Council archive · source document
Appendix C - Geotech Report · RAL22/0021
PROPOSED RESIDENTIAL DEVELOPMENT
39 PICTURE POINT CRESCENT, NOOSA HEADS
Table of Contents
1.0 INTRODUCTION ........................................................................................................................................................ 1
2.0 PROPOSED DEVELOPMENT ................................................................................................................................... 1
3.0 METHOD OF INVESTIGATION ................................................................................................................................. 2
4.0 RESULTS OF INVESTIGATION ................................................................................................................................ 2
4.1 Site Description............................................................................................................................................. 2
4.2 Topography................................................................................................................................................... 4
4.3 Geology ........................................................................................................................................................ 5
4.4 Subsurface Conditions.................................................................................................................................. 5
4.5 Groundwater ................................................................................................................................................. 6
4.6 Surface Drainage .......................................................................................................................................... 6
4.7 Vegetation .................................................................................................................................................... 7
4.8 Buildings and Other Structures ..................................................................................................................... 7
5.0 SLOPE STABILITY ASSESSMENT .......................................................................................................................... 8
5.1 Existing Conditions ....................................................................................................................................... 8
5.2 Stability Assessment..................................................................................................................................... 9
6.0 GEOTECHNICAL RECOMMENDATIONS .............................................................................................................. 11
6.1 Development Limitations & Stability Discussion ......................................................................................... 11
6.2 Earthworks .................................................................................................................................................. 12
6.2.1 Site Preparation and Trafficability ......................................................................................................... 12
6.2.2 Excavations ........................................................................................................................................... 13
6.2.3 Filling..................................................................................................................................................... 13
6.3 Building Foundations .................................................................................................................................. 14
6.3.1 Indicative Site Classification.................................................................................................................. 14
6.3.2 Footing Design ...................................................................................................................................... 14
6.4 Temporary and Permanent Retention......................................................................................................... 15
6.5 Drainage ..................................................................................................................................................... 16
7.0 SUMMARY & CONCLUSIONS................................................................................................................................ 17
8.0 LIMITATIONS .......................................................................................................................................................... 17
10 February 2023
Report No. 22511-001-Rev0 iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Geotech Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.