Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published)

of 72

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Referral Agency Response — Material Change of Use
5 3.3.16 Integrated Planning Act 1997

1. Application information

1.1. Applicant’s name: Noosa Shire Council

1.2, Property description: 77 SP177938 - Noosa Shire

1.3. Assessment Manager/Reference: Noosa Shire Council

14. Date application was referred to Department: 26 April 2005

1.5. Departmental Reference: eLVAS Case No: 2005/101216, File Ref. No:
GYP/000280, Trackjob No: 1RO40SNAM0004

1.6, Type/s of development sought by the application:

O Material Change of Use

2. Concurrence Agency response:

The Chief Executive of the Department of Natural Resources and Mines directs that the
following conditions must be imposed on any approval given by the Assessment Manager:

2.1 This permit does not authorise the clearing of any native vegetation that is on any land
not contained within the area identified as Permit A on the attached Referral Agency
Response (Vegetation) Plan RARP2005/101216,

2.2 Expansion of the area designated for Waste Disposal and Recycling Facility within
Lot 77 on SP177938 is restricted to the area identified as Permit A on the attached
Referral Agency Response (Vegetation) Plan RARP2005/101216.

2.3 Prior to clearing for the establishment of additional landfill cells and waste
management facilities, a storm-water management and sediment control plan that
prevents storm-water, sediment and other possible contaminants from encroaching into
areas outside of the area of Permit A on RARP2005/101216, must be developed and
instituted so as to be effective during the operational works stage of the site
preparation and landfill construction.

2.4 The design and construction of new landfill cells must incorporate a leachate
management system that prevents the escape of water from the landfill cells into the
surrounding environment.

2.5 The leachate management system must incorporate a groundwater monitoring system
and response strategy that is capable of rapid identification of cell leakage and
rectification measures,

2.6 The design and construction of the expanded waste management facility must
incorporate a storm-water control system that will prevent, in perpetuity, storm-water,
sediment and other possible contaminants from encroaching into surrounding areas of
remnant vegetation.

2.7 All works are to be undertaken in accordance with Environmental Protection Agency
Guidelines for Landfill siting, design, operation and rehabilitation, Waste Disposal —
ERA 75.

IDAS Referral Agancy Response:

Page 16 of 72

Document Set ID: 24377726
Version: 13, Version Date: 23/12/2025
Log in to download the original file

Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published).pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.