 MGP12
2
2 North Elevation
3 1 : 100
Breezeway
W7 W6 South Elevation
Laundry
ENS
2 1 : 100
Carport
Client: Scott Stewart Address: 797 Ringtail Creek Rd. Pomona Noosa Shire Council Mobile: 0407 693 018 Date 25/10/2021 7:43:18 AM
ACCOLADE Building Designs Drawn by; S.Horn Drawn for A3 Sheet
RPD: Lot 4 on RP 213871 Site Area : 34073 m² Wind Classification N3 Proprietor: Steven Horn Email: [email protected]
Project Number 0521SS
Proposed Residence SHS & Timber Posts , Timber Framed, Sheet Roof QBSA Lic. 54806 Issue Date: 25 - OCTOBER -2021 Scale 1 : 100 Sheet No. 3 of 9
Page 26
Notes for Construction & Maintenance of Timber Decks:
Builder to adhere to BCA Part 3.10.6 & to Manufactures Engineers specifications or industry standards at all times & Timber Queensland recommend that all timber has a moisture content of 15%
Owners to follow manufactures details for maintenance & cleaning of deck Decking boards to be fixed with 2/nails or screws & staggered or offset along the joists. Holes at ends of boards to be
All timber posts to be naturally durable Class 1 or 2 above ground or softwoods H3 treated if supported on bracket if in drilled holes to be 80% of nail diameter & 12mm from ends of boards. Nails & screws to finish flush with top of boards (Not
ground to be H5 Treated soft or hardwood. Punched). Nails or screws to be hot dipped galvanized or stainless steel. Stainless Steel to be used within 900 mm of
Recommend brackets or supports be used & Bitumen paint be applied to the top 200 mm of bracket in the concrete. pools
Posts to have a Minimum 75 mm clearance from the base of the post to footing or slab & post to be 10 mm above cross All Framing Anchors, Fixing Plates, Nailing Plates, Joist hangers to be Galvanised Minimum or Stainless Steel where
member of bracket. End grain of post to be sealed prior to erecting. Construction within 2.0 km radius of open coastal areas
Top of concrete pad footing to be mounded to fall away from support to prevent water from ponding Ends of boards to be slightly undercut at joints. Gaps between decking boards to be min 3 mm to 5 mm
Bearers, Hardwood to be H3 treated if less than 400 mm above ground H4 for touching ground H5 for in ground. (Check with supplier Gaps range with different Types of timbers)
Joists as bearers depending on ground clearance. Joists to have Malthoid strip or an, approved proprietary joist protection Decking boards to be fully sealed (Oiled, Stained, Painted etc.) prior to fixing.
system, fixed to top of joists. Softwood & Engineered manufactured timbers bearers & joists to be H3 min treated at all Recommend a light coloured sealer, with UV protection and a fungicide to be used
times. Approved connectors be used for treated timbers & location.
Recommend hot dip galvanized or stainless steel connectors & fixings be used at all times. Especially where inspections Maintenance & inspection of deck by Owner is to be carried out regularly
are not possible deck is to close to ground or decking to be screwed in place to allow for easy removal to inspect sub-floor Sweep or blow, leaf or other debris off deck. Hosing or use of water to be avoided. Keep the gaps between decking boards
for any issues clear of dirt & debris.
