Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Appendix G - development permit 132007.2398.02

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application G - Original Development Permit & Approved Plans Email 8 of 8.

of 20

Page text shows just the words. Original shows the document exactly as it was published.

                                                                               132007.2398.02

C.   Include 3 additional Conditions 114, 115 & 116
D.   Amend Advisory Note 1.
E.   Include an additional Advisory Note 13.

3    RELEVANT PERIOD OF APPROVAL

The relevant period for this development approval finishes on 23 June 2016.

4    CONSOLIDATED ASSESSMENT MANAGER CONDITIONS
1.   Development, including staging of the development, shall be undertaken in accordance
     with this approval and must generally comply with the approved plans of development.
     The approved plans are titled and numbered: -

      Plan Title                      Drawing      Revision        Date       Prepared by
                                     Reference       No.
      Overall Site Plan            CO-000-2014         D       02/02/2015     Palm Lake Works
                                   sheet 1 of 2
      Staging Plan                 CO-000-2014         D       02/02/2015     Palm Lake Works
                                   sheet 2 of 2
      Site Plan                    SD01                C       09/12/2014     Interworks
      Floor Plan                   SD02                B       09/12/2014     Interworks
      Elevations 1                 SD03                B       09/12/2014     Interworks
      Elevations 2                 SD04                B       09/12/2014     Interworks
      Clubhouse floor plan         DA102               2       26/11/2014     PAA Design
      Clubhouse roof plan          DA103               2       26/11/2014     PAA Design
      Clubhouse elevations         DA104               2       26/11/2014     PAA Design
      Clubhouse elevations and     DA105               2       26/11/2014     PAA Design
      sections
      Bowling Green floor plan     DA202               2       26/11/2014     PAA Design
      Bowling Green roof plan      DA203               2       26/11/2014     PAA Design
      Bowling Green elevations     DA204               2       26/11/2014     PAA Design
      Bowling Green elevations     DA205               2       26/11/2014     PAA Design
      and sections

     and as may be amended by these conditions.

General
2.   Deleted.
3.   Security in the form of a cash bond or trading bank guarantee to the sum of $100,000
     must be submitted, to secure performance of all conditions of this approval, prior to the
     commencement of Stage 1 of the development. The cash bond or trading bank
     guarantee will be returned on performance of the conditions of approval less any costs
     incurred by Council in respect of enforcing performance of this permit.




                                                                               Page 2 of 20
Log in to download the original file

Appendix G - development permit 132007.2398.02.pdf · 106 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.