Properly made submission (object) Brett Kennedy MCU13/0171
Very large file (11.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Proposed comparisons with traffic levels and noise levels with what was there when
the site was an active brickworks have no validity and should not be made even though they
have been used to show the development in a comparatively better light. The brickworks
are gone. This is a new commercial industry proposed for land that is zoned as rural.
Mine is a rural residential property and I have a right for privacy, quiet and to feel
safe in my own property. It defies explanation that there could be a factory and tourist
attraction adjacent to a waterway with a history of flood events on land that is zoned as
rural and that is surrounded by other rural and rural settlement properties.
The brickworks was a relic from times past. It did not fit well with the land use
practices of the area at the time of its closure and numerous residents were glad to see it
closed. To replace it with more industry would be objectionable to a number of residents for
the same reasons that the brickworks was.
The new soft drink factory would very much appear to be the tip of the iceberg in
the process of industrial development this rural site. Repeated mention has been made in
media releases, in planning documents, in the mass produced note points in the letters of
support for the development and by a representative of the development that development
of the site would continue for uses other than and extra to the establishment of a soft drink
factory on this rurally zoned site.
A waste transfer station, a base station for grey nomads, a home for weekend
markets and an industry "like a rum distillery" have all been suggested so far. In considering
this application, the indication that further development of the site for various other
industries is a crucial point. Every new industry would be out of character with the rural
zoning and the rural settlement zoning of the properties that surround the site and line the
length of Lake Macdonald Dive and the roads that are tributaries of it.
As it is clear that there is intention to further develop this land and that the softdrink
factory is only the first part of the development of the site, I put forward that this
development submission is not extensive enough. A development proposal should have
been submitted for the entire site and not just the parcel of land that the proposed factory
would sit on. As such, concerned residents, myself included, would have a better
understanding of the long term effects these entire group of developments would have.
Various meetings have been held with regards to possible uses of the site. I have
only become aware of some of these meetings after they have occurred. As my property is
literally across the road from the development and that each and everyone of the uses of
the rural property across the road is put to will have a cumulative effect on my life on my
property and the value of my property, I feel that I should have been included in these
~
meetings. At no time was I contacted. This clearly demonstrates lack of
regard for residents of properties that surround the proposed development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Properly made submission (object) Brett Kennedy MCU13/0171Related documentApplication case desk ↗
About this file
- File size
- 11.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.