Reseal decking boards when required by manufactures recommendations
Inspect all connections for corrosion or movement regularly (Twice Yearly)
Pot plants to be on stands with a drip tray underneath & moved around regularly to prevent uneven weathering of the deck
600 Accolade Building Designs recommends that Builder & Home Owners read Domestic Deck Design Guide 600
Available on line www.timber.net.au
Custom Orb Roof sheets
Fixed to Manufactures details for N3 Wind Classification
Approved type roof Trusses to Manufacturers @ 900 Ctrs 5° Approved type roof battens @ 900 Ctrs
30 mm Galv looped strap or 2/Framing anchors (Triple Grips Fixed to Manufacturers details for N3 Wind Classification
4/30 mm nails per leg)
Approved type metal gutter guard
as required by BAL
Colorbond metal Fascia & Gutter
RB1: Roof beam 2/M12 bolts to posts
Manufactured beams to be protected Approved type 6 mm FC Sheet to Soffit
from weather as per Manufacturers details and BAL Requirements Top plates 2/90x45 MGP12
C2: Hardwood Timber Posts Approved type timber for BAL Rating
Ceiling Hgt 2700
W3 W4 W5
2400
Tie-down 12 mm rods from subfloor to top plates
Hardwood Timber decking boards to joists Studs 90x35 MGP 12 @ 450 Ctrs
Approved type timber for BAL Rating
Cladding to comply with BAL supplied by
an Approved Qualified person
J2: Hardwood Timber Joists @ 450 Ctrs 1/framing anchor 4/30 mm nails per leg
Joist protector strips to top of Joists Approved type timber for BAL Rating Bottom Plates 90x45 MGP12
J1: Joists at 450 Ctrs 1/Framing anchor 4/30 mm nails peer leg
@ Joists under outer walls
Less than 1000
C2: Hardwood Timber Bearers Approved type timber for BAL Rating
2/M12 bolts to Posts
B1: Bearers 2/M12 bolts to C1
Min 400
Pryda PSQ600100/12
Post support bracket 2/M12 bolts to posts
C1: Galv SHS posts to Engineers details
N12 Cranked through support 1000 mm in length
Bitumen paint to Posts min top 200 mm in concrete
Concrete pad footings to Engineers details
Ground Under Floor & Decks to be have ALL vegetation removed and be Graded so Groundwater Does Not Pond Under Floors
Section A
A 1 : 50
Engineers Details to Take
Precedence Over Shown Details
Client: Scott Stewart Address: 797 Ringtail Creek Rd. Pomona Noosa Shire Council Mobile: 0407 693 018 Date 25/10/2021 7:43:19 AM
ACCOLADE Building Designs Drawn by; S.Horn Drawn for A3 Sheet
RPD: Lot 4 on RP 213871 Site Area : 34073 m² Wind Classification N3 Proprietor: Steven Horn Email: [email protected]
Project Number 0521SS
Proposed Residence SHS & Timber Posts , Timber Framed, Sheet Roof QBSA Lic. 54806 Issue Date: 25 - OCTOBER -2021 Scale 1 : 50 Sheet No. 4 of 9
Page 27
12360 3000
75 75 75 75 75 75 75 100
2228 2228 1463 1463 2228 2228 2900
C1: Galv. SHS posts 75x75x5 mm (to Engineers details)
C2: Hwd Posts 100x100 F14 on Pryda PSQ600100/12
B1: Bearers 170x58 Smart LVL 15 H3 Cont/span H3
150 Min - finished ground
C1 C1 C1 C1 C1 C1 C1 C2
B2: Bearers 150x75 F14 H3 Cont/Span Joists
100
75
75
J1: Joists 130x42 Smart LVL 15 Cont/Span
B1 B2 B1 DJ1: Double joists under Outer walls Bearers
J2: Joists 125x50 Uns Hwd F14 Cont/span Single span for 2000 span
2157
2157
DJ1
DJ1
DJ1
DJ1
GS
400
Min
GS: 30 mm Gal Straps to joists Between 30°to 60°
1/50x3.15 mm hot-dipped Gal flat head deformed nail per joist
C1 C1 C1 C1 C1 C1 C1
75
75
B1 B2 B1
J2
2157
J1
J1
2918
2000
C1 C1 C1 C1 Dia
g o na
75
l 1
86 5
B1 B2 C1 7 C1 C1
10590
75
10390
2157
B1
1395
J2
C1 C1 C1 C1 C1 C1 C1 Subfloor Levels
2
75
75
B1 B2 B2 1 : 30
1745
1745
GS
C1 C1 C1 C1 C1 C1 C1
75
75
B1 B2 B2
1900
1900
J2
GS GS
M10 Bolts - 15kN
C2 C2 C2 C2 C2 C2 C2 C2 M12 Bolts - 20kN
100
100
B2 B2 B2
Double joists or
450mm long full depth cleat
2190 2190 1450 1450 2190 2190 Nailed to joists with
100 100 100 100 100 100 100 6/75x3.15mm nails
BRACING WALL TO FLOOR JOISTS
Sub-Floor Layout (WALL PERPENDICULAR TO TRUSSES)
1 1 : 100
2/ Framing anchors at
Each end of blocking M10 Bolts - 15kN
