1.0 INTRODUCTION
This report details the results of a geotechnical investigation undertaken for a proposed residential
development at 39 Picture Point Crescent, Noosa Heads. The investigation was performed by Tectonic for
HM Property Pty Ltd, generally in accordance with Proposal P22802-Rev0, dated 15 December 2022.
The investigation comprised drilling of boreholes at two locations across accessible areas of the
development footprint, together with in-situ soil strength testing. One stand-alone in situ strength test (using
the dynamic cone penetrometer [DCP] method) was also undertaken. This report summarises the results of
the investigation and provides geotechnical recommendations regarding earthworks and footings, together
with temporary and permanent retention.
In summary, subject to the implementation of the recommendations made herein, it is assessed that there
would be a Low Risk of slope instability affecting the proposed development in accordance with the
Australian Geomechanics Society Guidelines for Landslide Risk Management, dated March 2007 (AGS
2007).
2.0 PROPOSED DEVELOPMENT
Based on the provided information we understand that it is proposed to reconfigure a single existing lot
(Lot 2 on RP220514) in to two separate lots being an equitable 723 m2 in land area. Concept architectural
drawings provided to us with the project brief (Ref. Chris Clout Design [Clout], C1.0 to C5.0, dated 4
November 2022) indicate that following subdivision, each new lot may be developed with residences
extending over most of the available area of the lots.
The residences would be of three storeys height to the Picture Point Crescent frontage (upslope/south), with
a partial lower level on the downslope side (north) extending the overall height to four storeys. Thus, it is
anticipated that bulk excavations for the lower storey would reach about 3 m to 4 m below the existing
ground levels in certain locations. Filling of 2 m to 3 m height is shown on the preliminary architectural
sections on the downslope side of the development to the north, but the extent of this is unclear. Filling to
this extent is not permissible from a slope stability perspective, as detailed in Section 6.1 herein.
Excavations will likely extend close to some of the site boundaries to site the lower level of the proposed
building and therefore, temporary retention will likely be required.
Isolated deeper excavations may be required for underground services and footings or other elements. An
existing sewer running through the building area will be realigned to the northern side of the proposed
building envelopes as part of the works.
Text Figure 1 below presents a layout plan and cross-sectional view of the proposed development.
Text Figure 1: Layout plan (LHS) and a cross-sectional view (RHS) of proposed development (courtesy Clout)
10 February 2023
Report No. 22511-001-Rev0 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Geotech Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.