App C - Current Decision Notice and Approved Plans
25. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Site Access and Driveways
26. A sealed access driveway must be provided from George Street to all parking and
manoeuvring areas of the development. The works must be undertaken generally in
accordance with SCG Consulting Engineer’s Operational Works Driveway & Access Plan
(00469-OW4.1) and Operational Works Driveway Details Plan (00469-OW4.2) dated March
25 and must include in particular:
a. a driveway crossover in accordance with Council’s standard drawings RS-049, RS-050
and any associated addendum.
Car Parking
A minimum of 4 car parking spaces must be provided and marked on the site and generally
in accordance with SCG Consulting Engineer’s Operational Works Driveway & Access Plan
(00469-OW4.1) dated March 25 and must include in particular:
a. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities
Pedestrian Facilities
27. Construct a 1.5 metre wide footpath within the road verge for the entire length of the site’s
frontage to George Street.
Condition 26 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Stormwater Drainage
28. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with SCG Consulting
Engineer’s Operational Works Stormwater Management Plan (00469-SW1.1) dated March
25 and must include in particular:
a. 3,000L of on-site rainwater retention per dwelling.
Condition 27 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
29. Underground reticulated electricity and telecommunication services must be provided to
each lot/unit in accordance the standards and requirements of the relevant service provider.
30. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
31. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Earthworks and Retaining Walls
32. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be undertaken in accordance with the conditions
of this approval, be generally in accordance with SCG Consulting Engineer’s Operational
Works Earthworks Plan (00469-OW3.1) dated March 25, and contained entirely within the
subject site unless written permission from the respective landowner(s) is provided to
Council.
Page 5 of 18
Document Set ID: 24223542
Version: 4, Version Date: 15/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (App C - Current Decision Notice and Approved Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.