Council archive · source document
20220109 - Geotech · OPW23/0182
Attached to the e-mail Operational Works Application OPW23/0182 - 21 Maher Tce, Sunshine Beach QLD 4567 (Email 2 of 4).
Attached to the e-mail Operational Works Application OPW23/0182 - 21 Maher Tce, Sunshine Beach QLD 4567 (Email 1 of 4).
PROPOSED RESIDENCE
21 MAHER TERRACE, SUNSHINE BEACH
Table of Contents
1.0 INTRODUCTION ........................................................................................................................................................ 1
2.0 PROPOSED DEVELOPMENT ................................................................................................................................... 1
3.0 METHOD OF INVESTIGATION ................................................................................................................................. 2
4.0 RESULTS OF INVESTIGATION ................................................................................................................................ 2
4.1 Site Description............................................................................................................................................. 2
4.2 Topography................................................................................................................................................... 4
4.3 Geology ........................................................................................................................................................ 5
4.4 Subsurface Conditions.................................................................................................................................. 6
4.5 Groundwater ................................................................................................................................................. 6
4.6 Surface Drainage .......................................................................................................................................... 7
5.0 SLOPE STABILITY ASSESSMENT .......................................................................................................................... 7
5.1 Existing Conditions ....................................................................................................................................... 7
5.2 Stability Assessment..................................................................................................................................... 8
5.2.1 Quantitative Assessment ........................................................................................................................ 9
6.0 GEOTECHNICAL RECOMMENDATIONS .............................................................................................................. 11
6.1 Additional Investigation ............................................................................................................................... 11
6.2 Development Limitations ............................................................................................................................ 11
6.3 Earthworks – General ................................................................................................................................. 11
6.3.1 Site Preparation and Trafficability ......................................................................................................... 11
6.3.2 Excavations ........................................................................................................................................... 12
6.3.3 Filling..................................................................................................................................................... 13
6.4 Building Foundations .................................................................................................................................. 13
6.4.1 Indicative Site Classification.................................................................................................................. 13
6.4.2 Footing Design ...................................................................................................................................... 13
6.5 Temporary and Permanent Retention......................................................................................................... 15
6.6 Drainage ..................................................................................................................................................... 16
7.0 SUMMARY & CONCLUSIONS................................................................................................................................ 17
8.0 LIMITATIONS .......................................................................................................................................................... 17
16 July 2021
Report No. 21236-001-Rev0 iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20220109 - Geotech.pdfRelated documentApplication case desk ↗
20220109 - 21 Maher Tce, Sunshine Beach - Construction of Detached Dwelling and Swimming P - 21236-001-Geotech 21 Maher Tce.pdfRelated documentApplication case desk ↗
20220109 - 21 Maher Tce, Sunshine Beach - Construction of Detached Dwelling and Swimming Pool - Geotech.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.