6/nails per face M12 Bolts - 20kN
Solid packer plate to suit 100x50 F14 Hwd. or 120x45 MGP12
blocking piece on edge
BRACING WALL TO FLOOR JOISTS
(WALL PARALLEL TO TRUSSES)
Bracing Wall - Floor Joists
3 1 : 30
Client: Scott Stewart Address: 797 Ringtail Creek Rd. Pomona Noosa Shire Council Mobile: 0407 693 018 Date 25/10/2021 7:43:19 AM
ACCOLADE Building Designs Drawn by: S.Horn Drawn for A3 Sheet
RPD: Lot 4 on RP 213871 Site Area : 34073 m² Wind Classification N3 Proprietor: Steven Horn Email: [email protected] Project Number
0521SS
Proposed Residence SHS & Timber Posts , Timber Framed, Sheet Roof QBCC Lic. 54806 Issue Date 25 - OCTOBER -2021 Sheet No. 5 of 9
Page 28
DIRECTION A
Required 32.5 kN Supplied 33.9kN
10.6 kN 10.6 kN
1.8 (FC) 1.8 (FC)
W6 W7 RB1 W8 W9 RB1
Door Schedule
0.9 (FC)
5.3 kN
D3
1.8 (FC)
10.6 kN
Mark Height Width Comments Location Lintel Jamb Studs
W5
5.3 kN D1 2100 4320 Bifolds Kitchen Engineers details Engineers
D2 2100 1800 Alum Slider Kitchen 130x42 LVL 15 2
1.8 (FC)
0.9 (FC)
10.6 kN
D3 2040 820 External Laundry 90x45 MGP12 2
0.9 (FC)
5.3 kN
D4 2100 3200 Alum Stacker Bed 1 200x42 LVL 15 3
Required 60.2 kN Supplied 60.3kN
W10
D2
W4
1.8 (FC)
10.6 kN
1.2 (FC)
6.3 kN
DIRECTION A
Window Schedule
0.9 (FC)
5.3 kN
Mark Height Width Comments Location Lintel Jamb Studs
D1
W1 1800 1500 Alum Slider/Trans Bed 1 130x42 LVL15 2
W2 1800 1500 Alum Slider/Trans Bed 1 130x42 LVL15 2
W3
D4
Roof Braced to Manufacturers details W3 1200 1800 Alum Slider Bed 1 130x42 LVL15 2
W4 1200 1800 Alum Slider WIR 130x42 LVL15 2
W5 1200 1800 Alum Slider ENS 130x42 LVL15 2
1.2 (FC)
6.3 kN
W6 1200 900 Alum Slider ENS 90x45 MGP12 2
W7 1200 900 Alum Slider ENS 90x45 MGP12 2
W8 1000 1500 Alum Slider Laundry 130x42 LVL15 2
W2 W1 W9 900 600 Alum Slider Powder 90x45 MGP12 2
1.4 (FC)
7.4 kN W10 1000 1500 Alum Slider Kitchen 90x45 MGP12 2
RB2 RB2
Wind Bracing determined from AS1684.2 for N3 sites Roof Beams
: 12mm Tie-down rods @ 1200 crs max & 100 from Openings & corners RB1: 240x58 Smart LVL 15
RB2: 200x58 Smart LVL 15 Cont/Span
1.0 (VB) Denotes 6mm thick Villa board fixed to Manufactures detail
to supply 5.3 kN/m as per Hardies Bracing Manual
Bracing Layout
1 1 : 100
Client: Scott Stewart Address: 797 Ringtail Creek Rd. Pomona Noosa Shire Council Mobile: 0407 693 018 Date 25/10/2021 7:43:20 AM
ACCOLADE Building Designs Drawn by; S.Horn Drawn for A3 Sheet
RPD: Lot 4 on RP 213871 Site Area : 34073 m² Wind Classification N3 Proprietor: Steven Horn Email: [email protected]
Project Number 0521SS
Proposed Residence SHS & Timber Posts , Timber Framed, Sheet Roof QBSA Lic. 54806 Issue Date: 25 - OCTOBER -2021 Scale 1 : 100 Sheet No. 6 of 9
Page 29
50 mm max no Tie-down rods
150mm max Top & Bottom
UPLIFT CAPACITY OF BEAM/LINTEL TIE-DOWN CONNECTIONS
Nail Centres:
150mm top & bottom plates
150mm Vertical edges
200mm intermediate studs Max 100 mm
M12 Rod through top plate
Uplift Capacity
to be placed at each end of wall & Bolt or Strap
between at Max 1800mm crs (UNO) Unseasoned Timber Seasoned Timber
4/nails each end of strap M10 bolt to floor
250
Solid Nogging
17 12 8.4 12 9.8 7.4
Lintel
6/nails each end of strap M12 bolt to floor
250
150mm
12 mm Min
17 17 12 17 14 10
100 mm max 30x0.8 G.I strap
Studs as Nominated No. of nails as per table
no Tie-down rods
The top plate shall be fixed or tied to the lintel
within 100 mm of each rafter/truss, or the
rafter/truss fixed directly to the lintel with a fixing
of equivalent tie-down strength to that required
250
Bolt to slab or floor frame Opening for the rafter/truss
200mm
12 mm Min Top & Bottom
Max 100 mm
Tie-Down Requirement From AS 1684.2
Table 9.20 (b)
Note: Where rod spacing's exceeds 1200mm,
Provide M10 bolts to bottom plate,
At Max 1200 mm enters
50mm
(a) Vertical Hardies Hardieflex Sheet (Min 6 mm thick)
To Supply 5.3kn/m on Timber Frames Tie-down rods
Nailing plates or framing anchors (Legs not bent)
