Original source · versioned page text
Application Form
Attached to the e-mail Operational Works Application OPW19/0133 - DA Form 1 - Pre-lim Construction Management Plan - Civil Plans - 10 Opal St Cooroy.
The original of this document is very large (11.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
6.3) Additional aspects of development L Additional aspects of development are relevant to this development application and the details for these aspects that would be required under Part 3 Section 1 of this form have been attached to this development application LJ Not required Section 2 — Further development details 7) Does the proposed development application involve any of the following? Material change of use (I Yes — complete division 1 if assessable against a local planning instrument Reconfiguring a lot LJ Yes - complete division 2 Operational work Yes — complete division 3 Building work (1 Yes - complete DA Form 2 - Building work details Division 1 — Material change of use Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local planning instrument. 8.1) Describe the proposed material change of use Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor proposed use (include each definition in a new row) units (if applicable) area (m?) (if applicable) 8.2) Does the proposed use involve the use of existing buildings on the premises? LC Yes ET No Division 2 — Reconfiguring a lot Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot. 9.1) What is the total number of existing lots making up the premises? 9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes) (1 Subdivision (complete 10) LC Dividing land into parts by agreement (complete 11) (J Boundary realignment (complete 12)) C1 Creating or changing an easement giving access to a lot from aconstruction road (complete 13)) 10) Subdivision 10.1) For this development, how many lots are being created and what is the intended use of those lots: Intended use of lots created Residential Commercial Industrial Other, please specify: Number of lots created 10.2) Will the subdivision be staged? C1 Yes — provide additional details below LI No How many stages will the works include? What stage(s) will this development application apply to? Page 4 DA Form 1 — Development Application details Version 1.1— 22 JUNE 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.