Minor Change Existing Approval 131998 981643 3 [As Published]
4. ASSESSMENT MANAGER CONDITIONS
Building
1 The plans submitted for a Development Permit for building works are to comply with the
approved plans with the applicant to note that the aspect of disabled access to upper levels
may need consideration at time of lodgement of building works.
2 Construction work and other associated activities are permitted only during the hours of
7.00 a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except
where extended hours are approved by the Building Surveyor.
Health
3 The developer must provide approved refuse containers in accordance with requirements
of the Environmental Protection (Interim Waste) Regulations 1996 for the storage and
collection of refuse to the satisfaction of Council’s Environmental Health Officer.
4 The developer must provide an imperviously paved area to accommodate all refuse and
recycling containers to the reasonable satisfaction of Council’s Environmental Health
Officer. This area is to be aesthetically screened from any road frontage or adjoining
property boundary. A suitable hosecock, hoses and approved drainage outlet to Council’s
sewer, are to be located in the vicinity of the refuse container area for washing containers.
5 The developer is obtain a Trade Waste Permit for this business. The completed application
together with a fee of $125.00 and two (2) sets of professionally drawn plans showing the
Trade Waste requirements in accordance with the Noosa Trade Waste Policy are to be
submitted to Council. Approval is to be obtained prior to the commencement of any
construction associated with this development.
6 All refrigeration plant, including motors, shall be situated within the building or suitably
provided with noise reduction and shall be located as to prevent disturbance beyond the
subject land.
7 Airconditioning units shall be located in a manner which prevents noise disturbance beyond
the subject land.
8 The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
Engineering
9 The existing 83 off-street car parking spaces are to be maintained on the subject site.
10 The developer shall connect to Council's existing water supply and sewerage reticulation
systems at the developer's expense to the standards and requirements of Council's Shire
Engineer.
11 The applicant is to grant reciprocal easements over the common boundary between lots
897 & 898 on RP 904040. Such easements are to be in a form which will satisfy this
requirement.
12 The developer shall provide a metered water connection/metered water connections from
the water supply system to the proposed development, in accordance with Council's
standards and to the satisfaction of the Shire Engineer.
13 Filling is not approved for this site. Minimum floor levels for the development are defined
within the Planning Scheme and will be set by Council’s Surveyors upon application and
payment of the required fee.
14 Roof and surface water is to be collected on site and is to be discharged through a single
underground drain line into existing drainage at the Gibson Road frontage of the site, to the
satisfaction of the Shire Engineer. A Development Permit for building works shall not be
granted until the Shire Engineer has approved of the drainage scheme.
Page 2 of 7
Document Set ID: 23644212
Version: 2, Version Date: 20/03/2025