to either end of Noggings 6/2.8 nails each leg
2/100 mm batten screws each side
Internal bracing wall Blocks to be on both side of
Top plate Ceiling battens fixed with Battens fixed to bracing wall with Rafter or Truss bottom chord
Min 1/3.05mm Ø nail Stud size shear blocks
2/3.05mm Ø nails per batten Min Stud Size Noggings large enough to avoid splitting
either side of wall Shear blocks nailed or bolted
Drill 13.5mm Ø hole into batten and Shear block
2/100 mm batten screws
to allow for truss deflection each block
30x0.8mm GI straps with
Stud nails each end of strap as Rafter or Truss
required per table Rafter or Truss
Gap must be provided to Rafter or Truss Gap must be provided to
External wall allow for truss deflection allow for truss deflection
Provide clearance Bracing Wall Bracing Wall
where roof is trussed
Stud
BRACING WALL TO CEILING DIAPHRAGM BRACING WALL TO CEILING DIAPHRAGM
BRACING WALL TO EXTERNAL WALL Bracing Wall (TRUSSES PARALLEL TO WALL) (TRUSSES PERPENDICULAR TO WALL)
BRACING WALL TO CEILING DIAPHRAGM
CAPACITIES OF SHEAR BLOCKING (TRUSSES PARALLEL TO WALL) CAPACITIES OF SHEAR BLOCKING CAPACITIES OF SHEAR BLOCKING
No. of Straps No. of Nails Capacity Fixing Method Capacity Fixing Method Capacity
1 4/2.80mm Ø 3.3kN 6/3.05mm Ø Nails 5.0kN/Batten 6/3.05mm Ø Nails 5.0kN/Batten
CAPACITIES OF SHEAR BLOCKING
1 6/2.80mm Ø 4.9kN 6/3.33mm Ø Nails 5.5kN/Batten 6/3.33mm Ø Nails 5.5kN/Batten
4/2.80mm Ø 6.6kN
Fixing Method Capacity
2 1/M12 Bolt 5.1kN/Batten 1/M12 Bolt 5.1kN/Batten
2/3.05mm Ø Nails 1.8kN/Batten
2 6/2.80mm Ø 9.8kN 2/Batten Screws 6.9kN/Batten 2/Batten Screws 6.9kN/Batten
Client: Scott Stewart Address: 797 Ringtail Creek Rd. Pomona Noosa Shire Council Mobile: 0407 693 018 Date 25/10/2021 7:43:21 AM
ACCOLADE Building Designs Drawn by; S.Horn Drawn for A3 Sheet
RPD: Lot 4 on RP 213871 Site Area : 34073 m² Wind Classification N3 Proprietor: Steven Horn Email: [email protected]
Project Number 0521SS
Proposed Residence SHS & Timber Posts , Timber Framed, Sheet Roof QBSA Lic. 54806 Issue Date: 25 - OCTOBER -2021 Scale 1 : 30 Sheet No. 7 of 9
Page 30
GENERAL SPECIFICATION Construction Notes
Written Dimensions take Precedence over scale If in doubt call Accolade Building Designs Timber Frame: Framing to be built in accordance with AS 1684 Termite protected timbers shall be used on all framing
Builder to verify all dimensions & levels on site prior to commencement of work Approved type flashing & sarking to be attached between cladding & frame along with slab & frame to prevent moisture getting to the frames
All boundary setbacks to be strictly adhered to as minimum setbacks apply All wet areas to be made waterproof or resistant to comply to AS 3740 & BCA 3.8.1
Verify location of all services on site & all floor levels allow for connection to these services Linings used shall be approved for use in wet areas & shall be fixed in strict accordance
All building work to be carried out to Australian Standards & to the relevant building codes of Australia with Manufactures specifications. Recommended that all showers have a waterproofed hob
Builder to supply footpath protection & show required signage to comply to council regulations & Water stops or vertical barriers in the waterproofing system be installed to prevent passage of moisture in the floor to non wet areas of building
comply to the Workplace Health & Safety act. Recommend Laundry floor to have a dry waste in floor & grade floor to it or to door to allow for overflow
Wet Areas include Bathrooms Ensuite Laundry & WC or Powder rooms
Builder to supply sediment control where needed
All work to comply to the National Construction Codes 2014 Tiled areas: Tiles to laid or fixed to a clean dry substrate to comply to AS 3958
Termite protection to AS. 3660.1 2/durable notices to be installed in prominent locations stating Ensure water proofing is dry & is suitable for the adhesives or grouts to be applied to
