Approved Plan - OPW21-0279

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Anthony Kelly                                                                                        21354-001-Rev0
                                                                                                  17 September 2021

There were four general areas found to form part of the earthworks already undertaken at the time of our
assessment. Broadly speaking these were as follows:

       A driveway diversion running adjacent to the slope contours off the existing asphalted main driveway
        to the south-west. Earthworks were limited to surface stripping, and installation of swale drains to
        either side of the driveway extension.
       A southern area where minor, mostly cut, earthworks had been completed to form a level to gently
        sloping area of cleared ground.
       Formalisation of a pre-existing historical track feature had also been undertaken connecting the
        southern cleared area to the northern cleared area (see below). This was sidelong to the sloping
        ground (parallel to slope contours). Earthworks had been limited to initial surficial stripping, and
        cutting of a drainage ditch along the upslope (western) side of the alignment.
       A northern cleared area was present to the northern side of the existing residence, being mostly in
        cut due to the topographical position, with a level to gently sloping finished surface.
All features as part of the existing earthworks assessed had been left with compacted roadbase materials at
surface, and we understand that asphalting of the driveway extension and formalised access track are
proposed to finish. All cut (and minor fill) batters had been seeded via hydromulching, with some sporadic
coverage of grass already present at the time of our assessment.

An indication of the location of the site features present is given below in Text Figure 2.




                                                                                                      Approx. northern
                                                                                                      cleared area




                                                                                 Approx. formalised
                                                                                 existing track




                                                                        Approx. southern
                                                                        cleared area
                                         Approx. driveway diversion


Text Figure 2: Recent aerial image annotated with location of site features (courtesy Near Map, 15 May 2021)




                                                           2/12
Log in to download the original file

Approved Plan - OPW21-0279.pdf · 6.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.