Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published)
12. The person acting on this permit shall apply and obtain all other necessary permits
including crane, road opening, hoarding, footpath occupation and/or any other approvals
required under any other Act or By-Law.
13. The transportation of all materials to and from the site shall be undertaken in a manner
such that no particulate matter escapes onto a public road. All vehicles carrying
materials either to or from the site shall be covered to prevent materials including dust
being windblown from the vehicle.
Additional conditions 15 February 2024
14. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the use
continues.
Approved Plans
15. Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed in the table/s below. The plans must be amended to
incorporate the amendments listed within the table below and resubmitted to Council
prior to the commencement of any works commencing on the site.
Plan No. Rev. Plan/Document Name Date
501042 CO2 A Proposed offset planting plan prepared 7/12/2023
by Noosa Council
M25-0445Rpt A Flood Impact Assessment prepared by February 2025
Covey
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
M25-0042Rpt A Stormwater Management Plan prepared February 2025
by Covey
▪ Specify the final HES basin detail from the range of options
Amendments
presented in the report, including consideration of whether
a Type-B HES basin may present a lower-risk option
compared to the flap-gated arrangement proposed to
prevent back-flows into the Type-A arrangement as
currently proposed;
▪ Include all details for the sizing and proposed levels of the
HES basin within the body of the report, based on recent
detailed survey at the point of discharge and downstream;
and
▪ Include construction-phase erosion and sediment control
plans which document how the transition from the current
HES basin location to the ultimate location (including filling
for the RRA pad) will be achieved.
*(Refer to Advisory Note)
Page 3 of 72
Document Set ID: 24377726
Version: 13, Version Date: 23/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.