method of protection, Date of installation, Life expectancy & frequency of inspections Ensure the correct tile is being used for the application (Example.. Floor tiles on Floors)
Smoke alarms to comply to AS. 3786 -2014
All walls to be checked to ensure they are fixed correctly, straight & plumb prior to fixing plasterboard or interior lining
Concrete Footings to be designed by Engineers from Soils Tests & to comply with AS. 2870 Plasterboard or interior linings to be fixed to dry frames in strict compliance with manufactures details. Setting of plasterboard to be done in strict
All structural Timbers to comply with National Timber Framing Codes AS. 1684.2 & AS . 1720 & compliance with manufactures specifications, Sanded to provide a flat smooth finish
Construction Timbers Queensland(CTIQ)
All Steelwork to comply to AS. 4100 for steel structures Painting: Paints & application to comply to AS 2311 Min 3 coat application system to be used
Roof trusses to be designed by manufacture & Certified, Substrate to be clean & dry correct type sealers & primers to be used for substrate
If paint is sprayed on then a back roll should be done between coats & after final coat
Lighting to comply with AS.1680.1 & B.C.A. Volume 2 Part 3.8.4.2 & 3 Mould resistant paint to be used in Bathrooms, Ceilings to have approved ceiling paint applied & be a matt finish
Electrical installations to comply to AS. 3000 & other relevant regulations
Plumbing & drainage to comply to AS. 3500 Hot water system to AS. 3500 4.1 All external manufactured timbers to be H3 Treated & sealed painted or encased made weather proof
Internal Wet Areas to comply to AS. 3740 as in B.C.A. Volume 2, Part 3.8.1 in strict accordance with the manufactures specifications
External waterproofing to comply to AS. 4654
Concrete Footings to be poured to Structural Engineers Specifications & in accord with AS 2870
Windows & Glazing to AS.2047 -1999 Screening or security screens to comply to
relevant regulations. Type of glass used to be determined by Energy Efficiency Consultant Approved type flooring (Structaflor 19 mm Yellow tongue) to be used for Suspended timber floor fixed to Manufactures specifications
Plasterboard to AS. 2589 Painting to AS. 2311 Tiling to AS. 3958 Wet areas to use Hardies Scyon Secura internal flooring, waterproofed & Tiled in accord with relevant standards
Insulation to roof cavity & walls to be determined by Licensed Energy Efficiency Consultant to
Comply to Australian. & QLD. Standards & requirements All external windows & doors to have appropriate flashing & seals fitted to prevent water getting into building or to the frame work
For all installations of windows follow manufactures instructions or Installation & Fixing Guide at www.awa.org.au
Structural members Wind bracing & tie-down to be certified or designed by Structural Engineer
WC to be installed with 4.5/3 L dual flush cistern or better New Dwelling; to have Min. 50 % of specified bracing installed prior to roof going on
All taps & Shower roses to be AAA Conservation rating
All roof water to be discharged to Holding Tank Min 45,000 l storage Capicity
All waste water to be connected to approved effluent system
Stairs to B.C.A. Volume 2 Part 3.9.1
Timber Decks to be built to B.C.A. 3.10.6
These plans are for Certification & Building only. Items like Flooring, Tiles, Painting & other finishes
Cabinetry Etc. to be decide by Owner & Builder prior Contract being signed Items must comply to relevant codes
The Builder must have Building Approval for the proposed works from a Building Certifier prior to work commencing
Notes for Construction & Maintenance of Roofs
All timber trusses or rafters fixed in accord with AS 1684.2 for designated wind classification
Steel Roof battens fixed to Manufactures specifications for the spans, roofing type & Wind classification.
Timber roof battens fixed to AS1684.2 as per above
Roofing, Flashing & Gutters to be of compatible materials
Roof sheeting or tiles to be fixed to Manufactures specifications for N3 sites
Approved type sarking to be placed under roof sheet over battens fixed to Manufactures details
Screws to AS. 3566:2002 Class 3 or better. Blind rivets to be used screws & Rivets to be compatible material
Gutters to be fixed to AS/NZS 3500.3 2003. Gutter to have adequate fall to downpipes Min 1:500
Front of gutter to be lower than top of fascia or slots in the front of the gutter, or flashing behind gutter &
under the roof sheets fixed to roof battens to prevent water getting into roof cavity or soffit area
Adequate down pipes in appropriate places with rain water heads fitted Max 12 m spaces to be determined by Plumber
Recommend a good quality gutter guard be fitted to prevent leaf & other debris getting into gutter to block downpipes
Regular inspections & cleaning of gutters to be done depending on trees around the home
Regular cleaning & inspections of the roof is to be done including ensuring screws are still tight on the roof sheet
& neoprene washers are not cracking or degrading. Tiles are not cracked or loose & all grouting is in place & holding tiles firm & in place
(Recommended that a professional is called in with appropriate safety equipment to do inspections & cleaning)
Client: Scott Stewart Address: 797 Ringtail Creek Rd. Pomona Noosa Shire Council Mobile: 0407 693 018 Date 25/10/2021 7:43:21 AM
ACCOLADE Building Designs Drawn by: S.Horn Drawn for A3 Sheet
RPD: Lot 4 on RP 213871 Site Area : 34073 m² Wind Classification N3 Proprietor: Steven Horn Email: [email protected] Project Number
0521SS
Proposed Residence SHS & Timber Posts , Timber Framed, Sheet Roof QBCC Lic. 54806 Issue Date 25 - OCTOBER -2021 Sheet No. 8 of 9
Page 31
1. FALLS, SLIPS, TRIPS 2. FALLING OBJECTS 5. MANUAL TASKS 7. CONFINED SPACES
a) WORKING AT HEIGHTS LOOSE MATERIALS OR SMALL OBJECTS Components within this design with a mass in excess of 25kg EXCAVATION
DURING CONSTRUCTION Construction, maintenance or demolition work on or around this should be lifted by two or more workers or by mechanical lifting Construction of this building and some maintenance on the
Wherever possible, components for this building should be building is likely to involve persons working above ground level or device. Where this is not practical, suppliers or fabricators should building will require excavation and installation of items within
prefabricated off-site or at ground level to minimise the risk of above floor levels. Where this occurs one or more of the following be required to limit the component mass. excavations. Where practical, installation should be carried out
workers falling. However, construction of this measures should be taken to avoid objects falling from the area All material packaging, building and maintenance components using methods which do not require workers to enter the
building will require workers to be working at heights where a fall in where the work is being carried out onto persons below. should clearly show the total mass of packages and where excavation. Where this is not practical, adequate support for the
excess of two metres is possible and injury is likely to result from such 1. Prevent or restrict access to areas below where the work is practical all items should be stored on site in a way which excavated area should be provided to prevent collapse. Warning
a fall. The builder should provide a suitable barrier wherever a being carried out. minimises bending before lifting. Advice should be provided on signs and barriers to prevent accidental or unauthorised access to
person is required to work in a situation where falling more than 2. Provide toeboards to scaffolding or work platforms. safe lifting methods in all areas where lifting may occur. all excavations should be provided.
two metres is a possibility. 3. Provide protective structure below the work area. Construction, maintenance and demolition of this building will ENCLOSED SPACES
DURING OPERATION OR MAINTENANCE 4. Ensure that all persons below the work area have Personal require the use of portable tools and equipment. These should be For buildings with enclosed spaces where maintenance or other
For houses or other low-rise buildings where scaffolding is Protective Equipment (PPE). fully maintained in accordance with manufacturer’s access may be required:
appropriate: specifications and not used where faulty or (in the case of Enclosed spaces within this building may present a risk to persons
BUILDING COMPONENTS electrical equipment) not carrying a current electrical safety tag.
Cleaning and maintenance of windows, walls, roof or other During construction, renovation or demolition of this building, parts of entering for construction, maintenance or any other purpose. The
components of this building will require persons to be situated All safety guards or devices should be regularly checked and design documentation calls for warning signs and barriers to
the structure including fabricated steelwork, heavy panels and many Personal Protective Equipment should be used in accordance
where a fall from a height in excess of two metres is possible. Where other components will remain standing prior to or after supporting unauthorised access. These should be maintained throughout the
this type of activity is required, scaffolding, ladders or trestles should with manufacturer’s specification. life of the building. Where workers are required to enter enclosed
parts are in place. Contractors should ensure that temporary bracing
be used in accordance with relevant codes of practice, spaces, air testing equipment and Personal Protective Equipment
regulations or legislation.
or other required support is in place at all times when collapse which 6. HAZARDOUS SUBSTANCES should be provided.
may injure persons in the area is a possibility. ASBESTOS
For buildings where scaffold, ladders, trestles are not appropriate: SMALL SPACES
Cleaning and maintenance of windows, walls, roof or other For alterations to a building constructed prior to 1990:
Mechanical lifting of materials and components during construction, For buildings with small spaces where maintenance or other access
components of this building will require persons to be situated If this existing building was constructed prior to:
maintenance or demolition presents a risk of falling objects. may be required:
where a fall from a height in excess of two metres is possible. Where 1990 - it therefore may contain asbestos
Contractors should ensure that appropriate lifting devices are used, Some small spaces within this building will require access by
this type of activity is required, scaffolding, fall barriers or Personal 1986 - it therefore is likely to contain asbestos
that loads are properly secured and that access to areas below the construction or maintenance workers. The design documentation
Protective Equipment (PPE) should be used in accordance with either in cladding material or in fire retardant insulation material. In
load is prevented or restricted. calls for warning signs and barriers to unauthorised access. These
relevant codes of practice, regulations or legislation. either case, the builder should check and, if necessary, take
should be maintained throughout the life of the building. Where
appropriate action before demolishing, cutting, sanding, drilling or
workers are required to enter small spaces they should be
b) SLIPPERY OR UNEVEN SURFACES 3. TRAFFIC MANAGEMENT otherwise disturbing the existing structure.
scheduled so that access is for short periods. Manual lifting and
For building on a major road, narrow road or steeply sloping road: POWDERED MATERIALS other manual activity should be restricted in small spaces.
FLOOR FINISHES Specified Parking of vehicles or loading/unloading of vehicles on this roadway Many materials used in the construction of this building can cause
If finishes have been specified by designer, these have been may cause a traffic hazard. During construction, maintenance or harm if inhaled in powdered form. Persons working on or in the 8. PUBLIC ACCESS
selected to minimise the risk of floors and paved areas becoming demolition of this building designated parking for workers and loading building during construction, operational maintenance or demolition Public access to construction and demolition sites and to areas
slippery when wet or when walked on with wet shoes/feet. Any areas should be provided. Trained traffic management personnel should ensure good ventilation and wear Personal Protective under maintenance causes risk to workers and public. Warning
changes to the specified finish should be made in consultation with should be responsible for the supervision of these areas. Equipment including protection against inhalation while using signs and secure barriers to unauthorised access should be
the designer or, if this is not practical, surfaces with an equivalent or For building where on-site loading/unloading is restricted: powdered material or when sanding, drilling, cutting or otherwise provided. Where electrical installations, excavations, plant or loose
better slip resistance should be chosen. Construction of this building will require loading and unloading of disturbing or creating powdered material. materials are present they should be secured when not fully
FLOOR FINISHES By Owner materials on the roadway. Deliveries should be well planned to avoid supervised.
If designer has not been involved in the selection of surface TREATED TIMBER
congestion of loading areas and trained traffic management The design of this building may include provision for the inclusion of 9. OPERATIONAL USE OF BUILDING
finishes, the owner is responsible for the selection of surface finishes personnel should be used to supervise loading/unloading areas. treated timber within the structure. Dust or fumes from this material RESIDENTIAL BUILDINGS
in the pedestrian trafficable areas of this building. Surfaces should For all buildings:
be selected in accordance with AS HB 197:1999 and AS/NZ can be harmful. Persons working on or in the building during This building has been designed as a residential building. If it, at a
Busy construction and demolition sites present a risk of collision where construction, operational maintenance or demolition should ensure
4586:2004. deliveries and other traffic are moving within the site. A traffic later date, it is used or intended to be used as a workplace, the
good ventilation and wear Personal Protective Equipment including provisions of the Work Health and Safety Act 2011 or subsequent
STEPS, LOOSE OBJECTS AND UNEVEN SURFACES management plan supervised by trained traffic management
Due to design restrictions for this building, steps and/or ramps are protection against inhalation of harmful material when sanding, replacement Act should be applied to the new use.
personnel should be adopted for the work site. drilling, cutting or using treated timber in any way that may cause
included in the building which may be a hazard to workers carrying
harmful material to be released. Do not burn treated timber. 10.OTHER HIGH RISK ACTIVITY
objects or otherwise occupied. Steps should be clearly marked with 4. SERVICES
both visual and tactile warning during construction, maintenance, VOLATILE ORGANIC COMPOUNDS All electrical work should be carried out in accordance with Code
GENERAL Many types of glue, solvents, spray packs, paints, varnishes and
demolition and at all times when the building operates as a of Practice: Managing Electrical Risks at the Workplace, AS/NZ
Rupture of services during excavation or other activity creates a some cleaning materials and disinfectants have dangerous
workplace. 3012 and all licensing requirements.
variety of risks including release of hazardous material. Existing emissions. Areas where these are used should be kept well
Building owners and occupiers should monitor the pedestrian All work using Plant should be carried out in accordance with
services are located on or around this site. Where known, these are ventilated while the material is being used and for a period after
access ways and in particular access to areas where maintenance Code of Practice: Managing Risks of Plant at the Workplace.
identified on the plans but the exact location and extent of installation. Personal Protective Equipment may also be required.
is routinely carried out to ensure that surfaces have not moved or All work should be carried out in accordance with Code of
services may vary from that indicated. Services should be located The manufacturer’s recommendations for use must be carefully
cracked so that they become uneven and present a trip hazard. Practice: Managing Noise and Preventing Hearing Loss at Work.
using an appropriate service (such as Dial Before You Dig), considered at all times.
Spills, loose material, stray objects or any other matter that may Due to the history of serious incidents it is recommended that
appropriate excavation practice should be used and, where
cause a slip or trip hazard should be cleaned or removed from SYNTHETIC MINERAL FIBRE particular care be exercised when undertaking work involving steel
necessary, specialist contractors should be used.
access ways. Fibreglass, rockwool, ceramic and other material used for thermal or construction and concrete placement. All the above applies.
Locations with underground power:
Contractors should be required to maintain a tidy work site during sound insulation may contain synthetic mineral fibre which may be
Underground power lines MAY be located in or around this site. All
construction, maintenance or demolition to reduce the risk of trips harmful if inhaled or if it comes in contact with the skin, eyes or other
underground power lines must be disconnected or carefully
and falls in the workplace. Materials for construction or sensitive parts or the body. Personal Protective Equipment including
located and adequate warning signs used prior to any
maintenance should be stored in designated areas away from protection against inhalation of harmful material should be used when
construction, maintenance or demolition commencing.
access ways and work areas. installing, removing or working near bulk insulation material.
Locations with overhead power lines:
Overhead power lines MAY be near or on this site. These pose a risk TIMBER FLOORS
of electrocution if struck or approached by lifting devices or other This building may contain timber floors which have an applied finish.
plant and persons working above ground level. Where there is a Areas where finishes are applied should be kept well ventilated during
danger of this occurring, power lines should be, where practical, sanding and application and for a period after installation. Personal
disconnected or relocated. Where this is not practical adequate Protective Equipment may also be required. The manufacturer’s
warning in the form of bright coloured tape or signage should be recommendations for use must be carefully considered at all times.
used or a protective barrier provided.
THESE NOTES MUST BE READ AND UNDERSTOOD BY ALL INVOLVED IN THE PROJECT.
THIS INCLUDES (but is not excluded to): OWNER, BUILDER, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS, OPERATORS, MAINTAINERS, DEMOLISHERS.
THE ONSITE BUILDERS WORKPLACE HEALTH & SAFETY MANAGEMENT PLAN SPECIFIC TO THIS SITE OVERRIDES THESE NOTES
Client: Scott Stewart Address: 797 Ringtail Creek Rd. Pomona Noosa Shire Council Mobile: 0407 693 018 Date 25/10/2021 7:43:21 AM
ACCOLADE Building Designs Drawn by: S.Horn Drawn for A3 Sheet
RPD: Lot 4 on RP 213871 Site Area : 34073 m² Wind Classification N3 Proprietor: Steven Horn Email: [email protected] Project Number
0521SS
Proposed Residence SHS & Timber Posts , Timber Framed, Sheet Roof QBCC Lic. 54806 Issue Date 25 - OCTOBER -2021 Sheet No. 9 of 9
Page 32
October 2021 BUSHFIRE HAZARD ASSESSMENT Page: 20
797 Ringtail Creek Road, Pomona
[OCR of page images]
October 2021 BUSHFIRE HAZARD ASSESSM ENT Page: 20
797 Ringtail Creek Road, Pomona